A160 eastbound Brocklesby interchange exit slip road closure
ClearedA160 eastbound Brocklesby interchange exit slip road closure
- Start time
- Thu, Nov 6, 2025 9:00 PM
- Expected end
- Fri, Nov 7, 2025 6:00 AM
- Duration
- 9 hours
- Road
- A180 – A180 Eastbound Exit For A160
- Category
- Construction Work
- Direction
- Eastbound
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Nov 6, 2025 5:02 AM
- Last updated
- Thu, Nov 6, 2025 2:14 PM
- Cleared
- Fri, Nov 7, 2025 6:00 AM
- Latest update: A160 eastbound Brocklesby interchange exit slip road closure
- Coordinates
- 53.614602, -0.286707
- Latitude span
- 53.614542 – 53.614695
- Longitude span
- -0.288063 – -0.284859
- Bounding box centre
- 53.614619, -0.286461
- Location descriptions
-
- A180 eastbound exit for A160
- Feed validity status
- Planned
- Overall feed start
- Thu, Nov 6, 2025 9:00 PM
- Overall feed end
- Fri, Nov 7, 2025 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A180 eastbound exit for A160
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A180
- Linear Element Model
- The Network Model
- Linear Element Id
- {E504D944-A05B-4897-8A86-37035C17DAAA}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 26 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.614542 -0.288063 53.614558 -0.287665
Segment 2
3 coordinate pairs- Description
- A180 eastbound exit for A160
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A180
- Linear Element Model
- The Network Model
- Linear Element Id
- {6FD261D4-0D6F-4D08-B242-AC300689FB84}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 186 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.614558 -0.287665 53.614657 -0.285281 53.614695 -0.284859
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -0.288063, 53.614542
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.288063,
53.614542
],
[
-0.287665,
53.614558
],
[
-0.287665,
53.614558
],
[
-0.285281,
53.614657
],
[
-0.284859,
53.614695
]
]
]
}
View road section coordinates
[
[
[
-0.288063,
53.614542
],
[
-0.287665,
53.614558
],
[
-0.287665,
53.614558
],
[
-0.285281,
53.614657
],
[
-0.284859,
53.614695
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Nov 6, 2025 5:02 AM
- Record versioned
- Thu, Nov 6, 2025 2:14 PM
- Coordinate source
- Geometry
Driving on the A180? See every live closure, roadwork and planned restriction on this road.
A180 live closuresRelated incidents
M180 eastbound Jct 3 to Jct 4 Lane 2 and 3 closure (17/1 - 19/8)
Cleared Roadworks National HighwaysCleared 4 days 6 hours ago
M180 eastbound Jct 3 to Jct 4 Lane 2 and 3 closure (17/1 - 19/8)
M181 southbound to M180 eastbound Jct 3, carriageway closure
Cleared Roadworks National HighwaysCleared 4 days 6 hours ago
M181 southbound to M180 eastbound Jct 3, carriageway closure
M180 eastbound Jct 3 to Jct 4 Lane 2 closure (21/6 - 22/2)
Cleared Roadworks National HighwaysCleared 4 days 16 hours ago
M180 eastbound Jct 3 to Jct 4 Lane 2 closure (21/6 - 22/2)
M181 southbound to M180 eastbound Jct 3, carriageway closure
Cleared Roadworks National HighwaysCleared 5 days 6 hours ago
M181 southbound to M180 eastbound Jct 3, carriageway closure
M180 eastbound Jct 3 to Jct 4 Lane 2 and 3 closure (17/1 - 19/8)
Cleared Roadworks National HighwaysCleared 5 days 6 hours ago
M180 eastbound Jct 3 to Jct 4 Lane 2 and 3 closure (17/1 - 19/8)
A160 eastbound Town street to Eastfield Lane 2 closure
Cleared Roadworks National HighwaysCleared 1 week 1 day ago
A160 eastbound Town street to Eastfield Lane 2 closure