A2 southbound lane 1 closure
PlannedA2 southbound lane 1 closure
- Start time
- Tue, Oct 20, 2026 7:00 PM
- Expected end
- Wed, Oct 21, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A2 – A2 Eastbound Between A2050 Near Canterbury (South) And A260
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 19, 2026 11:18 PM
- Last updated
- Tue, Oct 20, 2026 12:23 AM
- Cleared
- Wed, Oct 21, 2026 5:00 AM
- Latest update: A2 southbound lane 1 closure
- Coordinates
- 51.247693, 1.132046
- Latitude span
- 51.247478 – 51.247885
- Longitude span
- 1.131852 – 1.132252
- Bounding box centre
- 51.247682, 1.132052
- Location descriptions
-
- A2 eastbound between A2050 near Canterbury (south) and A260
- Feed validity status
- Planned
- Overall feed start
- Tue, Oct 20, 2026 7:00 PM
- Overall feed end
- Wed, Oct 21, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A2 eastbound between A2050 near Canterbury (south) and A260
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A2
- Linear Element Model
- The Network Model
- Linear Element Id
- {C7AD0221-3080-485E-87C1-2D6B6B63B1FA}
- Linear Element Type
- A Carriageway
- From Distance
- 854 m
- To Distance
- 873 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.247885 1.131852 51.247746 1.131998
Segment 2
3 coordinate pairs- Description
- A2 eastbound between A2050 near Canterbury (south) and A260
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A2
- Linear Element Model
- The Network Model
- Linear Element Id
- {9B519223-23F4-495C-8204-D8FB6A085623}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 34 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.247746 1.131998 51.247609 1.13213 51.247478 1.132252
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- 1.131852, 51.247885
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
1.131852,
51.247885
],
[
1.131998,
51.247746
],
[
1.131998,
51.247746
],
[
1.13213,
51.247609
],
[
1.132252,
51.247478
]
]
]
}
View road section coordinates
[
[
[
1.131852,
51.247885
],
[
1.131998,
51.247746
],
[
1.131998,
51.247746
],
[
1.13213,
51.247609
],
[
1.132252,
51.247478
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Canterbury
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 19, 2026 11:18 PM
- Record versioned
- Tue, Oct 20, 2026 12:23 AM
- Coordinate source
- Geometry
Driving on the A2? See every live closure, roadwork and planned restriction on this road.
A2 live closuresRelated incidents
A2 eastbound Cobham exit slip road closure
Active Roadworks National HighwaysExpected to clear in 3 hours 39 minutes
A2 eastbound Cobham exit slip road closure
A2 eastbound hard shoulder closure (40/7A to 41/8A)
Planned Roadworks National HighwaysExpected to clear in 1 month 4 weeks
A2 eastbound hard shoulder closure (40/7A to 41/8A)
A2 eastbound Taper (116.5 - 116.8)
Cleared Roadworks National HighwaysCleared 5 hours 20 minutes ago
A2 eastbound Taper (116.5 - 116.8)
A2 southbound lane 2 closure
Cleared Roadworks National HighwaysCleared 6 hours 20 minutes ago
A2 southbound lane 2 closure
A2 eastbound Cobham exit slip road closure
Cleared Roadworks National HighwaysCleared 6 hours 20 minutes ago
A2 eastbound Cobham exit slip road closure
A2 southbound lane 2 closure
Cleared Roadworks National HighwaysCleared 1 hour 30 minutes ago
A2 southbound lane 2 closure