A19 Seaton Burn eastbound lane 1 closure
PlannedA19 Seaton Burn eastbound lane 1 closure
- Start time
- Thu, Nov 5, 2026 8:00 PM
- Expected end
- Fri, Nov 6, 2026 6:00 AM
- Duration
- 10 hours
- Road
- A1 – Link Road From A1 Northbound To A19 Southbound
- Category
- Authority Operation
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected, 1 of 2 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 23, 2026 3:30 PM
- Last updated
- Thu, Nov 5, 2026 10:45 AM
- Cleared
- Fri, Nov 6, 2026 6:00 AM
- Latest update: A19 Seaton Burn eastbound lane 1 closure
- Coordinates
- 55.064912, -1.634540
- Latitude span
- 55.064685 – 55.065061
- Longitude span
- -1.636109 – -1.633656
- Bounding box centre
- 55.064873, -1.634883
- Location descriptions
-
- link road from A1 northbound to A19 southbound
- A19 southbound between A1 and A1068
- Feed validity status
- Planned
- Overall feed start
- Thu, Nov 5, 2026 8:00 PM
- Overall feed end
- Fri, Nov 6, 2026 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- link road from A1 northbound to A19 southbound
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A1
- Linear Element Model
- The Network Model
- Linear Element Id
- {97BB35CE-434E-488C-AAC1-3FE9F7EEE0A1}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 75 m
- To Distance
- 170 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
55.064685 -1.636109 55.064819 -1.635147 55.064891 -1.634666
Segment 2
4 coordinate pairs- Description
- A19 southbound between A1 and A1068
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1
- Linear Element Model
- The Network Model
- Linear Element Id
- {0523D525-E462-47CA-87D1-0F8B2C536633}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 67 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
55.064891 -1.634666 55.065002 -1.633821 55.065036 -1.633712 55.065061 -1.633656
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.636109, 55.064685
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.636109,
55.064685
],
[
-1.635147,
55.064819
],
[
-1.634666,
55.064891
],
[
-1.634666,
55.064891
],
[
-1.633821,
55.065002
],
[
-1.633712,
55.065036
],
[
-1.633656,
55.065061
]
]
]
}
View road section coordinates
[
[
[
-1.636109,
55.064685
],
[
-1.635147,
55.064819
],
[
-1.634666,
55.064891
],
[
-1.634666,
55.064891
],
[
-1.633821,
55.065002
],
[
-1.633712,
55.065036
],
[
-1.633656,
55.065061
]
]
]
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Oct 23, 2026 3:30 PM
- Record versioned
- Thu, Nov 5, 2026 10:45 AM
- Coordinate source
- Geometry
Driving on the A1? See every live closure, roadwork and planned restriction on this road.
A1 live closuresRelated incidents
A1 northbound Buckden Roundabout to A14 merge carriageway closure
Planned Roadworks National HighwaysStarts in 9 hours 5 minutes
A1 northbound Buckden Roundabout to A14 merge carriageway closure
A1 southbound Biggleswade South Roundabout to Edworth lane 2 closure (MP 70/0 to 67/3)
Planned Roadworks National HighwaysStarts in 9 hours 5 minutes
A1 southbound Biggleswade South Roundabout to Edworth lane 2 closure (MP 70/0 to 67/3)
A1 southbound Biggleswade South Roundabout to Edworth lane 2 closure (MP 70/0 to 67/3)
Planned Roadworks National HighwaysStarts in 9 hours 5 minutes
A1 southbound Biggleswade South Roundabout to Edworth lane 2 closure (MP 70/0 to 67/3)
A1 Alnwick southbound exit slip road closure
Planned Roadworks National HighwaysStarts in 8 hours 5 minutes
A1 Alnwick southbound exit slip road closure
A1 Denwick southbound lane 2 closure
Planned Roadworks National HighwaysStarts in 8 hours 5 minutes
A1 Denwick southbound lane 2 closure
A1 Marshall Meadows to Highfields southbound lane closure with switching and traffic signals (4)
Planned Roadworks National HighwaysStarts in 8 hours 5 minutes
A1 Marshall Meadows to Highfields southbound lane closure with switching and traffic signals (4)