A2 eastbound Ebbsfleet entry slip road closure

Planned

A2 eastbound Ebbsfleet entry slip road closure

Start time
Wed, Aug 12, 2026 7:00 PM
Expected end
Thu, Aug 13, 2026 5:00 AM
Duration
10 hours
Road
A2 – A2 Eastbound Access From A2260
Category
Road Maintenance
Direction
Eastbound
Reason
Tree And Vegetation Cutting Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Aug 6, 2026 9:35 AM
Last updated
Wed, Aug 12, 2026 4:01 AM
Cleared
Thu, Aug 13, 2026 5:00 AM
  • Latest update: A2 eastbound Ebbsfleet entry slip road closure
Coordinates
51.429572, 0.324521
Latitude span
51.428051 – 51.430382
Longitude span
0.322906 – 0.327503
Bounding box centre
51.429217, 0.325205
Location descriptions
  • A2 eastbound access from A2260
Feed validity status
Planned
Overall feed start
Wed, Aug 12, 2026 7:00 PM
Overall feed end
Thu, Aug 13, 2026 5:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

8 coordinate pairs
Description
A2 eastbound access from A2260
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A2
Linear Element Model
The Network Model
Linear Element Id
{C508D038-D885-4CC1-80A6-5B0C0B8640CB}
Linear Element Type
A Carriageway Entry Slip
From Distance
0 m
To Distance
405 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.430348 0.322977
51.430335 0.323003
51.429909 0.323809
51.429497 0.324664
51.429263 0.325166
51.42913 0.325425
51.428458 0.326779
51.428051 0.327503

Segment 2

2 coordinate pairs
Description
A2 eastbound access from A2260
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A2
Linear Element Model
The Network Model
Linear Element Id
{3A79C3C6-137B-4EC2-B50C-4CCAEC067D5E}
Linear Element Type
A Carriageway Entry Slip
From Distance
117 m
To Distance
123 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.430382 0.322906
51.430348 0.322977
Geometry type
MultiLineString
Geometry points
10
First coordinate pair
0.322977, 51.430348
Road section segments
1
Road section points
10
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                0.322977,
                51.430348
            ],
            [
                0.323003,
                51.430335
            ],
            [
                0.323809,
                51.429909
            ],
            [
                0.324664,
                51.429497
            ],
            [
                0.325166,
                51.429263
            ],
            [
                0.325425,
                51.42913
            ],
            [
                0.326779,
                51.428458
            ],
            [
                0.327503,
                51.428051
            ],
            [
                0.322906,
                51.430382
            ],
            [
                0.322977,
                51.430348
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            0.322977,
            51.430348
        ],
        [
            0.323003,
            51.430335
        ],
        [
            0.323809,
            51.429909
        ],
        [
            0.324664,
            51.429497
        ],
        [
            0.325166,
            51.429263
        ],
        [
            0.325425,
            51.42913
        ],
        [
            0.326779,
            51.428458
        ],
        [
            0.327503,
            51.428051
        ],
        [
            0.322906,
            51.430382
        ],
        [
            0.322977,
            51.430348
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
2
Record created
Thu, Aug 6, 2026 9:35 AM
Record versioned
Wed, Aug 12, 2026 4:01 AM
Coordinate source
Geometry

Driving on the A2? See every live closure, roadwork and planned restriction on this road.

A2 live closures

Related incidents

A282 Northbound Jct 2 to Jct 1A carriageway closure

Planned Roadworks National Highways
Dartford M25 · M25 Anti-Clockwise Within J2

Starts in 9 hours 40 minutes

Starts 12 Aug 2026, 21:00 Expected clear 13 Aug 2026, 04:30

A282 Northbound Jct 2 to Jct 1A carriageway closure

Category: Construction Work
View update

M25 Anti-clockwise Jct 2 exit slip road lane 2 closure

Planned Roadworks National Highways
Dartford M25 · M25 Anti-Clockwise Between J3 And J2

Starts in 9 hours 40 minutes

Starts 12 Aug 2026, 21:00 Expected clear 13 Aug 2026, 04:30

M25 Anti-clockwise Jct 2 exit slip road lane 2 closure

Category: Construction Work
View update

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Planned Roadworks National Highways
Dartford A282 · A282 Northbound Dartford Crossing

Starts in 9 hours 40 minutes

Starts 12 Aug 2026, 21:00 Expected clear 13 Aug 2026, 04:30

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Category: Road Maintenance
View update

A2 eastbound lane 1 closure ( 33/4a to 38/0a)

Planned Roadworks National Highways
Gravesend A2 · A2 Eastbound Within The A2260 Junction

Starts in 7 hours 40 minutes

Starts 12 Aug 2026, 19:00 Expected clear 13 Aug 2026, 05:00

A2 eastbound lane 1 closure ( 33/4a to 38/0a)

Category: Road Maintenance
View update

A282 Northbound Jct 2 to Jct 1A carriageway closure

Cleared Roadworks National Highways
Dartford M25 · M25 Anti-Clockwise Within J2

Cleared 14 hours 18 minutes ago

Started 11 Aug 2026, 21:00 Ended 11 Aug 2026, 21:00

A282 Northbound Jct 2 to Jct 1A carriageway closure

Category: Construction Work
View update

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Cleared Roadworks National Highways
Dartford A282 · A282 Northbound Dartford Crossing

Cleared 8 hours 48 minutes ago

Started 11 Aug 2026, 21:00 Ended 12 Aug 2026, 02:30

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Category: Road Maintenance
View update