A2 eastbound hardshoulder closure (32/9 to 33/7)

Planned

A2 eastbound hardshoulder closure (32/9 to 33/7)

Start time
Thu, Dec 18, 2025 9:00 AM
Expected end
Thu, Dec 18, 2025 3:00 PM
Duration
6 hours
Road
A2 – A2 Eastbound Between B255 And A296
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Reason
Tree And Vegetation Cutting Work
Active
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Wed, Dec 17, 2025 3:31 PM
Last updated
Thu, Dec 18, 2025 6:48 AM
Cleared
Thu, Dec 18, 2025 3:00 PM
  • Latest update: A2 eastbound hardshoulder closure (32/9 to 33/7)
Coordinates
51.430508, 0.301302
Latitude span
51.430461 – 51.430540
Longitude span
0.296983 – 0.307925
Bounding box centre
51.430501, 0.302454
Location descriptions
  • A2 eastbound between B255 and A296
  • A2 eastbound between A296 and A2260
Feed validity status
Planned
Overall feed start
Thu, Dec 18, 2025 9:00 AM
Overall feed end
Thu, Dec 18, 2025 3:00 PM
Feed window length
6 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
A2 eastbound between B255 and A296
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
4 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A2
Linear Element Model
The Network Model
Linear Element Id
{BFFD7CBB-90E2-8383-2DE5-2E431E57CD05}
Linear Element Type
A Carriageway
From Distance
843 m
To Distance
922 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.43054 0.296983
51.430533 0.29812

Segment 2

10 coordinate pairs
Description
A2 eastbound between A296 and A2260
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
5 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A2
Linear Element Model
The Network Model
Linear Element Id
{686413D5-5AE2-4A3E-B7F1-0B2629E67706}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
681 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.430533 0.29812
51.430534 0.298329
51.430529 0.298629
51.430523 0.299854
51.430506 0.300268
51.430494 0.30288
51.430494 0.302901
51.430478 0.305119
51.430468 0.30649
51.430461 0.307925
Geometry type
MultiLineString
Geometry points
12
First coordinate pair
0.296983, 51.430540
Road section segments
1
Road section points
12
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                0.296983,
                51.43054
            ],
            [
                0.29812,
                51.430533
            ],
            [
                0.29812,
                51.430533
            ],
            [
                0.298329,
                51.430534
            ],
            [
                0.298629,
                51.430529
            ],
            [
                0.299854,
                51.430523
            ],
            [
                0.300268,
                51.430506
            ],
            [
                0.30288,
                51.430494
            ],
            [
                0.302901,
                51.430494
            ],
            [
                0.305119,
                51.430478
            ],
            [
                0.30649,
                51.430468
            ],
            [
                0.307925,
                51.430461
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            0.296983,
            51.43054
        ],
        [
            0.29812,
            51.430533
        ],
        [
            0.29812,
            51.430533
        ],
        [
            0.298329,
            51.430534
        ],
        [
            0.298629,
            51.430529
        ],
        [
            0.299854,
            51.430523
        ],
        [
            0.300268,
            51.430506
        ],
        [
            0.30288,
            51.430494
        ],
        [
            0.302901,
            51.430494
        ],
        [
            0.305119,
            51.430478
        ],
        [
            0.30649,
            51.430468
        ],
        [
            0.307925,
            51.430461
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Wed, Dec 17, 2025 3:31 PM
Record versioned
Thu, Dec 18, 2025 6:48 AM
Coordinate source
Geometry

Related incidents

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Planned National Highways
Dartford A282 · A282 Northbound Dartford Crossing
Starts 7 Jun 2026, 21:30 Expected 8 Jun 2026, 04:30

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Category: Road Maintenance
View update

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Cleared National Highways
Dartford A282 · A282 Northbound Dartford Crossing
Starts 6 Jun 2026, 21:00 Expected 7 Jun 2026, 04:00

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Category: Road Maintenance
View update

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Cleared National Highways
Dartford A282 · A282 Northbound Dartford Crossing
Starts 6 Jun 2026, 21:00 Expected 7 Jun 2026, 04:00

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Category: Road Maintenance
View update

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Cleared National Highways
Dartford A282 · A282 Northbound Dartford Crossing
Starts 6 Jun 2026, 21:00 Expected 7 Jun 2026, 04:00

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Category: Road Maintenance
View update

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Planned National Highways
Dartford A282 · A282 Northbound Dartford Crossing
Starts 6 Jun 2026, 21:00 Expected 7 Jun 2026, 04:00

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Category: Road Maintenance
View update

A2 northbound lane 2 closure (Eastern Docks to Duke of York roundabout)

Cleared National Highways
Dover A2 · A2 Westbound Between A20 And A258
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

A2 northbound lane 2 closure (Eastern Docks to Duke of York roundabout)

Category: Road Maintenance
View update