A1(M) both directions Brampton to Yaxley mobile lane closure switching
ClearedA1(M) both directions Brampton to Yaxley mobile lane closure switching
- Start time
- Fri, Oct 30, 2026 9:00 PM
- Expected end
- Sat, Oct 31, 2026 5:00 AM
- Duration
- 8 hours
- Category
- Road Maintenance
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sat, Oct 31, 2026 12:19 AM
- Last updated
- Sat, Oct 31, 2026 4:42 AM
- Cleared
- Sat, Oct 31, 2026 5:00 AM
- Latest update: A1(M) both directions Brampton to Yaxley mobile lane closure switching
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 30, 2026 9:00 PM
- Overall feed end
- Sat, Oct 31, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Sat, Oct 31, 2026 12:19 AM
- Record versioned
- Sat, Oct 31, 2026 4:42 AM
Related incidents
A1089 Northbound Baker Street Interchange to A13 Westbound Baker Street Interchange link road closure
Planned Roadworks National HighwaysExpected to clear in 50 minutes 47 seconds
A1089 Northbound Baker Street Interchange to A13 Westbound Baker Street Interchange link road closure
M40 southbound Jct 12 to Jct 11 hard shoulder, lane 1 and lane 2 closure
Planned Roadworks National HighwaysExpected to clear in 50 minutes 47 seconds
M40 southbound Jct 12 to Jct 11 hard shoulder, lane 1 and lane 2 closure
M25 clockwise Jct 27 to Jct 28 lane 1,2 closure
Planned Roadworks National HighwaysExpected to clear in 20 minutes 47 seconds
M25 clockwise Jct 27 to Jct 28 lane 1,2 closure
Lanes 1 and 2 closure northbound
Active Roadworks National HighwaysExpected to clear in 50 minutes 47 seconds
Lanes 1 and 2 closure northbound
A46 southbound Stoneliegh to Kenilworth entry slip closure
Active Roadworks National HighwaysExpected to clear in 50 minutes 47 seconds
A46 southbound Stoneliegh to Kenilworth entry slip closure
A303 eastbound lane 2 closure (101/7 to 96/8)
Active Roadworks National HighwaysExpected to clear in 50 minutes 47 seconds
A303 eastbound lane 2 closure (101/7 to 96/8)