A14 westbound Jct 62 to Jct 43 mobile lane closures (MP 210/6 to 144/4)
ClearedA14 westbound Jct 62 to Jct 43 mobile lane closures (MP 210/6 to 144/4)
- Start time
- Fri, Jul 10, 2026 7:00 PM
- Expected end
- Sat, Jul 11, 2026 4:00 AM
- Duration
- 9 hours
- Road
- A14 – A14 Westbound Between J54 And J53
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Apr 29, 2026 8:04 AM
- Last updated
- Sat, Jul 11, 2026 3:52 AM
- Cleared
- Sat, Jul 11, 2026 4:00 AM
- Latest update: A14 westbound Jct 62 to Jct 43 mobile lane closures (MP 210/6 to 144/4)
- Coordinates
- 52.090147, 1.115169
- Latitude span
- 52.086551 – 52.094420
- Longitude span
- 1.112710 – 1.116257
- Bounding box centre
- 52.090486, 1.114484
- Location descriptions
-
- A14 westbound between J54 and J53
- A14 westbound between J53 and J52
- A14 westbound within J53
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 10, 2026 7:00 PM
- Overall feed end
- Sat, Jul 11, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A14 westbound between J54 and J53
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {CF1168A7-1E31-4D88-84E9-96736D7C1F08}
- Linear Element Type
- B Carriageway
- From Distance
- 2 m
- To Distance
- 53 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.086551 1.11271 52.086946 1.113096
Segment 2
14 coordinate pairs- Description
- A14 westbound between J53 and J52
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {9847A84A-58B1-408D-9E65-0484D89C6718}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 386 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.09097 1.116048 52.09122 1.116095 52.091381 1.116127 52.091551 1.116162 52.091954 1.116219 52.092215 1.116237 52.092502 1.116257 52.092763 1.116246 52.093006 1.116234 52.093295 1.116196 52.093394 1.116188 52.093729 1.116109 52.094146 1.115992 52.09442 1.115895
Segment 3
19 coordinate pairs- Description
- A14 westbound within J53
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {EA580560-988E-4B7E-A679-6AD762FB7AEE}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 498 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.086946 1.113096 52.087006 1.113217 52.087041 1.113278 52.087084 1.113325 52.087303 1.113573 52.087311 1.113583 52.087793 1.114089 52.088099 1.114388 52.088468 1.11472 52.088856 1.115025 52.089041 1.115169 52.089156 1.115236 52.08972 1.115596 52.089762 1.11562 52.089776 1.115626 52.090037 1.11575 52.0903 1.11587 52.090443 1.115909 52.09097 1.116048
- Geometry type
- MultiLineString
- Geometry points
- 35
- First coordinate pair
- 1.112710, 52.086551
- Road section segments
- 1
- Road section points
- 35
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
1.11271,
52.086551
],
[
1.113096,
52.086946
],
[
1.116048,
52.09097
],
[
1.116095,
52.09122
],
[
1.116127,
52.091381
],
[
1.116162,
52.091551
],
[
1.116219,
52.091954
],
[
1.116237,
52.092215
],
[
1.116257,
52.092502
],
[
1.116246,
52.092763
],
[
1.116234,
52.093006
],
[
1.116196,
52.093295
],
[
1.116188,
52.093394
],
[
1.116109,
52.093729
],
[
1.115992,
52.094146
],
[
1.115895,
52.09442
],
[
1.113096,
52.086946
],
[
1.113217,
52.087006
],
[
1.113278,
52.087041
],
[
1.113325,
52.087084
],
[
1.113573,
52.087303
],
[
1.113583,
52.087311
],
[
1.114089,
52.087793
],
[
1.114388,
52.088099
],
[
1.11472,
52.088468
],
[
1.115025,
52.088856
],
[
1.115169,
52.089041
],
[
1.115236,
52.089156
],
[
1.115596,
52.08972
],
[
1.11562,
52.089762
],
[
1.115626,
52.089776
],
[
1.11575,
52.090037
],
[
1.11587,
52.0903
],
[
1.115909,
52.090443
],
[
1.116048,
52.09097
]
]
]
}
View road section coordinates
[
[
[
1.11271,
52.086551
],
[
1.113096,
52.086946
],
[
1.116048,
52.09097
],
[
1.116095,
52.09122
],
[
1.116127,
52.091381
],
[
1.116162,
52.091551
],
[
1.116219,
52.091954
],
[
1.116237,
52.092215
],
[
1.116257,
52.092502
],
[
1.116246,
52.092763
],
[
1.116234,
52.093006
],
[
1.116196,
52.093295
],
[
1.116188,
52.093394
],
[
1.116109,
52.093729
],
[
1.115992,
52.094146
],
[
1.115895,
52.09442
],
[
1.113096,
52.086946
],
[
1.113217,
52.087006
],
[
1.113278,
52.087041
],
[
1.113325,
52.087084
],
[
1.113573,
52.087303
],
[
1.113583,
52.087311
],
[
1.114089,
52.087793
],
[
1.114388,
52.088099
],
[
1.11472,
52.088468
],
[
1.115025,
52.088856
],
[
1.115169,
52.089041
],
[
1.115236,
52.089156
],
[
1.115596,
52.08972
],
[
1.11562,
52.089762
],
[
1.115626,
52.089776
],
[
1.11575,
52.090037
],
[
1.11587,
52.0903
],
[
1.115909,
52.090443
],
[
1.116048,
52.09097
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Apr 29, 2026 8:04 AM
- Record versioned
- Sat, Jul 11, 2026 3:52 AM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 60 to Jct 62 carriageway closure
Planned Roadworks National HighwaysStarts in 15 hours 22 minutes
A14 eastbound Jct 60 to Jct 62 carriageway closure
A14 both directions Jct 51 to Jct 52 lane 2 closure (MP 177/8 to 180/8)
Planned Roadworks National HighwaysStarts in 15 hours 22 minutes
A14 both directions Jct 51 to Jct 52 lane 2 closure (MP 177/8 to 180/8)
A14 eastbound Jct 46 lane 1 closure (MP 152/4 to 153/7)
Planned Roadworks National HighwaysStarts in 14 hours 22 minutes
A14 eastbound Jct 46 lane 1 closure (MP 152/4 to 153/7)
A14 eastbound Jct 33 to Jct 34 lane 1 closure
Planned Roadworks National HighwaysStarts in 13 hours 22 minutes
A14 eastbound Jct 33 to Jct 34 lane 1 closure
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
Cleared Roadworks National HighwaysCleared 8 hours 37 minutes ago
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
Cleared Roadworks National HighwaysCleared 2 hours 37 minutes ago
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)