A14 eastbound Jct 7 exit slip road lane closure
ClearedA14 eastbound Jct 7 exit slip road lane closure
- Start time
- Thu, Mar 26, 2026 8:00 PM
- Expected end
- Fri, Mar 27, 2026 6:00 AM
- Duration
- 10 hours
- Road
- A14 – A14 J7 Eastbound Exit
- Category
- Construction Work
- Direction
- Eastbound
- Lanes affected
- Lane 1 closed
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Mar 26, 2026 4:33 AM
- Last updated
- Thu, Mar 26, 2026 7:59 PM
- Cleared
- Fri, Mar 27, 2026 6:00 AM
- Latest update: A14 eastbound Jct 7 exit slip road lane closure
- Coordinates
- 52.408475, -0.754162
- Latitude span
- 52.408316 – 52.408781
- Longitude span
- -0.754804 – -0.753602
- Bounding box centre
- 52.408549, -0.754203
- Location descriptions
-
- A14 J7 eastbound exit
- Feed validity status
- Planned
- Overall feed start
- Thu, Mar 26, 2026 8:00 PM
- Overall feed end
- Fri, Mar 27, 2026 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A14 J7 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {F0830FDA-1108-4880-BEAC-3860E1FEE095}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 295 m
- To Distance
- 345 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.408781 -0.754804 52.408465 -0.754271
Segment 2
3 coordinate pairs- Description
- A14 J7 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {2B29B00D-F525-4451-9448-2F9DAABF3FD2}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 48 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.408465 -0.754271 52.408349 -0.75386 52.408316 -0.753602
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -0.754804, 52.408781
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.754804,
52.408781
],
[
-0.754271,
52.408465
],
[
-0.754271,
52.408465
],
[
-0.75386,
52.408349
],
[
-0.753602,
52.408316
]
]
]
}
View road section coordinates
[
[
[
-0.754804,
52.408781
],
[
-0.754271,
52.408465
],
[
-0.754271,
52.408465
],
[
-0.75386,
52.408349
],
[
-0.753602,
52.408316
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Mar 26, 2026 4:33 AM
- Record versioned
- Thu, Mar 26, 2026 7:59 PM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
Planned Roadworks National HighwaysStarts in 18 hours 15 minutes
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
A14 eastbound Spaldwick to Thrapston lane 1 closure and splitter
Planned Roadworks National HighwaysStarts in 18 hours 15 minutes
A14 eastbound Spaldwick to Thrapston lane 1 closure and splitter
A14 eastbound Jct 22 to Jct 23 lane closure
Planned Roadworks National HighwaysStarts in 17 hours 15 minutes
A14 eastbound Jct 22 to Jct 23 lane closure
A14 both directions Jct 17 to Jct 19 lane 2 closures (MP 61/4 to 64/7)
Planned Roadworks National HighwaysStarts in 17 hours 15 minutes
A14 both directions Jct 17 to Jct 19 lane 2 closures (MP 61/4 to 64/7)
A14 eastbound Brampton Village lane 1 closure (MP 70/8 to 74/0)
Planned Roadworks National HighwaysStarts in 17 hours 15 minutes
A14 eastbound Brampton Village lane 1 closure (MP 70/8 to 74/0)
A14 eastbound Jct 22 lane 1 closure
Planned Roadworks National HighwaysStarts in 17 hours 15 minutes
A14 eastbound Jct 22 lane 1 closure