A21 northbound lane 2 closure (52/2 to 48/6)
ClearedA21 northbound lane 2 closure (52/2 to 48/6)
- Start time
- Fri, Mar 27, 2026 8:00 PM
- Expected end
- Sat, Mar 28, 2026 5:00 AM
- Duration
- 9 hours
- Road
- A21 – A21 Southbound Between B2160 And A262
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Singlecarriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Mar 17, 2026 4:23 PM
- Last updated
- Fri, Mar 27, 2026 7:59 PM
- Cleared
- Sat, Mar 28, 2026 5:00 AM
- Latest update: A21 northbound lane 2 closure (52/2 to 48/6)
- Coordinates
- 51.135422, 0.350342
- Latitude span
- 51.135225 – 51.135583
- Longitude span
- 0.349961 – 0.350854
- Bounding box centre
- 51.135404, 0.350408
- Location descriptions
-
- A21 southbound between B2160 and A262
- Feed validity status
- Planned
- Overall feed start
- Fri, Mar 27, 2026 8:00 PM
- Overall feed end
- Sat, Mar 28, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A21 southbound between B2160 and A262
- Carriageway
- Single Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A21
- Linear Element Model
- The Network Model
- Linear Element Id
- {5B559AE2-1F25-4BFC-8A89-3EAFF3995689}
- Linear Element Type
- A Carriageway
- From Distance
- 7 m
- To Distance
- 35 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.135583 0.349961 51.135439 0.350277
Segment 2
2 coordinate pairs- Description
- A21 southbound between B2160 and A262
- Carriageway
- Single Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Both
- Height Grade
- Start1 End1
- Linear Element Road
- A21
- Linear Element Model
- The Network Model
- Linear Element Id
- {B757CD31-A063-45A3-B149-4177F0F71231}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 46 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.135439 0.350277 51.135225 0.350854
- Geometry type
- MultiLineString
- Geometry points
- 4
- First coordinate pair
- 0.349961, 51.135583
- Road section segments
- 1
- Road section points
- 4
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.349961,
51.135583
],
[
0.350277,
51.135439
],
[
0.350277,
51.135439
],
[
0.350854,
51.135225
]
]
]
}
View road section coordinates
[
[
[
0.349961,
51.135583
],
[
0.350277,
51.135439
],
[
0.350277,
51.135439
],
[
0.350854,
51.135225
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Mar 17, 2026 4:23 PM
- Record versioned
- Fri, Mar 27, 2026 7:59 PM
- Coordinate source
- Geometry
Driving on the A21? See every live closure, roadwork and planned restriction on this road.
A21 live closuresRelated incidents
A21 northbound lane 2 closure (Morleys exit slip road)
Cleared Roadworks National HighwaysCleared 2 days 3 hours ago
A21 northbound lane 2 closure (Morleys exit slip road)
A21 northbound lane 2 closure (Morleys exit slip road)
Cleared Roadworks National HighwaysCleared 1 day 23 hours ago
A21 northbound lane 2 closure (Morleys exit slip road)
A21 southbound Morleys roundabout to Vauxhall roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 3 days 3 hours ago
A21 southbound Morleys roundabout to Vauxhall roundabout carriageway closure
A21 southbound Morleys roundabout to Vauxhall roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 2 days 22 hours ago
A21 southbound Morleys roundabout to Vauxhall roundabout carriageway closure
A21 southbound Morleys roundabout to Vauxhall roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 3 days 18 hours ago
A21 southbound Morleys roundabout to Vauxhall roundabout carriageway closure
A21 southbound Morleys roundabout to Vauxhall roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 3 days 19 hours ago
A21 southbound Morleys roundabout to Vauxhall roundabout carriageway closure