A1M Jct 62 Int. northbound entry slip road hard should closure
ClearedA1M Jct 62 Int. northbound entry slip road hard should closure
- Start time
- Tue, Apr 7, 2026 6:00 AM
- Expected end
- Tue, Apr 7, 2026 6:00 PM
- Duration
- 12 hours
- Road
- A1(M) – A1(M) J62 Northbound Access
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Apr 2, 2026 1:30 PM
- Last updated
- Tue, Apr 7, 2026 9:02 AM
- Cleared
- Tue, Apr 7, 2026 6:00 PM
- Latest update: A1M Jct 62 Int. northbound entry slip road hard should closure
- Coordinates
- 54.795718, -1.527778
- Latitude span
- 54.794336 – 54.798835
- Longitude span
- -1.529192 – -1.525486
- Bounding box centre
- 54.796586, -1.527339
- Location descriptions
-
- A1(M) J62 northbound access
- A1(M) northbound between J62 and J63
- Feed validity status
- Planned
- Overall feed start
- Tue, Apr 7, 2026 6:00 AM
- Overall feed end
- Tue, Apr 7, 2026 6:00 PM
- Feed window length
- 12 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
12 coordinate pairs- Description
- A1(M) J62 northbound access
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {84E46F9B-EA1F-4E6A-89DD-3AD43DB32E85}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 39 m
- To Distance
- 379 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.794336 -1.529192 54.794366 -1.529118 54.794428 -1.528962 54.794481 -1.528868 54.794544 -1.528759 54.794589 -1.528696 54.794678 -1.528586 54.794803 -1.528444 54.795224 -1.528113 54.796317 -1.527152 54.796586 -1.526915 54.796971 -1.5266
Segment 2
4 coordinate pairs- Description
- A1(M) northbound between J62 and J63
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {57361DA8-790F-4CA0-99FB-74D1CB6F64BA}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 219 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.796971 -1.5266 54.797078 -1.526536 54.797276 -1.526425 54.798835 -1.525486
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -1.529192, 54.794336
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.529192,
54.794336
],
[
-1.529118,
54.794366
],
[
-1.528962,
54.794428
],
[
-1.528868,
54.794481
],
[
-1.528759,
54.794544
],
[
-1.528696,
54.794589
],
[
-1.528586,
54.794678
],
[
-1.528444,
54.794803
],
[
-1.528113,
54.795224
],
[
-1.527152,
54.796317
],
[
-1.526915,
54.796586
],
[
-1.5266,
54.796971
],
[
-1.5266,
54.796971
],
[
-1.526536,
54.797078
],
[
-1.526425,
54.797276
],
[
-1.525486,
54.798835
]
]
]
}
View road section coordinates
[
[
[
-1.529192,
54.794336
],
[
-1.529118,
54.794366
],
[
-1.528962,
54.794428
],
[
-1.528868,
54.794481
],
[
-1.528759,
54.794544
],
[
-1.528696,
54.794589
],
[
-1.528586,
54.794678
],
[
-1.528444,
54.794803
],
[
-1.528113,
54.795224
],
[
-1.527152,
54.796317
],
[
-1.526915,
54.796586
],
[
-1.5266,
54.796971
],
[
-1.5266,
54.796971
],
[
-1.526536,
54.797078
],
[
-1.526425,
54.797276
],
[
-1.525486,
54.798835
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Apr 2, 2026 1:30 PM
- Record versioned
- Tue, Apr 7, 2026 9:02 AM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1M southbound Jct 45 to Jct 44 hard shoulder closure ( 60/0 59/4)
Planned Roadworks National HighwaysExpected to clear in 2 days 8 hours
A1M southbound Jct 45 to Jct 44 hard shoulder closure ( 60/0 59/4)
A1m northbound Jct 42 to Jct 43 24/7 Lane 1 closure with 50mph speed restriction
Active Roadworks National HighwaysExpected to clear in 1 month 2 weeks
A1m northbound Jct 42 to Jct 43 24/7 Lane 1 closure with 50mph speed restriction
A1(M) Southbound Jct 6 to Jct 5 Lane 3,2 closure
Planned Roadworks National HighwaysStarts in 13 hours 30 minutes
A1(M) Southbound Jct 6 to Jct 5 Lane 3,2 closure
A1T southbound redhouse to barnsadle lane 1 closure (286/7-24/5)
Planned Roadworks National HighwaysStarts in 12 hours 30 minutes
A1T southbound redhouse to barnsadle lane 1 closure (286/7-24/5)
A1M southbound Jct 6 exit slip road - lane 1 closure
Planned Roadworks National HighwaysStarts in 12 hours 30 minutes
A1M southbound Jct 6 exit slip road - lane 1 closure
A1M SB J48 to J46 closed
Planned Roadworks National HighwaysStarts in 11 hours 30 minutes
A1M SB J48 to J46 closed