A27 eastbound A23 exit to Patcham carriageway closure
ClearedA27 eastbound A23 exit to Patcham carriageway closure
- Start time
- Wed, Apr 29, 2026 7:00 PM
- Expected end
- Thu, Apr 30, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A27 – A27 Eastbound Between A2038 And A23
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Road Marking Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Mar 26, 2026 1:55 PM
- Last updated
- Wed, Apr 29, 2026 3:59 AM
- Cleared
- Thu, Apr 30, 2026 5:00 AM
- Latest update: A27 eastbound A23 exit to Patcham carriageway closure
- Coordinates
- 50.866680, -0.161138
- Latitude span
- 50.864958 – 50.867882
- Longitude span
- -0.164796 – -0.158345
- Bounding box centre
- 50.866420, -0.161571
- Location descriptions
-
- A27 eastbound between A2038 and A23
- A27 eastbound within the A23 junction before A23 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Wed, Apr 29, 2026 7:00 PM
- Overall feed end
- Thu, Apr 30, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A27 eastbound between A2038 and A23
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {2EF4CAD7-D8F0-495F-A854-1A502C89D1E9}
- Linear Element Type
- A Carriageway
- From Distance
- 801 m
- To Distance
- 1,075 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.864958 -0.164796 50.865078 -0.164545 50.866028 -0.162589 50.866473 -0.161719
Segment 2
3 coordinate pairs- Description
- A27 eastbound within the A23 junction before A23 southbound exit
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {9E5C555B-A069-4052-AE97-C1CDFB029C5D}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 118 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.867308 -0.159756 50.867375 -0.159595 50.867882 -0.158345
Segment 3
6 coordinate pairs- Description
- A27 eastbound within the A23 junction before A23 southbound exit
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {D0240813-915B-408F-BBD7-9B022CC7C279}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 166 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.866473 -0.161719 50.866722 -0.161103 50.866724 -0.161098 50.867219 -0.159984 50.867297 -0.159782 50.867308 -0.159756
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -0.164796, 50.864958
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.164796,
50.864958
],
[
-0.164545,
50.865078
],
[
-0.162589,
50.866028
],
[
-0.161719,
50.866473
],
[
-0.159756,
50.867308
],
[
-0.159595,
50.867375
],
[
-0.158345,
50.867882
],
[
-0.161719,
50.866473
],
[
-0.161103,
50.866722
],
[
-0.161098,
50.866724
],
[
-0.159984,
50.867219
],
[
-0.159782,
50.867297
],
[
-0.159756,
50.867308
]
]
]
}
View road section coordinates
[
[
[
-0.164796,
50.864958
],
[
-0.164545,
50.865078
],
[
-0.162589,
50.866028
],
[
-0.161719,
50.866473
],
[
-0.159756,
50.867308
],
[
-0.159595,
50.867375
],
[
-0.158345,
50.867882
],
[
-0.161719,
50.866473
],
[
-0.161103,
50.866722
],
[
-0.161098,
50.866724
],
[
-0.159984,
50.867219
],
[
-0.159782,
50.867297
],
[
-0.159756,
50.867308
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Road Marking Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Thu, Mar 26, 2026 1:55 PM
- Record versioned
- Wed, Apr 29, 2026 3:59 AM
- Coordinate source
- Geometry
Driving on the A27? See every live closure, roadwork and planned restriction on this road.
A27 live closuresRelated incidents
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
Active Roadworks National HighwaysExpected to clear in 4 days 10 hours
A27 eastbound Lane 2 closure from (54/4 to 56/9) switching to Lane 1 closure (56/9 to 57/6.)
A27 eastbound Falmer exit slip road closure
Planned Roadworks National HighwaysStarts in 10 hours 3 minutes
A27 eastbound Falmer exit slip road closure
A27 eastbound Falmer exit slip road closure
Cleared Roadworks National HighwaysCleared 8 hours 56 minutes ago
A27 eastbound Falmer exit slip road closure
A27 both directions Clapham to Grove Lodge carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 4 hours ago
A27 both directions Clapham to Grove Lodge carriageway closure
A27 eastbound Crossbush to Clapham Interchange carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 3 hours ago
A27 eastbound Crossbush to Clapham Interchange carriageway closure
A27 westbound Hangleton exit slip road closure
Cleared Roadworks National HighwaysCleared 1 day 4 hours ago
A27 westbound Hangleton exit slip road closure