A19 northbound Easington to A182 Cold Hesledon Interchange lane 2 closure
ClearedA19 northbound Easington to A182 Cold Hesledon Interchange lane 2 closure
- Start time
- Fri, Jun 26, 2026 7:00 PM
- Expected end
- Sat, Jun 27, 2026 5:00 AM
- Duration
- 3 hours 50 minutes 1 second
- Road
- A19 – A19 Northbound Between A182 Near Easington And A182 Near Murton
- Category
- Construction Work
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jun 18, 2026 6:16 AM
- Last updated
- Fri, Jun 26, 2026 8:51 PM
- Cleared
- Fri, Jun 26, 2026 10:50 PM
- Latest update: A19 northbound Easington to A182 Cold Hesledon Interchange lane 2 closure
- Coordinates
- 54.796335, -1.363703
- Latitude span
- 54.791576 – 54.801575
- Longitude span
- -1.366103 – -1.360655
- Bounding box centre
- 54.796576, -1.363379
- Location descriptions
-
- A19 northbound between A182 near Easington and A182 near Murton
- Feed validity status
- Planned
- Overall feed start
- Fri, Jun 26, 2026 7:00 PM
- Overall feed end
- Sat, Jun 27, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
14 coordinate pairs- Description
- A19 northbound between A182 near Easington and A182 near Murton
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A19
- Linear Element Model
- The Network Model
- Linear Element Id
- {AD4104B6-0E9F-4E61-89B7-5291624BB2AA}
- Linear Element Type
- A Carriageway
- From Distance
- 259 m
- To Distance
- 1,353 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.791576 -1.366103 54.791979 -1.366007 54.792813 -1.365714 54.793037 -1.365617 54.793584 -1.365391 54.793853 -1.365247 54.794641 -1.364779 54.795063 -1.364544 54.795633 -1.364209 54.79668 -1.363565 54.797292 -1.3632 54.798216 -1.362659 54.798834 -1.362291 54.800939 -1.361013
Segment 2
3 coordinate pairs- Description
- A19 northbound between A182 near Easington and A182 near Murton
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A19
- Linear Element Model
- The Network Model
- Linear Element Id
- {12FF02A4-3697-4C27-9C7A-A3D3D2C913E3}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 74 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.800939 -1.361013 54.801038 -1.36095 54.801575 -1.360655
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- -1.366103, 54.791576
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.366103,
54.791576
],
[
-1.366007,
54.791979
],
[
-1.365714,
54.792813
],
[
-1.365617,
54.793037
],
[
-1.365391,
54.793584
],
[
-1.365247,
54.793853
],
[
-1.364779,
54.794641
],
[
-1.364544,
54.795063
],
[
-1.364209,
54.795633
],
[
-1.363565,
54.79668
],
[
-1.3632,
54.797292
],
[
-1.362659,
54.798216
],
[
-1.362291,
54.798834
],
[
-1.361013,
54.800939
],
[
-1.361013,
54.800939
],
[
-1.36095,
54.801038
],
[
-1.360655,
54.801575
]
]
]
}
View road section coordinates
[
[
[
-1.366103,
54.791576
],
[
-1.366007,
54.791979
],
[
-1.365714,
54.792813
],
[
-1.365617,
54.793037
],
[
-1.365391,
54.793584
],
[
-1.365247,
54.793853
],
[
-1.364779,
54.794641
],
[
-1.364544,
54.795063
],
[
-1.364209,
54.795633
],
[
-1.363565,
54.79668
],
[
-1.3632,
54.797292
],
[
-1.362659,
54.798216
],
[
-1.362291,
54.798834
],
[
-1.361013,
54.800939
],
[
-1.361013,
54.800939
],
[
-1.36095,
54.801038
],
[
-1.360655,
54.801575
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Murton
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 5
- Record created
- Thu, Jun 18, 2026 6:16 AM
- Record versioned
- Fri, Jun 26, 2026 8:51 PM
- Coordinate source
- Geometry
Driving on the A19? See every live closure, roadwork and planned restriction on this road.
A19 live closuresRelated incidents
A19 Northbound At Headworth Slip Road Closure.
Planned Roadworks National HighwaysStarts in 4 hours 16 minutes
A19 Northbound At Headworth Slip Road Closure.
A19 northbound A61 South Kilvington to A684 Osmotherley Interchange carriageway closure including slip roads
Planned Roadworks National HighwaysStarts in 4 hours 16 minutes
A19 northbound A61 South Kilvington to A684 Osmotherley Interchange carriageway closure including slip roads
A19 northbound A66 Stockton Road to A1046 Portrack Interchange including exit and entry slip roads carriageway closure
Planned Roadworks National HighwaysStarts in 4 hours 16 minutes
A19 northbound A66 Stockton Road to A1046 Portrack Interchange including exit and entry slip roads carriageway closure
A19 Holystone Int Southbound Exit Slip Road Lane 1 Closure
Planned Roadworks National HighwaysStarts in 4 hours 16 minutes
A19 Holystone Int Southbound Exit Slip Road Lane 1 Closure
A19 southbound Castle Eden to A179 Sheraton Interchange lane 1 closure including slip roads
Planned Roadworks National HighwaysStarts in 4 hours 16 minutes
A19 southbound Castle Eden to A179 Sheraton Interchange lane 1 closure including slip roads
A19 Redhill Overbridge northbound lane 2 closure
Planned Roadworks National HighwaysStarts in 4 hours 16 minutes
A19 Redhill Overbridge northbound lane 2 closure