A27 westbound Hangleton exit slip road closure

Cleared

A27 westbound Hangleton exit slip road closure

Start time
Fri, Jun 12, 2026 7:00 PM
Expected end
Sat, Jun 13, 2026 4:00 AM
Duration
9 hours
Road
A27 – A27 Westbound Between A2038 And A293
Category
Road Maintenance
Direction
Westbound
Carriageway
Dual Carriageway
Reason
Tree And Vegetation Cutting Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Dec 4, 2025 12:52 PM
Last updated
Sat, Jun 13, 2026 3:52 AM
Cleared
Sat, Jun 13, 2026 4:00 AM
  • Latest update: A27 westbound Hangleton exit slip road closure
Coordinates
50.853887, -0.208045
Latitude span
50.852959 – 50.855023
Longitude span
-0.210696 – -0.204408
Bounding box centre
50.853991, -0.207552
Location descriptions
  • A27 westbound between A2038 and A293
  • A27 westbound exit for A293
Feed validity status
Planned
Overall feed start
Fri, Jun 12, 2026 7:00 PM
Overall feed end
Sat, Jun 13, 2026 4:00 AM
Feed window length
9 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

4 coordinate pairs
Description
A27 westbound between A2038 and A293
Carriageway
Dual Carriageway
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
West Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{7A4B8533-0E1B-4519-B732-42E63F6E5ECB}
Linear Element Type
B Carriageway
From Distance
1,688 m
To Distance
1,878 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.855023 -0.204408
50.854486 -0.206292
50.854352 -0.206786
50.854326 -0.206873

Segment 2

7 coordinate pairs
Description
A27 westbound exit for A293
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
West Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{628F85A9-5D33-42A5-B0AD-44803143D206}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
309 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.854326 -0.206873
50.854073 -0.207501
50.853893 -0.208034
50.853273 -0.209876
50.853049 -0.21051
50.852997 -0.21064
50.852959 -0.210696
Geometry type
MultiLineString
Geometry points
11
First coordinate pair
-0.204408, 50.855023
Road section segments
1
Road section points
11
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.204408,
                50.855023
            ],
            [
                -0.206292,
                50.854486
            ],
            [
                -0.206786,
                50.854352
            ],
            [
                -0.206873,
                50.854326
            ],
            [
                -0.206873,
                50.854326
            ],
            [
                -0.207501,
                50.854073
            ],
            [
                -0.208034,
                50.853893
            ],
            [
                -0.209876,
                50.853273
            ],
            [
                -0.21051,
                50.853049
            ],
            [
                -0.21064,
                50.852997
            ],
            [
                -0.210696,
                50.852959
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.204408,
            50.855023
        ],
        [
            -0.206292,
            50.854486
        ],
        [
            -0.206786,
            50.854352
        ],
        [
            -0.206873,
            50.854326
        ],
        [
            -0.206873,
            50.854326
        ],
        [
            -0.207501,
            50.854073
        ],
        [
            -0.208034,
            50.853893
        ],
        [
            -0.209876,
            50.853273
        ],
        [
            -0.21051,
            50.853049
        ],
        [
            -0.21064,
            50.852997
        ],
        [
            -0.210696,
            50.852959
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Thu, Dec 4, 2025 12:52 PM
Record versioned
Sat, Jun 13, 2026 3:52 AM
Coordinate source
Geometry

Driving on the A27? See every live closure, roadwork and planned restriction on this road.

A27 live closures

Related incidents

A27 eastbound Falmer exit slip road closure

Planned Roadworks National Highways
Brighton And Hove A27 · A27 Eastbound Exit For B2123

Expected to clear in 8 hours 50 minutes

Started 13 Jun 2026, 19:00 Expected clear 14 Jun 2026, 05:00

A27 eastbound Falmer exit slip road closure

Category: Road Maintenance
View update

A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)

Active Roadworks National Highways
Chichester A27 · A27 Eastbound Between A259 Near Emsworth And A259 Near Chichester (West)

Expected to clear in 4 days 22 hours

Started 9 Jun 2026, 01:05 Expected clear 18 Jun 2026, 19:00

A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)

Category: Construction Work
View update

A27 both directions Clapham to Grove Lodge carriageway closure

Cleared Roadworks National Highways
Worthing A27 · A27 Eastbound Between A280 And A24 Near Worthing (West)

Cleared 16 hours 9 minutes ago

Started 12 Jun 2026, 20:00 Ended 13 Jun 2026, 04:00

A27 both directions Clapham to Grove Lodge carriageway closure

Category: Road Maintenance
View update

A27 eastbound Crossbush to Clapham Interchange carriageway closure

Cleared Roadworks National Highways
Bognor Regis A27 · A27 Eastbound Between A284 Near Arundel (East) And A280

Cleared 15 hours 9 minutes ago

Started 12 Jun 2026, 20:00 Ended 13 Jun 2026, 05:00

A27 eastbound Crossbush to Clapham Interchange carriageway closure

Category: Road Maintenance
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Cleared Roadworks National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth

Cleared 15 hours 9 minutes ago

Started 12 Jun 2026, 19:00 Ended 13 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound lane 2 closure

Cleared Roadworks National Highways
Brighton And Hove A27 · A27 Eastbound At A Minor Junction Between A23 And A270 Near Brighton (East)

Cleared 1 day 1 hour ago

Started 12 Jun 2026, 19:00 Ended 12 Jun 2026, 19:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update