A19/A139 Norton Interchange southbound entry slip road lane 2 closure
ClearedA19/A139 Norton Interchange southbound entry slip road lane 2 closure
- Start time
- Thu, Mar 19, 2026 9:30 AM
- Expected end
- Thu, Mar 19, 2026 3:00 PM
- Duration
- 5 hours 30 minutes
- Road
- A19 – A19 Southbound Access From A139
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Mar 18, 2026 8:46 AM
- Last updated
- Thu, Mar 19, 2026 9:27 AM
- Cleared
- Thu, Mar 19, 2026 3:00 PM
- Latest update: A19/A139 Norton Interchange southbound entry slip road lane 2 closure
- Coordinates
- 54.588894, -1.299595
- Latitude span
- 54.584425 – 54.592049
- Longitude span
- -1.300906 – -1.297106
- Bounding box centre
- 54.588237, -1.299006
- Location descriptions
-
- A19 southbound access from A139
- A19 southbound between A139 and A1046
- Feed validity status
- Planned
- Overall feed start
- Thu, Mar 19, 2026 9:30 AM
- Overall feed end
- Thu, Mar 19, 2026 3:00 PM
- Feed window length
- 5 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
21 coordinate pairs- Description
- A19 southbound access from A139
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A19
- Linear Element Model
- The Network Model
- Linear Element Id
- {9C4B55B4-32C5-4F2D-8ABE-5CA1809B27C6}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 11 m
- To Distance
- 535 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.592049 -1.297106 54.591973 -1.297209 54.591824 -1.297414 54.591575 -1.297753 54.591336 -1.298124 54.591097 -1.298445 54.590821 -1.298905 54.590461 -1.299522 54.590341 -1.299712 54.59025 -1.299853 54.590017 -1.30015 54.589822 -1.300349 54.589807 -1.300361 54.589547 -1.300575 54.589531 -1.300589 54.589484 -1.30062 54.589313 -1.300734 54.589206 -1.300776 54.589078 -1.300826 54.588773 -1.300906 54.588095 -1.300888
Segment 2
10 coordinate pairs- Description
- A19 southbound between A139 and A1046
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A19
- Linear Element Model
- The Network Model
- Linear Element Id
- {766057E3-90E8-42B0-B97B-3A9A2805E8F8}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 448 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.588095 -1.300888 54.587563 -1.300691 54.587087 -1.300472 54.586495 -1.300075 54.586401 -1.300003 54.585753 -1.299507 54.585725 -1.299481 54.585197 -1.299004 54.58458 -1.298344 54.584425 -1.298147
- Geometry type
- MultiLineString
- Geometry points
- 31
- First coordinate pair
- -1.297106, 54.592049
- Road section segments
- 1
- Road section points
- 31
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.297106,
54.592049
],
[
-1.297209,
54.591973
],
[
-1.297414,
54.591824
],
[
-1.297753,
54.591575
],
[
-1.298124,
54.591336
],
[
-1.298445,
54.591097
],
[
-1.298905,
54.590821
],
[
-1.299522,
54.590461
],
[
-1.299712,
54.590341
],
[
-1.299853,
54.59025
],
[
-1.30015,
54.590017
],
[
-1.300349,
54.589822
],
[
-1.300361,
54.589807
],
[
-1.300575,
54.589547
],
[
-1.300589,
54.589531
],
[
-1.30062,
54.589484
],
[
-1.300734,
54.589313
],
[
-1.300776,
54.589206
],
[
-1.300826,
54.589078
],
[
-1.300906,
54.588773
],
[
-1.300888,
54.588095
],
[
-1.300888,
54.588095
],
[
-1.300691,
54.587563
],
[
-1.300472,
54.587087
],
[
-1.300075,
54.586495
],
[
-1.300003,
54.586401
],
[
-1.299507,
54.585753
],
[
-1.299481,
54.585725
],
[
-1.299004,
54.585197
],
[
-1.298344,
54.58458
],
[
-1.298147,
54.584425
]
]
]
}
View road section coordinates
[
[
[
-1.297106,
54.592049
],
[
-1.297209,
54.591973
],
[
-1.297414,
54.591824
],
[
-1.297753,
54.591575
],
[
-1.298124,
54.591336
],
[
-1.298445,
54.591097
],
[
-1.298905,
54.590821
],
[
-1.299522,
54.590461
],
[
-1.299712,
54.590341
],
[
-1.299853,
54.59025
],
[
-1.30015,
54.590017
],
[
-1.300349,
54.589822
],
[
-1.300361,
54.589807
],
[
-1.300575,
54.589547
],
[
-1.300589,
54.589531
],
[
-1.30062,
54.589484
],
[
-1.300734,
54.589313
],
[
-1.300776,
54.589206
],
[
-1.300826,
54.589078
],
[
-1.300906,
54.588773
],
[
-1.300888,
54.588095
],
[
-1.300888,
54.588095
],
[
-1.300691,
54.587563
],
[
-1.300472,
54.587087
],
[
-1.300075,
54.586495
],
[
-1.300003,
54.586401
],
[
-1.299507,
54.585753
],
[
-1.299481,
54.585725
],
[
-1.299004,
54.585197
],
[
-1.298344,
54.58458
],
[
-1.298147,
54.584425
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Mar 18, 2026 8:46 AM
- Record versioned
- Thu, Mar 19, 2026 9:27 AM
- Coordinate source
- Geometry
Driving on the A19? See every live closure, roadwork and planned restriction on this road.
A19 live closuresRelated incidents
A19 southbound Exelby Services to A172 Tontine Interchange lane 1 closure
Planned Roadworks National HighwaysStarts in 15 hours 33 minutes
A19 southbound Exelby Services to A172 Tontine Interchange lane 1 closure
A19 northbound A61 South Kilvington to A684 Osmotherley Interchange carriageway closure including slip roads
Planned Roadworks National HighwaysStarts in 15 hours 33 minutes
A19 northbound A61 South Kilvington to A684 Osmotherley Interchange carriageway closure including slip roads
A19 Redhill Overbridge northbound lane 2 closure
Planned Roadworks National HighwaysStarts in 15 hours 33 minutes
A19 Redhill Overbridge northbound lane 2 closure
A19 southbound Castle Eden to A179 Sheraton Interchange lane 1 closure including slip roads
Planned Roadworks National HighwaysStarts in 15 hours 33 minutes
A19 southbound Castle Eden to A179 Sheraton Interchange lane 1 closure including slip roads
A19 northbound A66 Stockton Road to A1046 Portrack Interchange including exit and entry slip roads carriageway closure
Planned Roadworks National HighwaysStarts in 15 hours 33 minutes
A19 northbound A66 Stockton Road to A1046 Portrack Interchange including exit and entry slip roads carriageway closure
A19/A181 Wellfield Interchange southbound exit slip road closure
Cleared Roadworks National HighwaysCleared 3 hours 46 minutes ago
A19/A181 Wellfield Interchange southbound exit slip road closure