A14 westbound lay-by closure

Cleared

A14 westbound lay-by closure

Start time
Fri, Jul 3, 2026 12:00 PM
Expected end
Sat, Jul 4, 2026 5:00 AM
Duration
16 hours 50 minutes 2 seconds
Road
A14 – A14 Westbound Between J6 And J4
Category
Road Maintenance
Direction
Westbound
Carriageway
Dual Carriageway
Reason
Tree And Vegetation Cutting Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Mon, Jun 1, 2026 1:58 PM
Last updated
Sat, Jul 4, 2026 4:24 AM
Cleared
Sat, Jul 4, 2026 4:50 AM
  • Latest update: A14 westbound lay-by closure
Coordinates
52.412805, -0.782566
Latitude span
52.412761 – 52.412915
Longitude span
-0.784304 – -0.780317
Bounding box centre
52.412838, -0.782311
Location descriptions
  • A14 westbound between J6 and J4
Feed validity status
Planned
Overall feed start
Fri, Jul 3, 2026 12:00 PM
Overall feed end
Sat, Jul 4, 2026 5:00 AM
Feed window length
17 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
A14 westbound between J6 and J4
Carriageway
Dual Carriageway
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
West Bound
Direction Relative
Aligned
Height Grade
Start1 End2
Linear Element Road
A14
Linear Element Model
The Network Model
Linear Element Id
{7A67DB1C-FB86-442E-B0B4-515AC8C28A05}
Linear Element Type
B Carriageway
From Distance
0 m
To Distance
11 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.412812 -0.784131
52.412828 -0.784304

Segment 2

8 coordinate pairs
Description
A14 westbound between J6 and J4
Carriageway
Dual Carriageway
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
West Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A14
Linear Element Model
The Network Model
Linear Element Id
{601C050C-6221-48F3-BFF2-72D8DA1BFAFA}
Linear Element Type
B Carriageway
From Distance
0 m
To Distance
184 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.412811 -0.781426
52.412796 -0.781662
52.412781 -0.781986
52.412761 -0.782677
52.412766 -0.783133
52.412768 -0.783324
52.41278 -0.783691
52.412812 -0.784131

Segment 3

3 coordinate pairs
Description
A14 westbound between J6 and J4
Carriageway
Dual Carriageway
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
West Bound
Direction Relative
Aligned
Height Grade
Start2 End1
Linear Element Road
A14
Linear Element Model
The Network Model
Linear Element Id
{186A8258-979A-4F05-B2EC-52FA5E162911}
Linear Element Type
B Carriageway
From Distance
1,000 m
To Distance
1,076 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.412915 -0.780317
52.412826 -0.781146
52.412811 -0.781426
Geometry type
MultiLineString
Geometry points
13
First coordinate pair
-0.784131, 52.412812
Road section segments
1
Road section points
13
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.784131,
                52.412812
            ],
            [
                -0.784304,
                52.412828
            ],
            [
                -0.781426,
                52.412811
            ],
            [
                -0.781662,
                52.412796
            ],
            [
                -0.781986,
                52.412781
            ],
            [
                -0.782677,
                52.412761
            ],
            [
                -0.783133,
                52.412766
            ],
            [
                -0.783324,
                52.412768
            ],
            [
                -0.783691,
                52.41278
            ],
            [
                -0.784131,
                52.412812
            ],
            [
                -0.780317,
                52.412915
            ],
            [
                -0.781146,
                52.412826
            ],
            [
                -0.781426,
                52.412811
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.784131,
            52.412812
        ],
        [
            -0.784304,
            52.412828
        ],
        [
            -0.781426,
            52.412811
        ],
        [
            -0.781662,
            52.412796
        ],
        [
            -0.781986,
            52.412781
        ],
        [
            -0.782677,
            52.412761
        ],
        [
            -0.783133,
            52.412766
        ],
        [
            -0.783324,
            52.412768
        ],
        [
            -0.783691,
            52.41278
        ],
        [
            -0.784131,
            52.412812
        ],
        [
            -0.780317,
            52.412915
        ],
        [
            -0.781146,
            52.412826
        ],
        [
            -0.781426,
            52.412811
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Mon, Jun 1, 2026 1:58 PM
Record versioned
Sat, Jul 4, 2026 4:24 AM
Coordinate source
Geometry

Driving on the A14? See every live closure, roadwork and planned restriction on this road.

A14 live closures

Related incidents

A14 eastbound approach to New Ellington lane closure

Planned Roadworks National Highways
Huntingdonshire A14 · A14 Eastbound Between J20 And J21

Starts in 4 hours 21 minutes

Starts 7 Jul 2026, 20:00 Expected clear 8 Jul 2026, 04:00

A14 eastbound approach to New Ellington lane closure

Category: Road Maintenance
View update

A14 eastbound Jct 44 to Jct 46 lane closure (MP 147/8 to 152/4)

Planned Roadworks National Highways
Bury St Edmunds A14 · A14 Eastbound Between J44 And J45

Starts in 4 hours 21 minutes

Starts 7 Jul 2026, 20:00 Expected clear 8 Jul 2026, 04:00

A14 eastbound Jct 44 to Jct 46 lane closure (MP 147/8 to 152/4)

Category: Road Maintenance
View update

A14 eastbound Jct 23 entry slip road closure

Planned Roadworks National Highways
South Cambridgeshire A14 · A14 Eastbound Service Road Access

Starts in 3 hours 21 minutes

Starts 7 Jul 2026, 19:00 Expected clear 8 Jul 2026, 05:00

A14 eastbound Jct 23 entry slip road closure

Category: Road Maintenance
View update

A14 eastbound Jct 23 to Jct 24 lane 1,2 closures (MP 76/8A to 81/1)

Planned Roadworks National Highways
South Cambridgeshire A14 · A14 Eastbound Between J23 And J24B

Starts in 3 hours 21 minutes

Starts 7 Jul 2026, 19:00 Expected clear 8 Jul 2026, 05:00

A14 eastbound Jct 23 to Jct 24 lane 1,2 closures (MP 76/8A to 81/1)

Category: Road Maintenance
View update

A14 eastbound Jct 36 lane 1 closure (MP 113/6 to 114/7)

Planned Roadworks National Highways
East Cambridgeshire A14 · A14 Eastbound Between J36 And J37

Starts in 3 hours 21 minutes

Starts 7 Jul 2026, 19:00 Expected clear 8 Jul 2026, 05:00

A14 eastbound Jct 36 lane 1 closure (MP 113/6 to 114/7)

Category: Road Maintenance
View update

A14 eastbound Jct 7 exit slip road closure

Planned Roadworks National Highways
Kettering A14 · A14 J7 Eastbound Exit

Starts in 3 hours 21 minutes

Starts 7 Jul 2026, 19:00 Expected clear 8 Jul 2026, 05:00

A14 eastbound Jct 7 exit slip road closure

Category: Road Maintenance
View update