A1(M) NB Jct 14 to Jct 15 Lane 1 & HS Closure for Signs Erection MP12/1 to MP 12/7
ClearedA1(M) NB Jct 14 to Jct 15 Lane 1 & HS Closure for Signs Erection MP12/1 to MP 12/7
- Start time
- Wed, Dec 10, 2025 8:00 PM
- Expected end
- Thu, Dec 11, 2025 6:00 AM
- Duration
- 10 hours
- Road
- A1(M) – A1(M) Northbound Between J14 And J15
- Category
- Construction Work
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 4 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Dec 9, 2025 9:35 AM
- Last updated
- Wed, Dec 10, 2025 5:36 AM
- Cleared
- Thu, Dec 11, 2025 6:00 AM
- Latest update: A1(M) NB Jct 14 to Jct 15 Lane 1 & HS Closure for Signs Erection MP12/1 to MP 12/7
- Coordinates
- 52.418176, -0.267670
- Latitude span
- 52.411712 – 52.423292
- Longitude span
- -0.268754 – -0.265963
- Bounding box centre
- 52.417502, -0.267359
- Location descriptions
-
- A1(M) northbound between J14 and J15
- Feed validity status
- Planned
- Overall feed start
- Wed, Dec 10, 2025 8:00 PM
- Overall feed end
- Thu, Dec 11, 2025 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
13 coordinate pairs- Description
- A1(M) northbound between J14 and J15
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {98E888B4-3DF6-4290-A74F-1FC9B1616460}
- Linear Element Type
- A Carriageway
- From Distance
- 2,923 m
- To Distance
- 4,171 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.411712 -0.265963 52.412684 -0.266249 52.413578 -0.266508 52.414244 -0.266706 52.414344 -0.266734 52.417307 -0.267597 52.418174 -0.267813 52.418842 -0.267993 52.419139 -0.268069 52.419969 -0.268243 52.421069 -0.268411 52.422691 -0.268659 52.422799 -0.268676
Segment 2
2 coordinate pairs- Description
- A1(M) northbound between J14 and J15
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {1BF8CB10-3010-4E86-9990-E7AEA938E3FC}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 55 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.422799 -0.268676 52.423292 -0.268754
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -0.265963, 52.411712
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.265963,
52.411712
],
[
-0.266249,
52.412684
],
[
-0.266508,
52.413578
],
[
-0.266706,
52.414244
],
[
-0.266734,
52.414344
],
[
-0.267597,
52.417307
],
[
-0.267813,
52.418174
],
[
-0.267993,
52.418842
],
[
-0.268069,
52.419139
],
[
-0.268243,
52.419969
],
[
-0.268411,
52.421069
],
[
-0.268659,
52.422691
],
[
-0.268676,
52.422799
],
[
-0.268676,
52.422799
],
[
-0.268754,
52.423292
]
]
]
}
View road section coordinates
[
[
[
-0.265963,
52.411712
],
[
-0.266249,
52.412684
],
[
-0.266508,
52.413578
],
[
-0.266706,
52.414244
],
[
-0.266734,
52.414344
],
[
-0.267597,
52.417307
],
[
-0.267813,
52.418174
],
[
-0.267993,
52.418842
],
[
-0.268069,
52.419139
],
[
-0.268243,
52.419969
],
[
-0.268411,
52.421069
],
[
-0.268659,
52.422691
],
[
-0.268676,
52.422799
],
[
-0.268676,
52.422799
],
[
-0.268754,
52.423292
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Tue, Dec 9, 2025 9:35 AM
- Record versioned
- Wed, Dec 10, 2025 5:36 AM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1(M) Southbound Jct 5 to Jct 4 lane 3,2 closure
Active Roadworks National HighwaysExpected to clear in 3 hours 55 minutes
A1(M) Southbound Jct 5 to Jct 4 lane 3,2 closure
A1m northbound Jct 42 to Jct 43 24/7 Lane 1 closure with 50mph speed restriction
Active Roadworks National HighwaysExpected to clear in 1 month 2 weeks
A1m northbound Jct 42 to Jct 43 24/7 Lane 1 closure with 50mph speed restriction
A1(M) Southbound Jct 6 to Jct 5 Lane 3,2 closure
Planned Roadworks National HighwaysStarts in 20 hours 25 minutes
A1(M) Southbound Jct 6 to Jct 5 Lane 3,2 closure
A14 eastbound Spaldwick to Thrapston lane 1 closure and splitter
Planned Roadworks National HighwaysStarts in 19 hours 25 minutes
A14 eastbound Spaldwick to Thrapston lane 1 closure and splitter
A1M southbound Jct 6 exit slip road - lane 1 closure
Planned Roadworks National HighwaysStarts in 19 hours 25 minutes
A1M southbound Jct 6 exit slip road - lane 1 closure
A1 eastbound New Ellington Roundabout to Brampton Hut Roundabout lane 2 closure
Planned Roadworks National HighwaysStarts in 19 hours 25 minutes
A1 eastbound New Ellington Roundabout to Brampton Hut Roundabout lane 2 closure