A14 eastbound Milton to Fen Ditton lane 2 closure (MP 102/2 to 103/7)
PlannedA14 eastbound Milton to Fen Ditton lane 2 closure (MP 102/2 to 103/7)
- Start time
- Mon, Oct 6, 2025 7:00 PM
- Expected end
- Tue, Oct 7, 2025 4:00 AM
- Duration
- 9 hours
- Road
- A14 – A14 Eastbound Between J34 And J35
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 3, 2025 7:48 AM
- Last updated
- Mon, Oct 6, 2025 7:51 PM
- Cleared
- Tue, Oct 7, 2025 4:00 AM
- Latest update: A14 eastbound Milton to Fen Ditton lane 2 closure (MP 102/2 to 103/7)
- Coordinates
- 52.230207, 0.176554
- Latitude span
- 52.225959 – 52.233822
- Longitude span
- 0.166182 – 0.183245
- Bounding box centre
- 52.229891, 0.174714
- Location descriptions
-
- A14 eastbound between J34 and J35
- A14 eastbound between J33 and J34
- Feed validity status
- Planned
- Overall feed start
- Mon, Oct 6, 2025 7:00 PM
- Overall feed end
- Tue, Oct 7, 2025 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
14 coordinate pairs- Description
- A14 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {4D4D7856-3082-4A43-A195-02BFB3F7B3FF}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 453 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.231521 0.174439 52.231424 0.174692 52.23132 0.174914 52.231011 0.175748 52.23072 0.17645 52.230513 0.176937 52.230288 0.177435 52.229949 0.178122 52.229662 0.178632 52.22943 0.179031 52.229152 0.179499 52.229143 0.179513 52.229043 0.179667 52.229039 0.179674
Segment 2
9 coordinate pairs- Description
- A14 eastbound between J33 and J34
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {07BE5CF6-36AD-4955-8CD3-1E8D08DDEE17}
- Linear Element Type
- A Carriageway
- From Distance
- 575 m
- To Distance
- 1,195 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.233822 0.166182 52.233639 0.166845 52.233484 0.167409 52.232913 0.169446 52.232638 0.170428 52.232561 0.170703 52.232029 0.17264 52.231759 0.173661 52.231521 0.174439
Segment 3
10 coordinate pairs- Description
- A14 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {1A0C2FD4-6FB0-4126-9BCC-B64809D1C5D1}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 421 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.229039 0.179674 52.228997 0.179741 52.22882 0.180013 52.228678 0.180216 52.228668 0.18023 52.228176 0.180881 52.2276 0.181587 52.227272 0.181954 52.227026 0.182224 52.225959 0.183245
- Geometry type
- MultiLineString
- Geometry points
- 33
- First coordinate pair
- 0.174439, 52.231521
- Road section segments
- 1
- Road section points
- 33
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.174439,
52.231521
],
[
0.174692,
52.231424
],
[
0.174914,
52.23132
],
[
0.175748,
52.231011
],
[
0.17645,
52.23072
],
[
0.176937,
52.230513
],
[
0.177435,
52.230288
],
[
0.178122,
52.229949
],
[
0.178632,
52.229662
],
[
0.179031,
52.22943
],
[
0.179499,
52.229152
],
[
0.179513,
52.229143
],
[
0.179667,
52.229043
],
[
0.179674,
52.229039
],
[
0.166182,
52.233822
],
[
0.166845,
52.233639
],
[
0.167409,
52.233484
],
[
0.169446,
52.232913
],
[
0.170428,
52.232638
],
[
0.170703,
52.232561
],
[
0.17264,
52.232029
],
[
0.173661,
52.231759
],
[
0.174439,
52.231521
],
[
0.179674,
52.229039
],
[
0.179741,
52.228997
],
[
0.180013,
52.22882
],
[
0.180216,
52.228678
],
[
0.18023,
52.228668
],
[
0.180881,
52.228176
],
[
0.181587,
52.2276
],
[
0.181954,
52.227272
],
[
0.182224,
52.227026
],
[
0.183245,
52.225959
]
]
]
}
View road section coordinates
[
[
[
0.174439,
52.231521
],
[
0.174692,
52.231424
],
[
0.174914,
52.23132
],
[
0.175748,
52.231011
],
[
0.17645,
52.23072
],
[
0.176937,
52.230513
],
[
0.177435,
52.230288
],
[
0.178122,
52.229949
],
[
0.178632,
52.229662
],
[
0.179031,
52.22943
],
[
0.179499,
52.229152
],
[
0.179513,
52.229143
],
[
0.179667,
52.229043
],
[
0.179674,
52.229039
],
[
0.166182,
52.233822
],
[
0.166845,
52.233639
],
[
0.167409,
52.233484
],
[
0.169446,
52.232913
],
[
0.170428,
52.232638
],
[
0.170703,
52.232561
],
[
0.17264,
52.232029
],
[
0.173661,
52.231759
],
[
0.174439,
52.231521
],
[
0.179674,
52.229039
],
[
0.179741,
52.228997
],
[
0.180013,
52.22882
],
[
0.180216,
52.228678
],
[
0.18023,
52.228668
],
[
0.180881,
52.228176
],
[
0.181587,
52.2276
],
[
0.181954,
52.227272
],
[
0.182224,
52.227026
],
[
0.183245,
52.225959
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Oct 3, 2025 7:48 AM
- Record versioned
- Mon, Oct 6, 2025 7:51 PM
- Coordinate source
- Geometry
Related incidents
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
M11 southbound Jct 11 exit slip road lane 2 closure
Planned National HighwaysM11 southbound Jct 11 exit slip road lane 2 closure
M11 southbound Jct 11 exit slip road lane 2 closure
Planned National HighwaysM11 southbound Jct 11 exit slip road lane 2 closure
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
Planned National HighwaysA14 eastbound Jct 49 to Jct 50 lane 1 closure (MP 165/7 to 169/5)
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
Planned National HighwaysA14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)