A2 Eastbound Darenth Interchange exit slip road lane 2 closure

Planned

A2 Eastbound Darenth Interchange exit slip road lane 2 closure

Start time
Mon, Aug 24, 2026 9:00 PM
Expected end
Tue, Aug 25, 2026 4:30 AM
Duration
7 hours 30 minutes
Road
A2 – A2 Eastbound Exit For M25/A282
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 1 lanes affected, 1 of 3 lanes affected
Reason
Maintenance Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, May 22, 2026 1:37 PM
Last updated
Mon, Aug 24, 2026 3:33 AM
Cleared
Tue, Aug 25, 2026 4:30 AM
  • Latest update: A2 Eastbound Darenth Interchange exit slip road lane 2 closure
Coordinates
51.426127, 0.233456
Latitude span
51.425853 – 51.426633
Longitude span
0.229524 – 0.237150
Bounding box centre
51.426243, 0.233337
Location descriptions
  • A2 eastbound exit for M25/A282
  • A2 eastbound between A2018 and M25/A282
Feed validity status
Planned
Overall feed start
Mon, Aug 24, 2026 9:00 PM
Overall feed end
Tue, Aug 25, 2026 4:30 AM
Feed window length
7 hours 30 minutes
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

11 coordinate pairs
Description
A2 eastbound exit for M25/A282
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A2
Linear Element Model
The Network Model
Linear Element Id
{3DDD5549-991A-4609-B965-B5DA5F4C1397}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
372 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.425878 0.231943
51.42591 0.232175
51.425951 0.232378
51.425999 0.232697
51.426044 0.233145
51.426151 0.234129
51.426326 0.235317
51.426333 0.235365
51.426366 0.235607
51.426599 0.237057
51.426633 0.23715

Segment 2

3 coordinate pairs
Description
A2 eastbound between A2018 and M25/A282
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start2 End1
Linear Element Road
A2
Linear Element Model
The Network Model
Linear Element Id
{E207E282-0164-4BE6-954F-AA9F1CE5429A}
Linear Element Type
A Carriageway
From Distance
29 m
To Distance
198 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.425861 0.229524
51.425853 0.229957
51.425878 0.231943
Geometry type
MultiLineString
Geometry points
14
First coordinate pair
0.231943, 51.425878
Road section segments
1
Road section points
14
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                0.231943,
                51.425878
            ],
            [
                0.232175,
                51.42591
            ],
            [
                0.232378,
                51.425951
            ],
            [
                0.232697,
                51.425999
            ],
            [
                0.233145,
                51.426044
            ],
            [
                0.234129,
                51.426151
            ],
            [
                0.235317,
                51.426326
            ],
            [
                0.235365,
                51.426333
            ],
            [
                0.235607,
                51.426366
            ],
            [
                0.237057,
                51.426599
            ],
            [
                0.23715,
                51.426633
            ],
            [
                0.229524,
                51.425861
            ],
            [
                0.229957,
                51.425853
            ],
            [
                0.231943,
                51.425878
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            0.231943,
            51.425878
        ],
        [
            0.232175,
            51.42591
        ],
        [
            0.232378,
            51.425951
        ],
        [
            0.232697,
            51.425999
        ],
        [
            0.233145,
            51.426044
        ],
        [
            0.234129,
            51.426151
        ],
        [
            0.235317,
            51.426326
        ],
        [
            0.235365,
            51.426333
        ],
        [
            0.235607,
            51.426366
        ],
        [
            0.237057,
            51.426599
        ],
        [
            0.23715,
            51.426633
        ],
        [
            0.229524,
            51.425861
        ],
        [
            0.229957,
            51.425853
        ],
        [
            0.231943,
            51.425878
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Maintenance Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Fri, May 22, 2026 1:37 PM
Record versioned
Mon, Aug 24, 2026 3:33 AM
Coordinate source
Geometry

Driving on the A2? See every live closure, roadwork and planned restriction on this road.

A2 live closures

Related incidents

A2 Eastbound Dartford Heath to Darenth Interchange lane 1 closure

Planned Roadworks National Highways
Dartford A2 · A2 Eastbound Between A2018 And M25/A282

Starts in 13 hours 50 minutes

Starts 24 Aug 2026, 21:00 Expected clear 25 Aug 2026, 04:30

A2 Eastbound Dartford Heath to Darenth Interchange lane 1 closure

Category: Road Maintenance
View update

M25 Anti-clockwise Jct 2 to A2 Westbound Darenth Interchange link road closure

Planned Roadworks National Highways
Dartford M25 · M25 J2 Anticlockwise Exit

Starts in 13 hours 50 minutes

Starts 24 Aug 2026, 21:00 Expected clear 25 Aug 2026, 04:30

M25 Anti-clockwise Jct 2 to A2 Westbound Darenth Interchange link road closure

Category: Road Maintenance
View update

A206 Eastbound Little Brook Interchange Overbridge lane closure

Planned Roadworks National Highways
Dartford A282 · Carriageway Connector At A206 Eastbound From A206/A282 Westbound

Starts in 13 hours 50 minutes

Starts 24 Aug 2026, 21:00 Expected clear 25 Aug 2026, 04:30

A206 Eastbound Little Brook Interchange Overbridge lane closure

Category: Road Maintenance
View update

A2 eastbound lane 1 closure (90/1A to 92/7A)

Planned Roadworks National Highways
Canterbury A2 · A2 Eastbound Between M2 And A2050 Near Canterbury (West)

Starts in 11 hours 50 minutes

Starts 24 Aug 2026, 19:00 Expected clear 25 Aug 2026, 03:00

A2 eastbound lane 1 closure (90/1A to 92/7A)

Category: Construction Work
View update

A2 eastbound lane 2 closure (116/3a to 118/7a)

Planned Roadworks National Highways
Dover A2 · A2 Eastbound Between A260 And A256 Near Whitfield (West)

Starts in 11 hours 50 minutes

Starts 24 Aug 2026, 19:00 Expected clear 25 Aug 2026, 05:00

A2 eastbound lane 2 closure (116/3a to 118/7a)

Category: Road Maintenance
View update

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Cleared Roadworks National Highways
Dartford A282 · A282 Northbound Dartford Crossing

Cleared 3 hours 34 minutes ago

Started 23 Aug 2026, 21:30 Ended 24 Aug 2026, 03:35

A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m

Category: Road Maintenance
View update