A1M Approaching Jct 58 Northbound 24hr Hard Shoulder Closure
PlannedA1M Approaching Jct 58 Northbound 24hr Hard Shoulder Closure
- Start time
- Wed, Nov 4, 2026 6:00 AM
- Expected end
- Wed, Nov 4, 2026 8:00 PM
- Duration
- 14 hours
- Road
- A1(M) – A1(M) Northbound Between J57 And J58
- Category
- Construction Work
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Nov 4, 2026 4:19 AM
- Last updated
- Wed, Nov 4, 2026 7:21 PM
- Cleared
- Wed, Nov 4, 2026 8:00 PM
- Latest update: A1M Approaching Jct 58 Northbound 24hr Hard Shoulder Closure
- Coordinates
- 54.548569, -1.601291
- Latitude span
- 54.539674 – 54.556409
- Longitude span
- -1.608511 – -1.594100
- Bounding box centre
- 54.548042, -1.601306
- Location descriptions
-
- A1(M) northbound between J57 and J58
- A1(M) northbound within J58
- Feed validity status
- Planned
- Overall feed start
- Wed, Nov 4, 2026 6:00 AM
- Overall feed end
- Wed, Nov 4, 2026 8:00 PM
- Feed window length
- 14 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- A1(M) northbound between J57 and J58
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {5CDD6D15-4EDC-44A1-A2F8-D882CD30F44A}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 707 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.547665 -1.602329 54.548435 -1.601595 54.549896 -1.60022 54.550585 -1.599564 54.551051 -1.599157 54.551311 -1.598907 54.551562 -1.598673 54.552028 -1.598205 54.553255 -1.59711
Segment 2
3 coordinate pairs- Description
- A1(M) northbound within J58
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {90B2E3AF-ABD2-4DC8-A608-0570630FBEB3}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 47 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.556032 -1.594454 54.556104 -1.594376 54.556409 -1.5941
Segment 3
3 coordinate pairs- Description
- A1(M) northbound between J57 and J58
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {873B2A60-E601-4207-A0F5-F74BF090823A}
- Linear Element Type
- A Carriageway
- From Distance
- 450 m
- To Distance
- 647 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.539674 -1.608511 54.540709 -1.607816 54.541321 -1.607405
Segment 4
14 coordinate pairs- Description
- A1(M) northbound between J57 and J58
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {F1169472-6E5A-4913-8009-1EFE97B4976E}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 779 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.541321 -1.607405 54.541355 -1.607383 54.542242 -1.606771 54.54313 -1.606175 54.543399 -1.606003 54.544233 -1.605438 54.544896 -1.604891 54.545138 -1.604687 54.545371 -1.604474 54.545855 -1.604031 54.546984 -1.602969 54.547315 -1.602657 54.547611 -1.602376 54.547665 -1.602329
Segment 5
6 coordinate pairs- Description
- A1(M) northbound within J58
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {D7772EA5-1119-4092-BAE6-468FE8620863}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 353 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.553255 -1.59711 54.553578 -1.596829 54.554434 -1.59597 54.554465 -1.595939 54.555593 -1.594876 54.556032 -1.594454
- Geometry type
- MultiLineString
- Geometry points
- 35
- First coordinate pair
- -1.602329, 54.547665
- Road section segments
- 1
- Road section points
- 35
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.602329,
54.547665
],
[
-1.601595,
54.548435
],
[
-1.60022,
54.549896
],
[
-1.599564,
54.550585
],
[
-1.599157,
54.551051
],
[
-1.598907,
54.551311
],
[
-1.598673,
54.551562
],
[
-1.598205,
54.552028
],
[
-1.59711,
54.553255
],
[
-1.594454,
54.556032
],
[
-1.594376,
54.556104
],
[
-1.5941,
54.556409
],
[
-1.608511,
54.539674
],
[
-1.607816,
54.540709
],
[
-1.607405,
54.541321
],
[
-1.607405,
54.541321
],
[
-1.607383,
54.541355
],
[
-1.606771,
54.542242
],
[
-1.606175,
54.54313
],
[
-1.606003,
54.543399
],
[
-1.605438,
54.544233
],
[
-1.604891,
54.544896
],
[
-1.604687,
54.545138
],
[
-1.604474,
54.545371
],
[
-1.604031,
54.545855
],
[
-1.602969,
54.546984
],
[
-1.602657,
54.547315
],
[
-1.602376,
54.547611
],
[
-1.602329,
54.547665
],
[
-1.59711,
54.553255
],
[
-1.596829,
54.553578
],
[
-1.59597,
54.554434
],
[
-1.595939,
54.554465
],
[
-1.594876,
54.555593
],
[
-1.594454,
54.556032
]
]
]
}
View road section coordinates
[
[
[
-1.602329,
54.547665
],
[
-1.601595,
54.548435
],
[
-1.60022,
54.549896
],
[
-1.599564,
54.550585
],
[
-1.599157,
54.551051
],
[
-1.598907,
54.551311
],
[
-1.598673,
54.551562
],
[
-1.598205,
54.552028
],
[
-1.59711,
54.553255
],
[
-1.594454,
54.556032
],
[
-1.594376,
54.556104
],
[
-1.5941,
54.556409
],
[
-1.608511,
54.539674
],
[
-1.607816,
54.540709
],
[
-1.607405,
54.541321
],
[
-1.607405,
54.541321
],
[
-1.607383,
54.541355
],
[
-1.606771,
54.542242
],
[
-1.606175,
54.54313
],
[
-1.606003,
54.543399
],
[
-1.605438,
54.544233
],
[
-1.604891,
54.544896
],
[
-1.604687,
54.545138
],
[
-1.604474,
54.545371
],
[
-1.604031,
54.545855
],
[
-1.602969,
54.546984
],
[
-1.602657,
54.547315
],
[
-1.602376,
54.547611
],
[
-1.602329,
54.547665
],
[
-1.59711,
54.553255
],
[
-1.596829,
54.553578
],
[
-1.59597,
54.554434
],
[
-1.595939,
54.554465
],
[
-1.594876,
54.555593
],
[
-1.594454,
54.556032
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Wed, Nov 4, 2026 4:19 AM
- Record versioned
- Wed, Nov 4, 2026 7:21 PM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1M southbound Jct 35 to Jct 34 hard shoulder closure (6/0 5/4)
Planned Roadworks National HighwaysExpected to clear in 49 minutes 1 second
A1M southbound Jct 35 to Jct 34 hard shoulder closure (6/0 5/4)
A1M Jct 61 Northbound Hard Shoulder Closure
Active Roadworks National HighwaysExpected to clear in 6 days 10 hours
A1M Jct 61 Northbound Hard Shoulder Closure
A1(M) Northbound Jct 4 to Jct 5 Lane 3,2 closure
Planned Roadworks National HighwaysStarts in 2 hours 19 minutes
A1(M) Northbound Jct 4 to Jct 5 Lane 3,2 closure
A1M Northbound Jct 3 to Jct 4 carriageway and slip road closure
Planned Roadworks National HighwaysStarts in 2 hours 19 minutes
A1M Northbound Jct 3 to Jct 4 carriageway and slip road closure
A1(M) northbound Jct 6 hard shoulder closure and lane 1 closure (MP 40/7 to 41/9)
Planned Roadworks National HighwaysStarts in 1 hour 19 minutes
A1(M) northbound Jct 6 hard shoulder closure and lane 1 closure (MP 40/7 to 41/9)
A1M southbound Jct 35 to Jct 34 lane 1 closure (6/0 5/4)
Planned Roadworks National HighwaysStarts in 49 minutes 1 second
A1M southbound Jct 35 to Jct 34 lane 1 closure (6/0 5/4)