A1(M) northbound Jct 9 exit slip road closure
PlannedA1(M) northbound Jct 9 exit slip road closure
- Start time
- Tue, Oct 13, 2026 8:00 PM
- Expected end
- Wed, Oct 14, 2026 4:00 AM
- Duration
- 8 hours
- Road
- A1(M) – A1(M) J9 Northbound Exit
- Category
- Construction Work
- Direction
- Northbound
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 5, 2026 8:50 AM
- Last updated
- Tue, Oct 13, 2026 2:17 AM
- Cleared
- Wed, Oct 14, 2026 4:00 AM
- Latest update: A1(M) northbound Jct 9 exit slip road closure
- Coordinates
- 51.961505, -0.206421
- Latitude span
- 51.959588 – 51.963261
- Longitude span
- -0.207977 – -0.204636
- Bounding box centre
- 51.961425, -0.206307
- Location descriptions
-
- A1(M) J9 northbound exit
- Feed validity status
- Planned
- Overall feed start
- Tue, Oct 13, 2026 8:00 PM
- Overall feed end
- Wed, Oct 14, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- A1(M) J9 northbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {318FECAD-F837-439F-8E82-211AA24629BF}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 341 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.959588 -0.207977 51.960088 -0.20771 51.960208 -0.207632 51.960328 -0.207554 51.96056 -0.2074 51.960959 -0.207063 51.961331 -0.206714 51.962129 -0.205954 51.962321 -0.205751
Segment 2
4 coordinate pairs- Description
- A1(M) J9 northbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {36E6E147-E29A-4D61-88B2-6E1596154741}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 129 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.962321 -0.205751 51.963217 -0.204689 51.963252 -0.204643 51.963261 -0.204636
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -0.207977, 51.959588
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.207977,
51.959588
],
[
-0.20771,
51.960088
],
[
-0.207632,
51.960208
],
[
-0.207554,
51.960328
],
[
-0.2074,
51.96056
],
[
-0.207063,
51.960959
],
[
-0.206714,
51.961331
],
[
-0.205954,
51.962129
],
[
-0.205751,
51.962321
],
[
-0.205751,
51.962321
],
[
-0.204689,
51.963217
],
[
-0.204643,
51.963252
],
[
-0.204636,
51.963261
]
]
]
}
View road section coordinates
[
[
[
-0.207977,
51.959588
],
[
-0.20771,
51.960088
],
[
-0.207632,
51.960208
],
[
-0.207554,
51.960328
],
[
-0.2074,
51.96056
],
[
-0.207063,
51.960959
],
[
-0.206714,
51.961331
],
[
-0.205954,
51.962129
],
[
-0.205751,
51.962321
],
[
-0.205751,
51.962321
],
[
-0.204689,
51.963217
],
[
-0.204643,
51.963252
],
[
-0.204636,
51.963261
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 5, 2026 8:50 AM
- Record versioned
- Tue, Oct 13, 2026 2:17 AM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1(M) northbound Jct 7 to Jct 10 IPV works
Planned Roadworks National HighwaysStarts in 16 hours 51 minutes
A1(M) northbound Jct 7 to Jct 10 IPV works
A1(M) northbound Jct 8 to Jct 9 hardshoulder, lane 1,2 closures
Planned Roadworks National HighwaysStarts in 16 hours 51 minutes
A1(M) northbound Jct 8 to Jct 9 hardshoulder, lane 1,2 closures
A1 southbound Biggleswade south to Langford lane 2 closure (MP 70/2 to 66/2)
Planned Roadworks National HighwaysStarts in 16 hours 51 minutes
A1 southbound Biggleswade south to Langford lane 2 closure (MP 70/2 to 66/2)
A1(M) northbound Jct 6 to Jct 10 mobile lane closure
Planned Roadworks National HighwaysStarts in 5 hours 21 minutes
A1(M) northbound Jct 6 to Jct 10 mobile lane closure
A1(M) both directions Jct 14 to 17 mobile lane 3 closure
Cleared Roadworks National HighwaysExpected to clear in 51 minutes 4 seconds
A1(M) both directions Jct 14 to 17 mobile lane 3 closure
A1(M) northbound Jct 7 to Jct 10 IPV works
Cleared Roadworks National HighwaysCleared 23 minutes 54 seconds ago
A1(M) northbound Jct 7 to Jct 10 IPV works