A27 eastbound lane 1 closure including ring management (75.2 - 75.9)
ClearedA27 eastbound lane 1 closure including ring management (75.2 - 75.9)
- Start time
- Wed, May 27, 2026 7:00 PM
- Expected end
- Thu, May 28, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A27 – A27 Eastbound At A Minor Junction Between A285 Near Chichester (East) And A29 Near Bognor Regis (West)
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, May 20, 2026 3:15 PM
- Last updated
- Wed, May 27, 2026 9:55 AM
- Cleared
- Thu, May 28, 2026 5:00 AM
- Latest update: A27 eastbound lane 1 closure including ring management (75.2 - 75.9)
- Coordinates
- 50.855346, -0.712195
- Latitude span
- 50.854532 – 50.855596
- Longitude span
- -0.722604 – -0.703067
- Bounding box centre
- 50.855064, -0.712836
- Location descriptions
-
- A27 eastbound at a minor junction between A285 near Chichester (east) and A29 near Bognor Regis (west)
- A27 eastbound between A285 near Chichester (east) and A29 near Bognor Regis (west)
- A27 westbound at a minor junction between A29 near Bognor Regis (west) and A285 near Chichester (east)
- Feed validity status
- Planned
- Overall feed start
- Wed, May 27, 2026 7:00 PM
- Overall feed end
- Thu, May 28, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- A27 eastbound at a minor junction between A285 near Chichester (east) and A29 near Bognor Regis (west)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {72A7E940-39C8-45D7-AA2C-E9CCA00C0140}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 22 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.855462 -0.712341 50.85548 -0.712312 50.855506 -0.712269 50.855532 -0.712126 50.855531 -0.712055
Segment 2
12 coordinate pairs- Description
- A27 eastbound between A285 near Chichester (east) and A29 near Bognor Regis (west)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {B0D78104-7FC2-4F44-9701-6406C695D203}
- Linear Element Type
- A Carriageway
- From Distance
- 195 m
- To Distance
- 917 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.854532 -0.722604 50.854614 -0.721883 50.854826 -0.719974 50.854932 -0.718962 50.85506 -0.717495 50.855099 -0.716968 50.855169 -0.715986 50.855275 -0.714108 50.855278 -0.71401 50.855315 -0.712899 50.855339 -0.712628 50.855364 -0.712443
Segment 3
3 coordinate pairs- Description
- A27 eastbound at a minor junction between A285 near Chichester (east) and A29 near Bognor Regis (west)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {0CABC1F1-E61F-453F-94C6-369FDBEA2030}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 15 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.855531 -0.712055 50.85553 -0.711998 50.855492 -0.711843
Segment 4
3 coordinate pairs- Description
- A27 westbound at a minor junction between A29 near Bognor Regis (west) and A285 near Chichester (east)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {7D53660F-2370-402A-973D-143D5E1C364C}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 13 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.855364 -0.712443 50.8554 -0.712414 50.855462 -0.712341
Segment 5
11 coordinate pairs- Description
- A27 eastbound between A285 near Chichester (east) and A29 near Bognor Regis (west)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {23BE7DB9-2B82-42C2-8564-15168159766C}
- Linear Element Type
- A Carriageway
- From Distance
- 2 m
- To Distance
- 615 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.855461 -0.711756 50.855406 -0.71132 50.855399 -0.710751 50.855477 -0.708831 50.855492 -0.708518 50.855544 -0.706741 50.855567 -0.705589 50.855573 -0.705348 50.855575 -0.705248 50.855596 -0.703301 50.855596 -0.703067
- Geometry type
- MultiLineString
- Geometry points
- 34
- First coordinate pair
- -0.712341, 50.855462
- Road section segments
- 1
- Road section points
- 34
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.712341,
50.855462
],
[
-0.712312,
50.85548
],
[
-0.712269,
50.855506
],
[
-0.712126,
50.855532
],
[
-0.712055,
50.855531
],
[
-0.722604,
50.854532
],
[
-0.721883,
50.854614
],
[
-0.719974,
50.854826
],
[
-0.718962,
50.854932
],
[
-0.717495,
50.85506
],
[
-0.716968,
50.855099
],
[
-0.715986,
50.855169
],
[
-0.714108,
50.855275
],
[
-0.71401,
50.855278
],
[
-0.712899,
50.855315
],
[
-0.712628,
50.855339
],
[
-0.712443,
50.855364
],
[
-0.712055,
50.855531
],
[
-0.711998,
50.85553
],
[
-0.711843,
50.855492
],
[
-0.712443,
50.855364
],
[
-0.712414,
50.8554
],
[
-0.712341,
50.855462
],
[
-0.711756,
50.855461
],
[
-0.71132,
50.855406
],
[
-0.710751,
50.855399
],
[
-0.708831,
50.855477
],
[
-0.708518,
50.855492
],
[
-0.706741,
50.855544
],
[
-0.705589,
50.855567
],
[
-0.705348,
50.855573
],
[
-0.705248,
50.855575
],
[
-0.703301,
50.855596
],
[
-0.703067,
50.855596
]
]
]
}
View road section coordinates
[
[
[
-0.712341,
50.855462
],
[
-0.712312,
50.85548
],
[
-0.712269,
50.855506
],
[
-0.712126,
50.855532
],
[
-0.712055,
50.855531
],
[
-0.722604,
50.854532
],
[
-0.721883,
50.854614
],
[
-0.719974,
50.854826
],
[
-0.718962,
50.854932
],
[
-0.717495,
50.85506
],
[
-0.716968,
50.855099
],
[
-0.715986,
50.855169
],
[
-0.714108,
50.855275
],
[
-0.71401,
50.855278
],
[
-0.712899,
50.855315
],
[
-0.712628,
50.855339
],
[
-0.712443,
50.855364
],
[
-0.712055,
50.855531
],
[
-0.711998,
50.85553
],
[
-0.711843,
50.855492
],
[
-0.712443,
50.855364
],
[
-0.712414,
50.8554
],
[
-0.712341,
50.855462
],
[
-0.711756,
50.855461
],
[
-0.71132,
50.855406
],
[
-0.710751,
50.855399
],
[
-0.708831,
50.855477
],
[
-0.708518,
50.855492
],
[
-0.706741,
50.855544
],
[
-0.705589,
50.855567
],
[
-0.705348,
50.855573
],
[
-0.705248,
50.855575
],
[
-0.703301,
50.855596
],
[
-0.703067,
50.855596
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Chichester
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, May 20, 2026 3:15 PM
- Record versioned
- Wed, May 27, 2026 9:55 AM
- Coordinate source
- Geometry
Driving on the A27? See every live closure, roadwork and planned restriction on this road.
A27 live closuresRelated incidents
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
Active Roadworks National HighwaysExpected to clear in 4 days 13 hours
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
A27 eastbound Falmer exit slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 38 minutes
A27 eastbound Falmer exit slip road closure
A27 eastbound Falmer exit slip road closure
Cleared Roadworks National HighwaysCleared 5 hours 21 minutes ago
A27 eastbound Falmer exit slip road closure
A27 both directions Clapham to Grove Lodge carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 1 hour ago
A27 both directions Clapham to Grove Lodge carriageway closure
A27 eastbound Crossbush to Clapham Interchange carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 21 minutes ago
A27 eastbound Crossbush to Clapham Interchange carriageway closure
A27 westbound Hangleton exit slip road closure
Cleared Roadworks National HighwaysCleared 1 day 1 hour ago
A27 westbound Hangleton exit slip road closure