A2 eastbound Wincheap Entry Slip road closure
ClearedA2 eastbound Wincheap Entry Slip road closure
- Start time
- Thu, Sep 17, 2026 6:34 PM
- Expected end
- Fri, Sep 18, 2026 5:00 AM
- Duration
- 6 hours 56 minutes 1 second
- Road
- A2 – A2 Eastbound Access From A28
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Sep 17, 2026 6:34 PM
- Last updated
- Fri, Sep 18, 2026 12:24 AM
- Cleared
- Fri, Sep 18, 2026 1:30 AM
- Latest update: A2 eastbound Wincheap Entry Slip road closure
- Coordinates
- 51.268834, 1.063633
- Latitude span
- 51.267420 – 51.269695
- Longitude span
- 1.062507 – 1.065566
- Bounding box centre
- 51.268558, 1.064037
- Location descriptions
-
- A2 eastbound access from A28
- Feed validity status
- Active
- Overall feed start
- Thu, Sep 17, 2026 6:34 PM
- Overall feed end
- Fri, Sep 18, 2026 5:00 AM
- Feed window length
- 10 hours 26 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A2 eastbound access from A28
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A2
- Linear Element Model
- The Network Model
- Linear Element Id
- {4AEF7634-BE73-4008-97E7-04A195AE5F74}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 312 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.269556 1.062664 51.268466 1.064097 51.268308 1.064302 51.26742 1.065566
Segment 2
2 coordinate pairs- Description
- A2 eastbound access from A28
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A2
- Linear Element Model
- The Network Model
- Linear Element Id
- {6E98BED0-3E15-4C45-B3BE-68E9612B2E8A}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 8 m
- To Distance
- 27 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.269695 1.062507 51.269556 1.062664
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- 1.062664, 51.269556
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
1.062664,
51.269556
],
[
1.064097,
51.268466
],
[
1.064302,
51.268308
],
[
1.065566,
51.26742
],
[
1.062507,
51.269695
],
[
1.062664,
51.269556
]
]
]
}
View road section coordinates
[
[
[
1.062664,
51.269556
],
[
1.064097,
51.268466
],
[
1.064302,
51.268308
],
[
1.065566,
51.26742
],
[
1.062507,
51.269695
],
[
1.062664,
51.269556
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Sep 17, 2026 6:34 PM
- Record versioned
- Fri, Sep 18, 2026 12:24 AM
- Coordinate source
- Geometry
Driving on the A2? See every live closure, roadwork and planned restriction on this road.
A2 live closuresRelated incidents
A2 eastbound lane 2 closure (117/2a to 118/8a)
Planned Roadworks National HighwaysStarts in 4 hours 27 minutes
A2 eastbound lane 2 closure (117/2a to 118/8a)
A2 eastbound Cobham exit slip road closure
Planned Roadworks National HighwaysStarts in 4 hours 27 minutes
A2 eastbound Cobham exit slip road closure
A2 eastbound lane 1 closure (40/6A to 42/1)
Planned Roadworks National HighwaysStarts in 4 hours 27 minutes
A2 eastbound lane 1 closure (40/6A to 42/1)
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
Cleared Roadworks National HighwaysCleared 9 hours 32 minutes ago
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
Cleared Roadworks National HighwaysCleared 52 minutes 20 seconds ago
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
A2 southbound Barham to Coldred carriageway closure
Cleared Roadworks National HighwaysCleared 9 hours 32 minutes ago
A2 southbound Barham to Coldred carriageway closure