A1M Jct 61 Northbound Exit Slip Road Mobile Hard Shoulder Closure
PlannedA1M Jct 61 Northbound Exit Slip Road Mobile Hard Shoulder Closure
- Start time
- Fri, Aug 14, 2026 7:00 AM
- Expected end
- Fri, Aug 14, 2026 3:30 PM
- Duration
- 8 hours 30 minutes
- Road
- A1(M) – A1(M) Northbound Between J60 And J61
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 2 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 17, 2026 10:02 AM
- Last updated
- Fri, Aug 14, 2026 2:15 AM
- Cleared
- Fri, Aug 14, 2026 3:30 PM
- Latest update: A1M Jct 61 Northbound Exit Slip Road Mobile Hard Shoulder Closure
- Coordinates
- 54.728108, -1.521800
- Latitude span
- 54.725317 – 54.729867
- Longitude span
- -1.522245 – -1.521484
- Bounding box centre
- 54.727592, -1.521865
- Location descriptions
-
- A1(M) northbound between J60 and J61
- A1(M) J61 northbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 14, 2026 7:00 AM
- Overall feed end
- Fri, Aug 14, 2026 3:30 PM
- Feed window length
- 8 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A1(M) northbound between J60 and J61
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {93E3B011-0836-4473-821D-881C27B80392}
- Linear Element Type
- A Carriageway
- From Distance
- 101 m
- To Distance
- 133 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.725317 -1.522245 54.725608 -1.522208
Segment 2
16 coordinate pairs- Description
- A1(M) J61 northbound exit
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {5468ED84-A7FA-4775-A9C1-D0B0744BB866}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 477 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.725608 -1.522208 54.727055 -1.522026 54.727136 -1.522011 54.727235 -1.521992 54.727352 -1.521976 54.727576 -1.521926 54.727873 -1.521892 54.728753 -1.521695 54.72913 -1.521597 54.729399 -1.521501 54.729471 -1.521485 54.729534 -1.521484 54.72957 -1.521484 54.72966 -1.521498 54.729795 -1.521559 54.729867 -1.521609
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- -1.522245, 54.725317
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.522245,
54.725317
],
[
-1.522208,
54.725608
],
[
-1.522208,
54.725608
],
[
-1.522026,
54.727055
],
[
-1.522011,
54.727136
],
[
-1.521992,
54.727235
],
[
-1.521976,
54.727352
],
[
-1.521926,
54.727576
],
[
-1.521892,
54.727873
],
[
-1.521695,
54.728753
],
[
-1.521597,
54.72913
],
[
-1.521501,
54.729399
],
[
-1.521485,
54.729471
],
[
-1.521484,
54.729534
],
[
-1.521484,
54.72957
],
[
-1.521498,
54.72966
],
[
-1.521559,
54.729795
],
[
-1.521609,
54.729867
]
]
]
}
View road section coordinates
[
[
[
-1.522245,
54.725317
],
[
-1.522208,
54.725608
],
[
-1.522208,
54.725608
],
[
-1.522026,
54.727055
],
[
-1.522011,
54.727136
],
[
-1.521992,
54.727235
],
[
-1.521976,
54.727352
],
[
-1.521926,
54.727576
],
[
-1.521892,
54.727873
],
[
-1.521695,
54.728753
],
[
-1.521597,
54.72913
],
[
-1.521501,
54.729399
],
[
-1.521485,
54.729471
],
[
-1.521484,
54.729534
],
[
-1.521484,
54.72957
],
[
-1.521498,
54.72966
],
[
-1.521559,
54.729795
],
[
-1.521609,
54.729867
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Jul 17, 2026 10:02 AM
- Record versioned
- Fri, Aug 14, 2026 2:15 AM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1(M) southbound Jct 38 to Jct 37 carriageway closure
Planned Roadworks National HighwaysStarts in 14 hours 37 minutes
A1(M) southbound Jct 38 to Jct 37 carriageway closure
A1M southbound Alconbury lane closure
Planned Roadworks National HighwaysStarts in 14 hours 37 minutes
A1M southbound Alconbury lane closure
A1M northbound Jct 42 to Jct 44 carriageway closure
Planned Roadworks National HighwaysStarts in 14 hours 7 minutes
A1M northbound Jct 42 to Jct 44 carriageway closure
A1M Jct 63 to Jct 62 Southbound Lane 1 Closure (2)
Planned Roadworks National HighwaysStarts in 13 hours 37 minutes
A1M Jct 63 to Jct 62 Southbound Lane 1 Closure (2)
A1M Jct 61 Southbound Entry Slip Road Mobile Hard Shoulder Closure
Planned Roadworks National HighwaysStarts in 1 hour 37 minutes
A1M Jct 61 Southbound Entry Slip Road Mobile Hard Shoulder Closure
A1(M) Northbound Jct Bignells Corner to Jct 3 Carriageway closure
Cleared Roadworks National HighwaysCleared 3 hours 32 minutes ago
A1(M) Northbound Jct Bignells Corner to Jct 3 Carriageway closure