A27 eastbound Eastern Road Lane 1 closure on exit slip road
ClearedA27 eastbound Eastern Road Lane 1 closure on exit slip road
- Start time
- Sun, Sep 28, 2025 8:00 PM
- Expected end
- Mon, Sep 29, 2025 4:00 AM
- Duration
- 8 hours
- Road
- A27 – A27 Eastbound Exit For A2030
- Category
- Authority Operation
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected, 1 of 3 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Aug 4, 2025 8:12 AM
- Last updated
- Sun, Sep 28, 2025 11:39 PM
- Cleared
- Mon, Sep 29, 2025 4:00 AM
- Latest update: A27 eastbound Eastern Road Lane 1 closure on exit slip road
- Coordinates
- 50.834277, -1.049571
- Latitude span
- 50.834106 – 50.834836
- Longitude span
- -1.052628 – -1.044356
- Bounding box centre
- 50.834471, -1.048492
- Location descriptions
-
- A27 eastbound exit for A2030
- A27 eastbound between M27/M275 and A2030
- Feed validity status
- Planned
- Overall feed start
- Sun, Sep 28, 2025 8:00 PM
- Overall feed end
- Mon, Sep 29, 2025 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- A27 eastbound exit for A2030
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {EE7A42CC-E656-47D2-9DB9-796E1C4999D0}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 520 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.834107 -1.051619 50.834106 -1.050518 50.834114 -1.049886 50.83415 -1.049264 50.834192 -1.048908 50.834299 -1.047953 50.834534 -1.046357 50.834778 -1.044791 50.834836 -1.044356
Segment 2
5 coordinate pairs- Description
- A27 eastbound between M27/M275 and A2030
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {4FA9E108-3DDB-41EA-919A-C534FA37582A}
- Linear Element Type
- A Carriageway
- From Distance
- 805 m
- To Distance
- 877 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.834208 -1.052628 50.834204 -1.0526 50.834126 -1.051807 50.834116 -1.051693 50.834107 -1.051619
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -1.051619, 50.834107
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.051619,
50.834107
],
[
-1.050518,
50.834106
],
[
-1.049886,
50.834114
],
[
-1.049264,
50.83415
],
[
-1.048908,
50.834192
],
[
-1.047953,
50.834299
],
[
-1.046357,
50.834534
],
[
-1.044791,
50.834778
],
[
-1.044356,
50.834836
],
[
-1.052628,
50.834208
],
[
-1.0526,
50.834204
],
[
-1.051807,
50.834126
],
[
-1.051693,
50.834116
],
[
-1.051619,
50.834107
]
]
]
}
View road section coordinates
[
[
[
-1.051619,
50.834107
],
[
-1.050518,
50.834106
],
[
-1.049886,
50.834114
],
[
-1.049264,
50.83415
],
[
-1.048908,
50.834192
],
[
-1.047953,
50.834299
],
[
-1.046357,
50.834534
],
[
-1.044791,
50.834778
],
[
-1.044356,
50.834836
],
[
-1.052628,
50.834208
],
[
-1.0526,
50.834204
],
[
-1.051807,
50.834126
],
[
-1.051693,
50.834116
],
[
-1.051619,
50.834107
]
]
]
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Aug 4, 2025 8:12 AM
- Record versioned
- Sun, Sep 28, 2025 11:39 PM
- Coordinate source
- Geometry
Driving on the A27? See every live closure, roadwork and planned restriction on this road.
A27 live closuresRelated incidents
A27 eastbound Falmer exit slip road closure
Planned Roadworks National HighwaysExpected to clear in 7 hours 5 minutes
A27 eastbound Falmer exit slip road closure
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
Active Roadworks National HighwaysExpected to clear in 4 days 21 hours
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
A27 both directions Clapham to Grove Lodge carriageway closure
Cleared Roadworks National HighwaysCleared 17 hours 54 minutes ago
A27 both directions Clapham to Grove Lodge carriageway closure
A27 eastbound Crossbush to Clapham Interchange carriageway closure
Cleared Roadworks National HighwaysCleared 16 hours 54 minutes ago
A27 eastbound Crossbush to Clapham Interchange carriageway closure
M275 Northbound Tipner to M27 Carriageway Closure
Cleared Roadworks National HighwaysExpected to clear in 1 day 6 hours
M275 Northbound Tipner to M27 Carriageway Closure
A27 westbound Hangleton exit slip road closure
Cleared Roadworks National HighwaysCleared 17 hours 54 minutes ago
A27 westbound Hangleton exit slip road closure