A1M northbound Jct 10 to Jct 9 lane 1 and hard shoulder closure
PlannedA1M northbound Jct 10 to Jct 9 lane 1 and hard shoulder closure
- Start time
- Mon, Oct 26, 2026 9:00 PM
- Expected end
- Tue, Oct 27, 2026 5:00 AM
- Duration
- 8 hours
- Road
- A1(M) – A1(M) Northbound Between J8 And J9
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 3 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sat, Oct 24, 2026 1:05 AM
- Last updated
- Mon, Oct 26, 2026 10:31 AM
- Cleared
- Tue, Oct 27, 2026 5:00 AM
- Latest update: A1M northbound Jct 10 to Jct 9 lane 1 and hard shoulder closure
- Coordinates
- 51.950610, -0.211370
- Latitude span
- 51.941536 – 51.958373
- Longitude span
- -0.213764 – -0.208900
- Bounding box centre
- 51.949955, -0.211332
- Location descriptions
-
- A1(M) northbound between J8 and J9
- Feed validity status
- Planned
- Overall feed start
- Mon, Oct 26, 2026 9:00 PM
- Overall feed end
- Tue, Oct 27, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- A1(M) northbound between J8 and J9
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {5D7A8431-275F-4477-B378-3D0C49D5508B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 352 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.955371 -0.21053 51.955508 -0.210483 51.955611 -0.210435 51.956195 -0.210165 51.956642 -0.209943 51.957596 -0.209425 51.958184 -0.209037 51.958373 -0.2089
Segment 2
18 coordinate pairs- Description
- A1(M) northbound between J8 and J9
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {A32EBA41-2EC1-4C44-9CA5-14F6550FD2AE}
- Linear Element Type
- A Carriageway
- From Distance
- 134 m
- To Distance
- 1,693 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.941536 -0.213764 51.942575 -0.213298 51.943067 -0.213104 51.943853 -0.212781 51.943862 -0.212778 51.944068 -0.212714 51.944587 -0.212548 51.945921 -0.21219 51.946871 -0.211992 51.947452 -0.21191 51.947742 -0.21187 51.949025 -0.211717 51.952167 -0.21133 51.952624 -0.211253 51.953117 -0.211161 51.953646 -0.211052 51.954891 -0.210697 51.955371 -0.21053
- Geometry type
- MultiLineString
- Geometry points
- 26
- First coordinate pair
- -0.210530, 51.955371
- Road section segments
- 1
- Road section points
- 26
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.21053,
51.955371
],
[
-0.210483,
51.955508
],
[
-0.210435,
51.955611
],
[
-0.210165,
51.956195
],
[
-0.209943,
51.956642
],
[
-0.209425,
51.957596
],
[
-0.209037,
51.958184
],
[
-0.2089,
51.958373
],
[
-0.213764,
51.941536
],
[
-0.213298,
51.942575
],
[
-0.213104,
51.943067
],
[
-0.212781,
51.943853
],
[
-0.212778,
51.943862
],
[
-0.212714,
51.944068
],
[
-0.212548,
51.944587
],
[
-0.21219,
51.945921
],
[
-0.211992,
51.946871
],
[
-0.21191,
51.947452
],
[
-0.21187,
51.947742
],
[
-0.211717,
51.949025
],
[
-0.21133,
51.952167
],
[
-0.211253,
51.952624
],
[
-0.211161,
51.953117
],
[
-0.211052,
51.953646
],
[
-0.210697,
51.954891
],
[
-0.21053,
51.955371
]
]
]
}
View road section coordinates
[
[
[
-0.21053,
51.955371
],
[
-0.210483,
51.955508
],
[
-0.210435,
51.955611
],
[
-0.210165,
51.956195
],
[
-0.209943,
51.956642
],
[
-0.209425,
51.957596
],
[
-0.209037,
51.958184
],
[
-0.2089,
51.958373
],
[
-0.213764,
51.941536
],
[
-0.213298,
51.942575
],
[
-0.213104,
51.943067
],
[
-0.212781,
51.943853
],
[
-0.212778,
51.943862
],
[
-0.212714,
51.944068
],
[
-0.212548,
51.944587
],
[
-0.21219,
51.945921
],
[
-0.211992,
51.946871
],
[
-0.21191,
51.947452
],
[
-0.21187,
51.947742
],
[
-0.211717,
51.949025
],
[
-0.21133,
51.952167
],
[
-0.211253,
51.952624
],
[
-0.211161,
51.953117
],
[
-0.211052,
51.953646
],
[
-0.210697,
51.954891
],
[
-0.21053,
51.955371
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sat, Oct 24, 2026 1:05 AM
- Record versioned
- Mon, Oct 26, 2026 10:31 AM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1(M) northbound Jct 7 to Jct 10 IPV hard shoulder
Planned Roadworks National HighwaysExpected to clear in 2 hours 42 minutes
A1(M) northbound Jct 7 to Jct 10 IPV hard shoulder
A1M northbound Jct 9 exit slip road closure
Planned Roadworks National HighwaysStarts in 8 hours 12 minutes
A1M northbound Jct 9 exit slip road closure
A1 southbound Alconbury to Brampton hut lane closures
Planned Roadworks National HighwaysStarts in 8 hours 12 minutes
A1 southbound Alconbury to Brampton hut lane closures
A1m southbound Jct 35 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 7 hours 12 minutes
A1m southbound Jct 35 exit slip road lane 1 closure
A1M Jct 63 to Jct 62 Southbound Lane 1 Closure (2)
Planned Roadworks National HighwaysStarts in 7 hours 12 minutes
A1M Jct 63 to Jct 62 Southbound Lane 1 Closure (2)
A1m southbound Jct 35 exit slip road lane 1 closure (12/4)
Planned Roadworks National HighwaysStarts in 7 hours 12 minutes
A1m southbound Jct 35 exit slip road lane 1 closure (12/4)