A1(M) southbound Jct 8 to Jct 7 hard shoulder closure (MP 47/3 to 47/0)
ClearedA1(M) southbound Jct 8 to Jct 7 hard shoulder closure (MP 47/3 to 47/0)
- Start time
- Mon, Dec 1, 2025 9:00 PM
- Expected end
- Tue, Dec 2, 2025 5:00 AM
- Duration
- 8 hours
- Road
- A1(M) – A1(M) Southbound Within J7
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Dec 1, 2025 12:38 PM
- Last updated
- Tue, Dec 2, 2025 3:44 AM
- Cleared
- Tue, Dec 2, 2025 5:00 AM
- Latest update: A1(M) southbound Jct 8 to Jct 7 hard shoulder closure (MP 47/3 to 47/0)
- Coordinates
- 51.888391, -0.206739
- Latitude span
- 51.887425 – 51.890199
- Longitude span
- -0.207998 – -0.206142
- Bounding box centre
- 51.888812, -0.207070
- Location descriptions
-
- A1(M) southbound within J7
- Feed validity status
- Planned
- Overall feed start
- Mon, Dec 1, 2025 9:00 PM
- Overall feed end
- Tue, Dec 2, 2025 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A1(M) southbound within J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {18585F0F-9618-40C9-8CEA-7E2B4EC1E06E}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 82 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.888125 -0.206536 51.888061 -0.206495 51.887653 -0.206279 51.887425 -0.206142
Segment 2
4 coordinate pairs- Description
- A1(M) southbound within J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {255FDA37-B80C-457D-91E3-2D8D4B6D7C88}
- Linear Element Type
- B Carriageway
- From Distance
- 58 m
- To Distance
- 310 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.890199 -0.207998 51.888924 -0.207071 51.888615 -0.206851 51.888125 -0.206536
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -0.206536, 51.888125
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.206536,
51.888125
],
[
-0.206495,
51.888061
],
[
-0.206279,
51.887653
],
[
-0.206142,
51.887425
],
[
-0.207998,
51.890199
],
[
-0.207071,
51.888924
],
[
-0.206851,
51.888615
],
[
-0.206536,
51.888125
]
]
]
}
View road section coordinates
[
[
[
-0.206536,
51.888125
],
[
-0.206495,
51.888061
],
[
-0.206279,
51.887653
],
[
-0.206142,
51.887425
],
[
-0.207998,
51.890199
],
[
-0.207071,
51.888924
],
[
-0.206851,
51.888615
],
[
-0.206536,
51.888125
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Dec 1, 2025 12:38 PM
- Record versioned
- Tue, Dec 2, 2025 3:44 AM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1M southbound Jct 45 to Jct 44 hard shoulder closure ( 60/0 59/4)
Planned Roadworks National HighwaysExpected to clear in 2 days 3 hours
A1M southbound Jct 45 to Jct 44 hard shoulder closure ( 60/0 59/4)
A1(M) northbound Sawtry hard shoulder closure and 50mph speed restrictions on lanes 1,2, 3, 4
Planned Roadworks National HighwaysExpected to clear in 2 weeks 2 days
A1(M) northbound Sawtry hard shoulder closure and 50mph speed restrictions on lanes 1,2, 3, 4
A1(M) Southbound Jct 5 to Jct 4 lane 3,2 closure
Planned Roadworks National HighwaysStarts in 8 hours 44 minutes
A1(M) Southbound Jct 5 to Jct 4 lane 3,2 closure
A1(M) Southbound Jct 4 to Jct 2 lane 3,2 closure
Cleared Roadworks National HighwaysCleared 8 hours 45 minutes ago
A1(M) Southbound Jct 4 to Jct 2 lane 3,2 closure
A1M Northbound Jct 3 Exit Slip Road Lane 1 Closure
Cleared Roadworks National HighwaysCleared 11 hours 40 minutes ago
A1M Northbound Jct 3 Exit Slip Road Lane 1 Closure
A1(M) Southbound Jct 4 to Jct 2 lane 3,2 closure
Cleared Roadworks National HighwaysCleared 15 hours 10 minutes ago
A1(M) Southbound Jct 4 to Jct 2 lane 3,2 closure