A14 eastbound Jct 58 to Jct 59 lane 1 closure
ClearedA14 eastbound Jct 58 to Jct 59 lane 1 closure
- Start time
- Thu, Jul 9, 2026 7:00 PM
- Expected end
- Fri, Jul 10, 2026 5:00 AM
- Duration
- 55 minutes 2 seconds
- Road
- A14 – A14 J59 Eastbound Exit
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 9, 2026 6:51 PM
- Last updated
- Thu, Jul 9, 2026 7:21 PM
- Cleared
- Thu, Jul 9, 2026 7:55 PM
- Latest update: A14 eastbound Jct 58 to Jct 59 lane 1 closure
- Coordinates
- 51.995867, 1.307525
- Latitude span
- 51.992187 – 51.999012
- Longitude span
- 1.296803 – 1.317190
- Bounding box centre
- 51.995600, 1.306997
- Location descriptions
-
- A14 J59 eastbound exit
- A14 eastbound between J58 and J59
- Feed validity status
- Active
- Overall feed start
- Thu, Jul 9, 2026 7:00 PM
- Overall feed end
- Fri, Jul 10, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- A14 J59 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E0B1689-52F4-4E0F-90FD-3AD1E122151C}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 181 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.99343 1.315512 51.993164 1.316003 51.993032 1.316212 51.992976 1.316295 51.992613 1.316734 51.992251 1.31713 51.992187 1.31719
Segment 2
13 coordinate pairs- Description
- A14 eastbound between J58 and J59
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {0AE0A127-F75F-4679-99BD-059B11715031}
- Linear Element Type
- A Carriageway
- From Distance
- 281 m
- To Distance
- 666 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.999012 1.296803 51.998859 1.297073 51.998659 1.297463 51.998535 1.297705 51.998257 1.298311 51.998103 1.298679 51.99788 1.29926 51.997793 1.299489 51.997783 1.299515 51.997574 1.300151 51.997346 1.300884 51.997177 1.301511 51.997174 1.301524
Segment 3
26 coordinate pairs- Description
- A14 eastbound between J58 and J59
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {63A638FF-EF02-46FB-8D19-789886934A1F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 1,072 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.997174 1.301524 51.997118 1.301731 51.996916 1.302616 51.996774 1.303348 51.996665 1.304025 51.996562 1.30479 51.996455 1.305729 51.996337 1.306897 51.996261 1.307583 51.996193 1.308154 51.996126 1.30863 51.99604 1.30913 51.995956 1.309564 51.995871 1.309955 51.995714 1.310581 51.995552 1.311141 51.995408 1.311607 51.995235 1.312097 51.995051 1.312565 51.994842 1.313044 51.994618 1.313552 51.994416 1.313949 51.994042 1.314606 51.993831 1.314918 51.993477 1.315443 51.99343 1.315512
- Geometry type
- MultiLineString
- Geometry points
- 46
- First coordinate pair
- 1.315512, 51.993430
- Road section segments
- 1
- Road section points
- 46
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
1.315512,
51.99343
],
[
1.316003,
51.993164
],
[
1.316212,
51.993032
],
[
1.316295,
51.992976
],
[
1.316734,
51.992613
],
[
1.31713,
51.992251
],
[
1.31719,
51.992187
],
[
1.296803,
51.999012
],
[
1.297073,
51.998859
],
[
1.297463,
51.998659
],
[
1.297705,
51.998535
],
[
1.298311,
51.998257
],
[
1.298679,
51.998103
],
[
1.29926,
51.99788
],
[
1.299489,
51.997793
],
[
1.299515,
51.997783
],
[
1.300151,
51.997574
],
[
1.300884,
51.997346
],
[
1.301511,
51.997177
],
[
1.301524,
51.997174
],
[
1.301524,
51.997174
],
[
1.301731,
51.997118
],
[
1.302616,
51.996916
],
[
1.303348,
51.996774
],
[
1.304025,
51.996665
],
[
1.30479,
51.996562
],
[
1.305729,
51.996455
],
[
1.306897,
51.996337
],
[
1.307583,
51.996261
],
[
1.308154,
51.996193
],
[
1.30863,
51.996126
],
[
1.30913,
51.99604
],
[
1.309564,
51.995956
],
[
1.309955,
51.995871
],
[
1.310581,
51.995714
],
[
1.311141,
51.995552
],
[
1.311607,
51.995408
],
[
1.312097,
51.995235
],
[
1.312565,
51.995051
],
[
1.313044,
51.994842
],
[
1.313552,
51.994618
],
[
1.313949,
51.994416
],
[
1.314606,
51.994042
],
[
1.314918,
51.993831
],
[
1.315443,
51.993477
],
[
1.315512,
51.99343
]
]
]
}
View road section coordinates
[
[
[
1.315512,
51.99343
],
[
1.316003,
51.993164
],
[
1.316212,
51.993032
],
[
1.316295,
51.992976
],
[
1.316734,
51.992613
],
[
1.31713,
51.992251
],
[
1.31719,
51.992187
],
[
1.296803,
51.999012
],
[
1.297073,
51.998859
],
[
1.297463,
51.998659
],
[
1.297705,
51.998535
],
[
1.298311,
51.998257
],
[
1.298679,
51.998103
],
[
1.29926,
51.99788
],
[
1.299489,
51.997793
],
[
1.299515,
51.997783
],
[
1.300151,
51.997574
],
[
1.300884,
51.997346
],
[
1.301511,
51.997177
],
[
1.301524,
51.997174
],
[
1.301524,
51.997174
],
[
1.301731,
51.997118
],
[
1.302616,
51.996916
],
[
1.303348,
51.996774
],
[
1.304025,
51.996665
],
[
1.30479,
51.996562
],
[
1.305729,
51.996455
],
[
1.306897,
51.996337
],
[
1.307583,
51.996261
],
[
1.308154,
51.996193
],
[
1.30863,
51.996126
],
[
1.30913,
51.99604
],
[
1.309564,
51.995956
],
[
1.309955,
51.995871
],
[
1.310581,
51.995714
],
[
1.311141,
51.995552
],
[
1.311607,
51.995408
],
[
1.312097,
51.995235
],
[
1.312565,
51.995051
],
[
1.313044,
51.994842
],
[
1.313552,
51.994618
],
[
1.313949,
51.994416
],
[
1.314606,
51.994042
],
[
1.314918,
51.993831
],
[
1.315443,
51.993477
],
[
1.315512,
51.99343
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 9, 2026 6:51 PM
- Record versioned
- Thu, Jul 9, 2026 7:21 PM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 23 to Jct 24 lane 1 and 2 closure (MP 81/1 to 82/0)
Active Roadworks National HighwaysExpected to clear in 6 hours 2 minutes
A14 eastbound Jct 23 to Jct 24 lane 1 and 2 closure (MP 81/1 to 82/0)
A14 eastbound Jct 32 to Jct 33 lane 1 closure (MP 99/4 to 100/7)
Planned Roadworks National HighwaysExpected to clear in 5 hours 2 minutes
A14 eastbound Jct 32 to Jct 33 lane 1 closure (MP 99/4 to 100/7)
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
Cleared Roadworks National HighwaysCleared 1 hour 56 minutes ago
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
Cleared Roadworks National HighwaysCleared 26 minutes 59 seconds ago
A14 eastbound Jct 51 to Jct 52 lane 2 closure (MP 174/5 to 178/1)
A14 westbound Jct 59 entry slip road closure
Cleared Roadworks National HighwaysCleared 2 hours 26 minutes ago
A14 westbound Jct 59 entry slip road closure
A14 eastbound Jct 37 to Jct 38 lane 1 closure (MP 122/4 to 124/9)
Cleared Roadworks National HighwaysCleared 26 minutes 59 seconds ago
A14 eastbound Jct 37 to Jct 38 lane 1 closure (MP 122/4 to 124/9)