A30 eastbound Chybucca - lane closure (56/2 to 58/2)
ClearedA30 eastbound Chybucca - lane closure (56/2 to 58/2)
- Start time
- Fri, Apr 17, 2026 5:00 AM
- Expected end
- Fri, Apr 17, 2026 2:30 PM
- Duration
- 9 hours 30 minutes
- Road
- A30 – A30 Eastbound Between A390 And A39 Near Newquay (West)
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Mar 20, 2026 1:49 PM
- Last updated
- Fri, Apr 17, 2026 12:28 PM
- Cleared
- Fri, Apr 17, 2026 2:30 PM
- Latest update: A30 eastbound Chybucca - lane closure (56/2 to 58/2)
- Coordinates
- 50.297827, -5.121365
- Latitude span
- 50.294939 – 50.300674
- Longitude span
- -5.136932 – -5.110027
- Bounding box centre
- 50.297807, -5.123480
- Location descriptions
-
- A30 eastbound between A390 and A39 near Newquay (west)
- Feed validity status
- Planned
- Overall feed start
- Fri, Apr 17, 2026 5:00 AM
- Overall feed end
- Fri, Apr 17, 2026 2:30 PM
- Feed window length
- 9 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- A30 eastbound between A390 and A39 near Newquay (west)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {F3B0FCD2-6E2D-35F4-807C-F1E714FDC780}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 588 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.2983 -5.117379 50.298669 -5.115801 50.298963 -5.114724 50.299178 -5.114018 50.299538 -5.112908 50.299805 -5.112154 50.3 -5.111656 50.300371 -5.110709 50.300674 -5.110027
Segment 2
4 coordinate pairs- Description
- A30 eastbound between A390 and A39 near Newquay (west)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {B7B0FE19-F165-1EF5-82D9-11DFE6EAE705}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 485 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.297097 -5.123933 50.297324 -5.122591 50.297806 -5.119924 50.2983 -5.117379
Segment 3
8 coordinate pairs- Description
- A30 eastbound between A390 and A39 near Newquay (west)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {BEF82E95-2BA8-6C60-52FA-365ED404078F}
- Linear Element Type
- B Carriageway
- From Distance
- 545 m
- To Distance
- 1,503 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.294939 -5.136932 50.295132 -5.136135 50.295614 -5.133724 50.295923 -5.13196 50.296327 -5.129098 50.296577 -5.127351 50.296723 -5.126323 50.297097 -5.123933
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -5.117379, 50.298300
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-5.117379,
50.2983
],
[
-5.115801,
50.298669
],
[
-5.114724,
50.298963
],
[
-5.114018,
50.299178
],
[
-5.112908,
50.299538
],
[
-5.112154,
50.299805
],
[
-5.111656,
50.3
],
[
-5.110709,
50.300371
],
[
-5.110027,
50.300674
],
[
-5.123933,
50.297097
],
[
-5.122591,
50.297324
],
[
-5.119924,
50.297806
],
[
-5.117379,
50.2983
],
[
-5.136932,
50.294939
],
[
-5.136135,
50.295132
],
[
-5.133724,
50.295614
],
[
-5.13196,
50.295923
],
[
-5.129098,
50.296327
],
[
-5.127351,
50.296577
],
[
-5.126323,
50.296723
],
[
-5.123933,
50.297097
]
]
]
}
View road section coordinates
[
[
[
-5.117379,
50.2983
],
[
-5.115801,
50.298669
],
[
-5.114724,
50.298963
],
[
-5.114018,
50.299178
],
[
-5.112908,
50.299538
],
[
-5.112154,
50.299805
],
[
-5.111656,
50.3
],
[
-5.110709,
50.300371
],
[
-5.110027,
50.300674
],
[
-5.123933,
50.297097
],
[
-5.122591,
50.297324
],
[
-5.119924,
50.297806
],
[
-5.117379,
50.2983
],
[
-5.136932,
50.294939
],
[
-5.136135,
50.295132
],
[
-5.133724,
50.295614
],
[
-5.13196,
50.295923
],
[
-5.129098,
50.296327
],
[
-5.127351,
50.296577
],
[
-5.126323,
50.296723
],
[
-5.123933,
50.297097
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Newquay
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Fri, Mar 20, 2026 1:49 PM
- Record versioned
- Fri, Apr 17, 2026 12:28 PM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 eastbound Zelah - lane closure (61/0 to 61/5)
Planned Roadworks National HighwaysExpected to clear in 9 hours 28 minutes
A30 eastbound Zelah - lane closure (61/0 to 61/5)
A30 eastbound Okehampton to Whiddon Down - lane closure
Planned Roadworks National HighwaysStarts in 13 hours 58 minutes
A30 eastbound Okehampton to Whiddon Down - lane closure
A30 Westbound Jct 29 lane 1 closure
Planned Roadworks National HighwaysStarts in 13 hours 58 minutes
A30 Westbound Jct 29 lane 1 closure
A30 Westbound Exeter Airport to M5 Jct 29 lane 1, 2 closure
Cleared Roadworks National HighwaysCleared 2 days 6 hours ago
A30 Westbound Exeter Airport to M5 Jct 29 lane 1, 2 closure
A30 eastbound Zelah - lane closure (61/0 to 61/5)
Cleared Roadworks National HighwaysCleared 2 days 14 hours ago
A30 eastbound Zelah - lane closure (61/0 to 61/5)
A38 eastbound Island Shop exit slip carriageway closure
Cleared Roadworks National HighwaysCleared 3 days 36 minutes ago
A38 eastbound Island Shop exit slip carriageway closure