A14 eastbound Thrapston to Easton lane 2 closure (MP 63/3 to 64/3)
ClearedA14 eastbound Thrapston to Easton lane 2 closure (MP 63/3 to 64/3)
- Start time
- Fri, Nov 7, 2025 8:00 PM
- Expected end
- Sat, Nov 8, 2025 6:00 AM
- Duration
- 10 hours
- Road
- A14 – A14 Eastbound Between J18 And J19A
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 2 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Nov 6, 2025 7:48 AM
- Last updated
- Fri, Nov 7, 2025 6:57 PM
- Cleared
- Sat, Nov 8, 2025 6:00 AM
- Latest update: A14 eastbound Thrapston to Easton lane 2 closure (MP 63/3 to 64/3)
- Coordinates
- 52.338053, -0.328179
- Latitude span
- 52.336875 – 52.340090
- Longitude span
- -0.334684 – -0.321337
- Bounding box centre
- 52.338483, -0.328011
- Location descriptions
-
- A14 eastbound between J18 and J19A
- Feed validity status
- Planned
- Overall feed start
- Fri, Nov 7, 2025 8:00 PM
- Overall feed end
- Sat, Nov 8, 2025 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
21 coordinate pairs- Description
- A14 eastbound between J18 and J19A
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {D1195050-BB4A-B3F8-1E2C-431A84C45093}
- Linear Element Type
- A Carriageway
- From Distance
- 614 m
- To Distance
- 1,425 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.34009 -0.334684 52.339608 -0.333535 52.339384 -0.332956 52.33916 -0.332377 52.338854 -0.331523 52.338776 -0.331306 52.33871 -0.331095 52.3384 -0.330101 52.338268 -0.329681 52.338117 -0.329158 52.33786 -0.328184 52.337765 -0.327802 52.337707 -0.327573 52.337563 -0.326874 52.337505 -0.326598 52.337447 -0.326306 52.337289 -0.325314 52.337239 -0.324964 52.337199 -0.324672 52.337157 -0.324233 52.337125 -0.323926
Segment 2
2 coordinate pairs- Description
- A14 eastbound between J18 and J19A
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {18385247-695F-4FA4-882C-F8533063A1E5}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 178 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.337125 -0.323926 52.336875 -0.321337
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -0.334684, 52.340090
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.334684,
52.34009
],
[
-0.333535,
52.339608
],
[
-0.332956,
52.339384
],
[
-0.332377,
52.33916
],
[
-0.331523,
52.338854
],
[
-0.331306,
52.338776
],
[
-0.331095,
52.33871
],
[
-0.330101,
52.3384
],
[
-0.329681,
52.338268
],
[
-0.329158,
52.338117
],
[
-0.328184,
52.33786
],
[
-0.327802,
52.337765
],
[
-0.327573,
52.337707
],
[
-0.326874,
52.337563
],
[
-0.326598,
52.337505
],
[
-0.326306,
52.337447
],
[
-0.325314,
52.337289
],
[
-0.324964,
52.337239
],
[
-0.324672,
52.337199
],
[
-0.324233,
52.337157
],
[
-0.323926,
52.337125
],
[
-0.323926,
52.337125
],
[
-0.321337,
52.336875
]
]
]
}
View road section coordinates
[
[
[
-0.334684,
52.34009
],
[
-0.333535,
52.339608
],
[
-0.332956,
52.339384
],
[
-0.332377,
52.33916
],
[
-0.331523,
52.338854
],
[
-0.331306,
52.338776
],
[
-0.331095,
52.33871
],
[
-0.330101,
52.3384
],
[
-0.329681,
52.338268
],
[
-0.329158,
52.338117
],
[
-0.328184,
52.33786
],
[
-0.327802,
52.337765
],
[
-0.327573,
52.337707
],
[
-0.326874,
52.337563
],
[
-0.326598,
52.337505
],
[
-0.326306,
52.337447
],
[
-0.325314,
52.337289
],
[
-0.324964,
52.337239
],
[
-0.324672,
52.337199
],
[
-0.324233,
52.337157
],
[
-0.323926,
52.337125
],
[
-0.323926,
52.337125
],
[
-0.321337,
52.336875
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Nov 6, 2025 7:48 AM
- Record versioned
- Fri, Nov 7, 2025 6:57 PM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A1(M) northbound Sawtry hard shoulder closure and 50mph speed restrictions on lanes 1,2, 3, 4
Planned Roadworks National HighwaysExpected to clear in 2 weeks 2 days
A1(M) northbound Sawtry hard shoulder closure and 50mph speed restrictions on lanes 1,2, 3, 4
A14 eastbound Jct 49 lane 1 closure
Cleared Roadworks National HighwaysCleared 17 hours 45 minutes ago
A14 eastbound Jct 49 lane 1 closure
A14 westbound Jct 49 exit and entry slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 1 day 7 hours ago
A14 westbound Jct 49 exit and entry slip road lane 1 closure
A14 eastbound Jct 49 exit and entry slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 1 day 15 hours ago
A14 eastbound Jct 49 exit and entry slip road lane 1 closure
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
Cleared Roadworks National HighwaysCleared 1 day 9 hours ago
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
A1 eastbound New Ellington Roundabout to Brampton Hut Roundabout lane 2 closure
Cleared Roadworks National HighwaysCleared 1 day 9 hours ago
A1 eastbound New Ellington Roundabout to Brampton Hut Roundabout lane 2 closure