A27 westbound lane 2 closure
ClearedA27 westbound lane 2 closure
- Start time
- Tue, Mar 24, 2026 8:16 PM
- Expected end
- Wed, Mar 25, 2026 6:00 AM
- Duration
- 9 hours 44 minutes
- Road
- A27 – A27 Eastbound Between A22 Polegate East And A259
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Singlecarriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Mar 24, 2026 8:17 PM
- Last updated
- Wed, Mar 25, 2026 2:56 AM
- Cleared
- Wed, Mar 25, 2026 6:00 AM
- Latest update: A27 westbound lane 2 closure
- Coordinates
- 50.820603, 0.277209
- Latitude span
- 50.819983 – 50.821092
- Longitude span
- 0.275886 – 0.279138
- Bounding box centre
- 50.820538, 0.277512
- Location descriptions
-
- A27 eastbound between A22 Polegate East and A259
- Feed validity status
- Active
- Overall feed start
- Tue, Mar 24, 2026 8:16 PM
- Overall feed end
- Wed, Mar 25, 2026 6:00 AM
- Feed window length
- 9 hours 44 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- A27 eastbound between A22 Polegate East and A259
- Carriageway
- Single Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Both
- Height Grade
- Start1 End2
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {36EF807F-EDFD-4FB4-AD33-62FDF1CC6519}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 256 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.821062 0.275934 50.820603 0.276998 50.820414 0.277567 50.820007 0.279008 50.819983 0.279138
Segment 2
2 coordinate pairs- Description
- A27 eastbound between A22 Polegate East and A259
- Carriageway
- Single Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {F0507C13-85C6-4C9D-9B27-F1ED573440B2}
- Linear Element Type
- A Carriageway
- From Distance
- 28 m
- To Distance
- 33 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.821092 0.275886 50.821062 0.275934
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- 0.275934, 50.821062
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.275934,
50.821062
],
[
0.276998,
50.820603
],
[
0.277567,
50.820414
],
[
0.279008,
50.820007
],
[
0.279138,
50.819983
],
[
0.275886,
50.821092
],
[
0.275934,
50.821062
]
]
]
}
View road section coordinates
[
[
[
0.275934,
50.821062
],
[
0.276998,
50.820603
],
[
0.277567,
50.820414
],
[
0.279008,
50.820007
],
[
0.279138,
50.819983
],
[
0.275886,
50.821092
],
[
0.275934,
50.821062
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Mar 24, 2026 8:17 PM
- Record versioned
- Wed, Mar 25, 2026 2:56 AM
- Coordinate source
- Geometry
Driving on the A27? See every live closure, roadwork and planned restriction on this road.
A27 live closuresRelated incidents
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
Active Roadworks National HighwaysExpected to clear in 4 days 8 hours
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
A27 eastbound Falmer exit slip road closure
Planned Roadworks National HighwaysStarts in 8 hours 19 minutes
A27 eastbound Falmer exit slip road closure
A27 eastbound Falmer exit slip road closure
Cleared Roadworks National HighwaysCleared 10 hours 40 minutes ago
A27 eastbound Falmer exit slip road closure
A27 both directions Clapham to Grove Lodge carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 6 hours ago
A27 both directions Clapham to Grove Lodge carriageway closure
A27 eastbound Crossbush to Clapham Interchange carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 5 hours ago
A27 eastbound Crossbush to Clapham Interchange carriageway closure
A27 westbound Hangleton exit slip road closure
Cleared Roadworks National HighwaysCleared 1 day 6 hours ago
A27 westbound Hangleton exit slip road closure