A27 eastbound Falmer exit slip road closure
PlannedA27 eastbound Falmer exit slip road closure
- Start time
- Sat, Jun 13, 2026 7:00 PM
- Expected end
- Sun, Jun 14, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A27 – A27 Eastbound Exit For B2123
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Apr 30, 2026 4:13 PM
- Last updated
- Sat, Jun 13, 2026 8:20 PM
- Cleared
- Sun, Jun 14, 2026 5:00 AM
- Latest update: A27 eastbound Falmer exit slip road closure
- Coordinates
- 50.863577, -0.082408
- Latitude span
- 50.863149 – 50.863938
- Longitude span
- -0.084757 – -0.080803
- Bounding box centre
- 50.863544, -0.082780
- Location descriptions
-
- A27 eastbound exit for B2123
- Feed validity status
- Planned
- Overall feed start
- Sat, Jun 13, 2026 7:00 PM
- Overall feed end
- Sun, Jun 14, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A27 eastbound exit for B2123
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {D764BCDA-6022-4A29-849A-756A16923615}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 28 m
- To Distance
- 132 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.863149 -0.084757 50.863403 -0.083329
Segment 2
7 coordinate pairs- Description
- A27 eastbound exit for B2123
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {3FFDBBF3-CD7D-4FDD-AC07-CC0640F80A76}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 188 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.863403 -0.083329 50.863454 -0.083037 50.863584 -0.082174 50.863667 -0.081716 50.863762 -0.081377 50.863831 -0.081147 50.863938 -0.080803
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -0.084757, 50.863149
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.084757,
50.863149
],
[
-0.083329,
50.863403
],
[
-0.083329,
50.863403
],
[
-0.083037,
50.863454
],
[
-0.082174,
50.863584
],
[
-0.081716,
50.863667
],
[
-0.081377,
50.863762
],
[
-0.081147,
50.863831
],
[
-0.080803,
50.863938
]
]
]
}
View road section coordinates
[
[
[
-0.084757,
50.863149
],
[
-0.083329,
50.863403
],
[
-0.083329,
50.863403
],
[
-0.083037,
50.863454
],
[
-0.082174,
50.863584
],
[
-0.081716,
50.863667
],
[
-0.081377,
50.863762
],
[
-0.081147,
50.863831
],
[
-0.080803,
50.863938
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Apr 30, 2026 4:13 PM
- Record versioned
- Sat, Jun 13, 2026 8:20 PM
- Coordinate source
- Geometry
Driving on the A27? See every live closure, roadwork and planned restriction on this road.
A27 live closuresRelated incidents
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
Active Roadworks National HighwaysExpected to clear in 4 days 22 hours
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
A27 both directions Clapham to Grove Lodge carriageway closure
Cleared Roadworks National HighwaysCleared 16 hours 28 minutes ago
A27 both directions Clapham to Grove Lodge carriageway closure
A27 eastbound Crossbush to Clapham Interchange carriageway closure
Cleared Roadworks National HighwaysCleared 15 hours 28 minutes ago
A27 eastbound Crossbush to Clapham Interchange carriageway closure
A27 westbound Hangleton exit slip road closure
Cleared Roadworks National HighwaysCleared 16 hours 28 minutes ago
A27 westbound Hangleton exit slip road closure
A27 eastbound Warblington between exit and entry slip road carriageway closure
Cleared Roadworks National HighwaysCleared 15 hours 28 minutes ago
A27 eastbound Warblington between exit and entry slip road carriageway closure
A27 eastbound lane 2 closure
Cleared Roadworks National HighwaysCleared 1 day 1 hour ago
A27 eastbound lane 2 closure