A1(M) Southbound Jct 6 to Jct 4 Carriageway closure
ClearedA1(M) Southbound Jct 6 to Jct 4 Carriageway closure
- Start time
- Fri, Dec 12, 2025 11:00 PM
- Expected end
- Sat, Dec 13, 2025 5:00 AM
- Duration
- 6 hours
- Road
- A1(M) – A1(M) Southbound Between J6 And J4
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Litter Clearance
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Dec 12, 2025 4:55 AM
- Last updated
- Fri, Dec 12, 2025 7:29 PM
- Cleared
- Sat, Dec 13, 2025 5:00 AM
- Latest update: A1(M) Southbound Jct 6 to Jct 4 Carriageway closure
- Coordinates
- 51.780493, -0.222292
- Latitude span
- 51.779121 – 51.782668
- Longitude span
- -0.222597 – -0.221897
- Bounding box centre
- 51.780895, -0.222247
- Location descriptions
-
- A1(M) southbound between J6 and J4
- A1(M) J4 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Dec 12, 2025 11:00 PM
- Overall feed end
- Sat, Dec 13, 2025 5:00 AM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- A1(M) southbound between J6 and J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {6FB4CDA8-574C-4D92-98B7-64B764BF5180}
- Linear Element Type
- B Carriageway
- From Distance
- 232 m
- To Distance
- 280 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.782668 -0.222597 51.782559 -0.222569 51.782241 -0.222498
Segment 2
15 coordinate pairs- Description
- A1(M) J4 southbound exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {66FB9FF5-8880-426A-8408-650F3121B8E4}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 359 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.782241 -0.222498 51.781707 -0.222381 51.781314 -0.22234 51.78092 -0.222304 51.780477 -0.222288 51.780298 -0.222295 51.779839 -0.222313 51.779722 -0.222318 51.779534 -0.222325 51.779407 -0.222301 51.779308 -0.222233 51.779225 -0.222135 51.77916 -0.222021 51.779132 -0.221935 51.779121 -0.221897
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- -0.222597, 51.782668
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.222597,
51.782668
],
[
-0.222569,
51.782559
],
[
-0.222498,
51.782241
],
[
-0.222498,
51.782241
],
[
-0.222381,
51.781707
],
[
-0.22234,
51.781314
],
[
-0.222304,
51.78092
],
[
-0.222288,
51.780477
],
[
-0.222295,
51.780298
],
[
-0.222313,
51.779839
],
[
-0.222318,
51.779722
],
[
-0.222325,
51.779534
],
[
-0.222301,
51.779407
],
[
-0.222233,
51.779308
],
[
-0.222135,
51.779225
],
[
-0.222021,
51.77916
],
[
-0.221935,
51.779132
],
[
-0.221897,
51.779121
]
]
]
}
View road section coordinates
[
[
[
-0.222597,
51.782668
],
[
-0.222569,
51.782559
],
[
-0.222498,
51.782241
],
[
-0.222498,
51.782241
],
[
-0.222381,
51.781707
],
[
-0.22234,
51.781314
],
[
-0.222304,
51.78092
],
[
-0.222288,
51.780477
],
[
-0.222295,
51.780298
],
[
-0.222313,
51.779839
],
[
-0.222318,
51.779722
],
[
-0.222325,
51.779534
],
[
-0.222301,
51.779407
],
[
-0.222233,
51.779308
],
[
-0.222135,
51.779225
],
[
-0.222021,
51.77916
],
[
-0.221935,
51.779132
],
[
-0.221897,
51.779121
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Litter Clearance
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Dec 12, 2025 4:55 AM
- Record versioned
- Fri, Dec 12, 2025 7:29 PM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1M southbound Jct 45 to Jct 44 hard shoulder closure ( 60/0 59/4)
Planned Roadworks National HighwaysExpected to clear in 1 day 18 hours
A1M southbound Jct 45 to Jct 44 hard shoulder closure ( 60/0 59/4)
A1(M) northbound Sawtry hard shoulder closure and 50mph speed restrictions on lanes 1,2, 3, 4
Planned Roadworks National HighwaysExpected to clear in 2 weeks 2 days
A1(M) northbound Sawtry hard shoulder closure and 50mph speed restrictions on lanes 1,2, 3, 4
A1(M) Southbound Jct 5 to Jct 4 lane 3,2 closure
Planned Roadworks National HighwaysStarts in 13 minutes 21 seconds
A1(M) Southbound Jct 5 to Jct 4 lane 3,2 closure
A1(M) Southbound Jct 4 to Jct 2 lane 3,2 closure
Cleared Roadworks National HighwaysCleared 17 hours 16 minutes ago
A1(M) Southbound Jct 4 to Jct 2 lane 3,2 closure
A1M Northbound Jct 3 Exit Slip Road Lane 1 Closure
Cleared Roadworks National HighwaysCleared 20 hours 11 minutes ago
A1M Northbound Jct 3 Exit Slip Road Lane 1 Closure
A1(M) Southbound Jct 4 to Jct 2 lane 3,2 closure
Cleared Roadworks National HighwaysCleared 23 hours 41 minutes ago
A1(M) Southbound Jct 4 to Jct 2 lane 3,2 closure