A27 eastbound lane 1 closure (Crossbush ring management)
PlannedA27 eastbound lane 1 closure (Crossbush ring management)
- Start time
- Tue, Oct 14, 2025 7:00 PM
- Expected end
- Wed, Oct 15, 2025 5:00 AM
- Duration
- 10 hours
- Road
- A27 – A27 Eastbound Between A284 And A284 (Arundel)
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Singlecarriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Oct 14, 2025 3:08 AM
- Last updated
- Tue, Oct 14, 2025 1:45 PM
- Cleared
- Wed, Oct 15, 2025 5:00 AM
- Latest update: A27 eastbound lane 1 closure (Crossbush ring management)
- Coordinates
- 50.844031, -0.540357
- Latitude span
- 50.843856 – 50.844106
- Longitude span
- -0.540502 – -0.539970
- Bounding box centre
- 50.843981, -0.540236
- Location descriptions
-
- A27 eastbound between A284 and A284 (Arundel)
- A27 eastbound between A284 near Arundel (east) and A280
- Feed validity status
- Planned
- Overall feed start
- Tue, Oct 14, 2025 7:00 PM
- Overall feed end
- Wed, Oct 15, 2025 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A27 eastbound between A284 and A284 (Arundel)
- Carriageway
- Single Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {2B1A7C1E-2E8C-4581-8EC2-8B29A41D7274}
- Linear Element Type
- Other
- From Distance
- 40 m
- To Distance
- 43 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.844106 -0.540502 50.844086 -0.54047
Segment 2
3 coordinate pairs- Description
- A27 eastbound between A284 near Arundel (east) and A280
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {588BBFE7-2C03-45F1-899B-21DF080A62C1}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 43 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.844086 -0.54047 50.844022 -0.540372 50.843856 -0.53997
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -0.540502, 50.844106
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.540502,
50.844106
],
[
-0.54047,
50.844086
],
[
-0.54047,
50.844086
],
[
-0.540372,
50.844022
],
[
-0.53997,
50.843856
]
]
]
}
View road section coordinates
[
[
[
-0.540502,
50.844106
],
[
-0.54047,
50.844086
],
[
-0.54047,
50.844086
],
[
-0.540372,
50.844022
],
[
-0.53997,
50.843856
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Arundel
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Tue, Oct 14, 2025 3:08 AM
- Record versioned
- Tue, Oct 14, 2025 1:45 PM
- Coordinate source
- Geometry
Related incidents
A27 eastbound lane 2 closure
Cleared National HighwaysA27 eastbound lane 2 closure
A27 eastbound Warblington between exit and entry slip road carriageway closure
Planned National HighwaysA27 eastbound Warblington between exit and entry slip road carriageway closure
A27 eastbound Warblington between exit and entry slip road carriageway closure
Planned National HighwaysA27 eastbound Warblington between exit and entry slip road carriageway closure
A27 eastbound lane 2 closure
Planned National HighwaysA27 eastbound lane 2 closure
A27 eastbound lane 2 closure
Cleared National HighwaysA27 eastbound lane 2 closure
A27 eastbound lane 2 closure
Cleared National HighwaysA27 eastbound lane 2 closure