A27 eastbound lane 2 closure

Planned

A27 eastbound lane 2 closure

Start time
Thu, Jan 29, 2026 8:00 PM
Expected end
Fri, Jan 30, 2026 6:00 AM
Duration
10 hours
Road
A27 – A27 Westbound At A Minor Junction Between A29 Near Bognor Regis (West) And A285 Near Chichester (East)
Category
Road Maintenance
Direction
Clockwise
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 1 lanes affected
Reason
Repair Work
Active
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Mon, Jan 19, 2026 1:03 PM
Last updated
Thu, Jan 29, 2026 8:05 AM
Cleared
Fri, Jan 30, 2026 6:00 AM
  • Latest update: A27 eastbound lane 2 closure
Coordinates
50.855250, -0.714632
Latitude span
50.854640 – 50.855532
Longitude span
-0.721649 – -0.712126
Bounding box centre
50.855086, -0.716888
Location descriptions
  • A27 westbound at a minor junction between A29 near Bognor Regis (west) and A285 near Chichester (east)
  • A27 eastbound at a minor junction between A285 near Chichester (east) and A29 near Bognor Regis (west)
  • A27 eastbound between A285 near Chichester (east) and A29 near Bognor Regis (west)
Feed validity status
Planned
Overall feed start
Thu, Jan 29, 2026 8:00 PM
Overall feed end
Fri, Jan 30, 2026 6:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

3 coordinate pairs
Description
A27 westbound at a minor junction between A29 near Bognor Regis (west) and A285 near Chichester (east)
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
Clockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{7D53660F-2370-402A-973D-143D5E1C364C}
Linear Element Type
Other
From Distance
0 m
To Distance
13 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.855364 -0.712443
50.8554 -0.712414
50.855462 -0.712341

Segment 2

4 coordinate pairs
Description
A27 eastbound at a minor junction between A285 near Chichester (east) and A29 near Bognor Regis (west)
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
Clockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{72A7E940-39C8-45D7-AA2C-E9CCA00C0140}
Linear Element Type
Other
From Distance
0 m
To Distance
17 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.855462 -0.712341
50.85548 -0.712312
50.855506 -0.712269
50.855532 -0.712126

Segment 3

11 coordinate pairs
Description
A27 eastbound between A285 near Chichester (east) and A29 near Bognor Regis (west)
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{B0D78104-7FC2-4F44-9701-6406C695D203}
Linear Element Type
A Carriageway
From Distance
264 m
To Distance
917 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.85464 -0.721649
50.854826 -0.719974
50.854932 -0.718962
50.85506 -0.717495
50.855099 -0.716968
50.855169 -0.715986
50.855275 -0.714108
50.855278 -0.71401
50.855315 -0.712899
50.855339 -0.712628
50.855364 -0.712443
Geometry type
MultiLineString
Geometry points
18
First coordinate pair
-0.712443, 50.855364
Road section segments
1
Road section points
18
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.712443,
                50.855364
            ],
            [
                -0.712414,
                50.8554
            ],
            [
                -0.712341,
                50.855462
            ],
            [
                -0.712341,
                50.855462
            ],
            [
                -0.712312,
                50.85548
            ],
            [
                -0.712269,
                50.855506
            ],
            [
                -0.712126,
                50.855532
            ],
            [
                -0.721649,
                50.85464
            ],
            [
                -0.719974,
                50.854826
            ],
            [
                -0.718962,
                50.854932
            ],
            [
                -0.717495,
                50.85506
            ],
            [
                -0.716968,
                50.855099
            ],
            [
                -0.715986,
                50.855169
            ],
            [
                -0.714108,
                50.855275
            ],
            [
                -0.71401,
                50.855278
            ],
            [
                -0.712899,
                50.855315
            ],
            [
                -0.712628,
                50.855339
            ],
            [
                -0.712443,
                50.855364
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.712443,
            50.855364
        ],
        [
            -0.712414,
            50.8554
        ],
        [
            -0.712341,
            50.855462
        ],
        [
            -0.712341,
            50.855462
        ],
        [
            -0.712312,
            50.85548
        ],
        [
            -0.712269,
            50.855506
        ],
        [
            -0.712126,
            50.855532
        ],
        [
            -0.721649,
            50.85464
        ],
        [
            -0.719974,
            50.854826
        ],
        [
            -0.718962,
            50.854932
        ],
        [
            -0.717495,
            50.85506
        ],
        [
            -0.716968,
            50.855099
        ],
        [
            -0.715986,
            50.855169
        ],
        [
            -0.714108,
            50.855275
        ],
        [
            -0.71401,
            50.855278
        ],
        [
            -0.712899,
            50.855315
        ],
        [
            -0.712628,
            50.855339
        ],
        [
            -0.712443,
            50.855364
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Repair Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed region label
Bognor Regis
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Mon, Jan 19, 2026 1:03 PM
Record versioned
Thu, Jan 29, 2026 8:05 AM
Coordinate source
Geometry

Related incidents

A27 eastbound lane 2 closure

Cleared National Highways
Brighton And Hove A27 · A27 Eastbound Within The B2123 Junction
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Chichester A27 · A27 Eastbound Between A259 Near Emsworth And A259 Near Chichester (West)
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound lane 2 closure

Cleared National Highways
Brighton And Hove A27 · A27 Eastbound Within The B2123 Junction
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound Warblington between exit and entry slip road carriageway closure

Planned National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A27 eastbound Warblington between exit and entry slip road carriageway closure

Category: Construction Work
View update

A27 eastbound lane 2 closure

Planned National Highways
Bognor Regis A27 · A27 Eastbound Between A29 Near Bognor Regis (East) And A284 Near Arundel (West)
Starts 5 Jun 2026, 19:00 Expected 6 Jun 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update