A2 eastbound Ebbsfleet entry slip road closure
PlannedA2 eastbound Ebbsfleet entry slip road closure
- Start time
- Wed, Aug 12, 2026 7:00 PM
- Expected end
- Thu, Aug 13, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A2 – A2 Eastbound Access From A2260
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Aug 6, 2026 9:35 AM
- Last updated
- Wed, Aug 12, 2026 4:01 AM
- Cleared
- Thu, Aug 13, 2026 5:00 AM
- Latest update: A2 eastbound Ebbsfleet entry slip road closure
- Coordinates
- 51.429572, 0.324521
- Latitude span
- 51.428051 – 51.430382
- Longitude span
- 0.322906 – 0.327503
- Bounding box centre
- 51.429217, 0.325205
- Location descriptions
-
- A2 eastbound access from A2260
- Feed validity status
- Planned
- Overall feed start
- Wed, Aug 12, 2026 7:00 PM
- Overall feed end
- Thu, Aug 13, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- A2 eastbound access from A2260
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A2
- Linear Element Model
- The Network Model
- Linear Element Id
- {C508D038-D885-4CC1-80A6-5B0C0B8640CB}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 405 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.430348 0.322977 51.430335 0.323003 51.429909 0.323809 51.429497 0.324664 51.429263 0.325166 51.42913 0.325425 51.428458 0.326779 51.428051 0.327503
Segment 2
2 coordinate pairs- Description
- A2 eastbound access from A2260
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A2
- Linear Element Model
- The Network Model
- Linear Element Id
- {3A79C3C6-137B-4EC2-B50C-4CCAEC067D5E}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 117 m
- To Distance
- 123 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.430382 0.322906 51.430348 0.322977
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- 0.322977, 51.430348
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.322977,
51.430348
],
[
0.323003,
51.430335
],
[
0.323809,
51.429909
],
[
0.324664,
51.429497
],
[
0.325166,
51.429263
],
[
0.325425,
51.42913
],
[
0.326779,
51.428458
],
[
0.327503,
51.428051
],
[
0.322906,
51.430382
],
[
0.322977,
51.430348
]
]
]
}
View road section coordinates
[
[
[
0.322977,
51.430348
],
[
0.323003,
51.430335
],
[
0.323809,
51.429909
],
[
0.324664,
51.429497
],
[
0.325166,
51.429263
],
[
0.325425,
51.42913
],
[
0.326779,
51.428458
],
[
0.327503,
51.428051
],
[
0.322906,
51.430382
],
[
0.322977,
51.430348
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Aug 6, 2026 9:35 AM
- Record versioned
- Wed, Aug 12, 2026 4:01 AM
- Coordinate source
- Geometry
Driving on the A2? See every live closure, roadwork and planned restriction on this road.
A2 live closuresRelated incidents
A282 Northbound Jct 2 to Jct 1A carriageway closure
Planned Roadworks National HighwaysStarts in 9 hours 40 minutes
A282 Northbound Jct 2 to Jct 1A carriageway closure
M25 Anti-clockwise Jct 2 exit slip road lane 2 closure
Planned Roadworks National HighwaysStarts in 9 hours 40 minutes
M25 Anti-clockwise Jct 2 exit slip road lane 2 closure
A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m
Planned Roadworks National HighwaysStarts in 9 hours 40 minutes
A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m
A2 eastbound lane 1 closure ( 33/4a to 38/0a)
Planned Roadworks National HighwaysStarts in 7 hours 40 minutes
A2 eastbound lane 1 closure ( 33/4a to 38/0a)
A282 Northbound Jct 2 to Jct 1A carriageway closure
Cleared Roadworks National HighwaysCleared 14 hours 18 minutes ago
A282 Northbound Jct 2 to Jct 1A carriageway closure
A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m
Cleared Roadworks National HighwaysCleared 8 hours 48 minutes ago
A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m