A14 westbound Jct 9 dedicated left turn lane closure
ClearedA14 westbound Jct 9 dedicated left turn lane closure
- Start time
- Thu, Nov 26, 2026 8:30 PM
- Expected end
- Fri, Nov 27, 2026 5:30 AM
- Duration
- 6 hours 10 minutes 2 seconds
- Road
- A14 – Fast Slip From A14 J9 To A509 Southbound
- Category
- Construction Work
- Direction
- Southbound
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Nov 5, 2026 1:22 PM
- Last updated
- Fri, Nov 27, 2026 2:18 AM
- Cleared
- Fri, Nov 27, 2026 2:40 AM
- Latest update: A14 westbound Jct 9 dedicated left turn lane closure
- Coordinates
- 52.371510, -0.713156
- Latitude span
- 52.371269 – 52.371674
- Longitude span
- -0.713516 – -0.712008
- Bounding box centre
- 52.371472, -0.712762
- Location descriptions
-
- fast slip from A14 J9 to A509 southbound
- A14 J9 westbound exit
- Feed validity status
- Planned
- Overall feed start
- Thu, Nov 26, 2026 8:30 PM
- Overall feed end
- Fri, Nov 27, 2026 5:30 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- fast slip from A14 J9 to A509 southbound
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {8BBC786A-0F66-4010-80DA-B3AE88C66F62}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 72 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.371642 -0.712786 52.371576 -0.713213 52.371568 -0.713258 52.371542 -0.713332 52.37151 -0.713386 52.371471 -0.713437 52.371399 -0.713483 52.371319 -0.713515 52.371269 -0.713516
Segment 2
2 coordinate pairs- Description
- A14 J9 westbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {F5B82F81-3DB0-4F2F-9089-F66428E2DB0B}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 318 m
- To Distance
- 372 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.371674 -0.712008 52.371642 -0.712786
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- -0.712786, 52.371642
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.712786,
52.371642
],
[
-0.713213,
52.371576
],
[
-0.713258,
52.371568
],
[
-0.713332,
52.371542
],
[
-0.713386,
52.37151
],
[
-0.713437,
52.371471
],
[
-0.713483,
52.371399
],
[
-0.713515,
52.371319
],
[
-0.713516,
52.371269
],
[
-0.712008,
52.371674
],
[
-0.712786,
52.371642
]
]
]
}
View road section coordinates
[
[
[
-0.712786,
52.371642
],
[
-0.713213,
52.371576
],
[
-0.713258,
52.371568
],
[
-0.713332,
52.371542
],
[
-0.713386,
52.37151
],
[
-0.713437,
52.371471
],
[
-0.713483,
52.371399
],
[
-0.713515,
52.371319
],
[
-0.713516,
52.371269
],
[
-0.712008,
52.371674
],
[
-0.712786,
52.371642
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Nov 5, 2026 1:22 PM
- Record versioned
- Fri, Nov 27, 2026 2:18 AM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 both directions Jct 32 to Jct 33 lane 3 back-to-back closure
Planned Roadworks National HighwaysStarts in 44 minutes 14 seconds
A14 both directions Jct 32 to Jct 33 lane 3 back-to-back closure
A14 westbound Jct 33 entry slip carriageway closure
Cleared Roadworks National HighwaysCleared 22 hours 15 minutes ago
A14 westbound Jct 33 entry slip carriageway closure
A14 eastbound Jct 51 to Jct 52 lane 1 closure (MP 179/2 to 180/8)
Cleared Roadworks National HighwaysCleared 14 hours 15 minutes ago
A14 eastbound Jct 51 to Jct 52 lane 1 closure (MP 179/2 to 180/8)
A14 both directions Jct 32 to Jct 33 lane 3 back-to-back closure
Cleared Roadworks National HighwaysCleared 19 hours 15 minutes ago
A14 both directions Jct 32 to Jct 33 lane 3 back-to-back closure
A14 westbound Jct 9 dedicated left turn lane closure
Cleared Roadworks National HighwaysCleared 1 day 20 hours ago
A14 westbound Jct 9 dedicated left turn lane closure
A14 eastbound Jct 45 to Jct 51 carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 18 hours ago
A14 eastbound Jct 45 to Jct 51 carriageway closure