A27 eastbound lane 1 and 2 closure (49/3 to 50/3)
ClearedA27 eastbound lane 1 and 2 closure (49/3 to 50/3)
- Start time
- Fri, Jan 16, 2026 10:00 PM
- Expected end
- Sat, Jan 17, 2026 6:00 AM
- Duration
- 8 hours
- Road
- A27 – A27 Eastbound Between A2030 And A3(M)
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 3 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jan 12, 2026 2:00 PM
- Last updated
- Fri, Jan 16, 2026 3:36 PM
- Cleared
- Sat, Jan 17, 2026 6:00 AM
- Latest update: A27 eastbound lane 1 and 2 closure (49/3 to 50/3)
- Coordinates
- 50.841464, -1.024943
- Latitude span
- 50.837792 – 50.843392
- Longitude span
- -1.031906 – -1.020949
- Bounding box centre
- 50.840592, -1.026428
- Location descriptions
-
- A27 eastbound between A2030 and A3(M)
- Feed validity status
- Planned
- Overall feed start
- Fri, Jan 16, 2026 10:00 PM
- Overall feed end
- Sat, Jan 17, 2026 6:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- A27 eastbound between A2030 and A3(M)
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {16DC0A10-9035-4091-BB29-009650C7A20F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 129 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.842763 -1.022497 50.842928 -1.022127 50.843198 -1.021475 50.843219 -1.021425 50.843254 -1.021339 50.843359 -1.021038 50.843392 -1.020949
Segment 2
14 coordinate pairs- Description
- A27 eastbound between A2030 and A3(M)
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {4ECC6F75-6AA0-4284-8959-934F128F571B}
- Linear Element Type
- A Carriageway
- From Distance
- 440 m
- To Distance
- 1,303 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.837792 -1.031906 50.837829 -1.031834 50.838697 -1.030226 50.839618 -1.028516 50.840185 -1.027468 50.840379 -1.027109 50.840459 -1.026979 50.841027 -1.025922 50.841125 -1.02574 50.841717 -1.024638 50.842062 -1.023963 50.842239 -1.023604 50.842742 -1.022543 50.842763 -1.022497
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -1.022497, 50.842763
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.022497,
50.842763
],
[
-1.022127,
50.842928
],
[
-1.021475,
50.843198
],
[
-1.021425,
50.843219
],
[
-1.021339,
50.843254
],
[
-1.021038,
50.843359
],
[
-1.020949,
50.843392
],
[
-1.031906,
50.837792
],
[
-1.031834,
50.837829
],
[
-1.030226,
50.838697
],
[
-1.028516,
50.839618
],
[
-1.027468,
50.840185
],
[
-1.027109,
50.840379
],
[
-1.026979,
50.840459
],
[
-1.025922,
50.841027
],
[
-1.02574,
50.841125
],
[
-1.024638,
50.841717
],
[
-1.023963,
50.842062
],
[
-1.023604,
50.842239
],
[
-1.022543,
50.842742
],
[
-1.022497,
50.842763
]
]
]
}
View road section coordinates
[
[
[
-1.022497,
50.842763
],
[
-1.022127,
50.842928
],
[
-1.021475,
50.843198
],
[
-1.021425,
50.843219
],
[
-1.021339,
50.843254
],
[
-1.021038,
50.843359
],
[
-1.020949,
50.843392
],
[
-1.031906,
50.837792
],
[
-1.031834,
50.837829
],
[
-1.030226,
50.838697
],
[
-1.028516,
50.839618
],
[
-1.027468,
50.840185
],
[
-1.027109,
50.840379
],
[
-1.026979,
50.840459
],
[
-1.025922,
50.841027
],
[
-1.02574,
50.841125
],
[
-1.024638,
50.841717
],
[
-1.023963,
50.842062
],
[
-1.023604,
50.842239
],
[
-1.022543,
50.842742
],
[
-1.022497,
50.842763
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jan 12, 2026 2:00 PM
- Record versioned
- Fri, Jan 16, 2026 3:36 PM
- Coordinate source
- Geometry
Driving on the A27? See every live closure, roadwork and planned restriction on this road.
A27 live closuresRelated incidents
A27 eastbound Falmer exit slip road closure
Planned Roadworks National HighwaysExpected to clear in 7 hours 18 minutes
A27 eastbound Falmer exit slip road closure
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
Active Roadworks National HighwaysExpected to clear in 3 days 21 hours
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
A27 eastbound Falmer exit slip road closure
Cleared Roadworks National HighwaysCleared 21 hours 41 minutes ago
A27 eastbound Falmer exit slip road closure
A27 both directions Clapham to Grove Lodge carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 17 hours ago
A27 both directions Clapham to Grove Lodge carriageway closure
A27 eastbound Crossbush to Clapham Interchange carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 16 hours ago
A27 eastbound Crossbush to Clapham Interchange carriageway closure
M275 Northbound Tipner to M27 Carriageway Closure
Cleared Roadworks National HighwaysExpected to clear in 6 hours 18 minutes
M275 Northbound Tipner to M27 Carriageway Closure