A2 eastbound Pepperhill entry slip road closure
ClearedA2 eastbound Pepperhill entry slip road closure
- Start time
- Wed, Sep 23, 2026 7:00 PM
- Expected end
- Thu, Sep 24, 2026 5:00 AM
- Duration
- 50 minutes 1 second
- Road
- A2 – A2 Eastbound Access From B262
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Litter Clearance
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Sep 16, 2026 2:51 PM
- Last updated
- Wed, Sep 23, 2026 7:18 PM
- Cleared
- Wed, Sep 23, 2026 7:50 PM
- Latest update: A2 eastbound Pepperhill entry slip road closure
- Coordinates
- 51.426221, 0.332135
- Latitude span
- 51.424982 – 51.426783
- Longitude span
- 0.331540 – 0.334179
- Bounding box centre
- 51.425883, 0.332860
- Location descriptions
-
- A2 eastbound access from B262
- Feed validity status
- Planned
- Overall feed start
- Wed, Sep 23, 2026 7:00 PM
- Overall feed end
- Thu, Sep 24, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- A2 eastbound access from B262
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A2
- Linear Element Model
- The Network Model
- Linear Element Id
- {C66C6ED4-2A67-43FC-B0F9-7682FCC265AE}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 248 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.42652 0.331604 51.426465 0.33166 51.426405 0.33174 51.426092 0.332222 51.425794 0.33271 51.42559 0.333108 51.424982 0.334179
Segment 2
4 coordinate pairs- Description
- A2 eastbound access from B262
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A2
- Linear Element Model
- The Network Model
- Linear Element Id
- {5D6CAED4-BAE9-4A8B-83A8-34BCBE31A5A7}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 36 m
- To Distance
- 65 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.426783 0.33154 51.42669 0.331547 51.426589 0.331565 51.42652 0.331604
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- 0.331604, 51.426520
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.331604,
51.42652
],
[
0.33166,
51.426465
],
[
0.33174,
51.426405
],
[
0.332222,
51.426092
],
[
0.33271,
51.425794
],
[
0.333108,
51.42559
],
[
0.334179,
51.424982
],
[
0.33154,
51.426783
],
[
0.331547,
51.42669
],
[
0.331565,
51.426589
],
[
0.331604,
51.42652
]
]
]
}
View road section coordinates
[
[
[
0.331604,
51.42652
],
[
0.33166,
51.426465
],
[
0.33174,
51.426405
],
[
0.332222,
51.426092
],
[
0.33271,
51.425794
],
[
0.333108,
51.42559
],
[
0.334179,
51.424982
],
[
0.33154,
51.426783
],
[
0.331547,
51.42669
],
[
0.331565,
51.426589
],
[
0.331604,
51.42652
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Litter Clearance
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Sep 16, 2026 2:51 PM
- Record versioned
- Wed, Sep 23, 2026 7:18 PM
- Coordinate source
- Geometry
Driving on the A2? See every live closure, roadwork and planned restriction on this road.
A2 live closuresRelated incidents
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
Active Roadworks National HighwaysExpected to clear in 3 weeks 3 days
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
A282 Northbound Dartford Crossing West Tunnel closure
Planned Roadworks National HighwaysStarts in 2 hours 1 minute
A282 Northbound Dartford Crossing West Tunnel closure
A2 eastbound lane 2 closure (117/2a to 118/8a)
Planned Roadworks National HighwaysStarts in 1 hour 1 minute
A2 eastbound lane 2 closure (117/2a to 118/8a)
A2 eastbound Cobham exit slip road closure
Planned Roadworks National HighwaysStarts in 1 hour 1 minute
A2 eastbound Cobham exit slip road closure
A2 eastbound lane 1 closure (40/6A to 42/1)
Planned Roadworks National HighwaysStarts in 1 hour 1 minute
A2 eastbound lane 1 closure (40/6A to 42/1)
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
Cleared Roadworks National HighwaysCleared 12 hours 58 minutes ago
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)