A14 eastbound Jct 49 to 50 lane 2 closure (MP 165/7 to 167/6)
ClearedA14 eastbound Jct 49 to 50 lane 2 closure (MP 165/7 to 167/6)
- Start time
- Thu, Jan 29, 2026 9:00 PM
- Expected end
- Fri, Jan 30, 2026 5:00 AM
- Duration
- 8 hours
- Road
- A14 – A14 Westbound Between J50 And J49
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jan 28, 2026 11:03 AM
- Last updated
- Thu, Jan 29, 2026 11:27 PM
- Cleared
- Fri, Jan 30, 2026 5:00 AM
- Latest update: A14 eastbound Jct 49 to 50 lane 2 closure (MP 165/7 to 167/6)
- Coordinates
- 52.198071, 0.994213
- Latitude span
- 52.196391 – 52.201624
- Longitude span
- 0.982756 – 1.006771
- Bounding box centre
- 52.199008, 0.994764
- Location descriptions
-
- A14 westbound between J50 and J49
- A14 eastbound between J49 and J50
- Feed validity status
- Planned
- Overall feed start
- Thu, Jan 29, 2026 9:00 PM
- Overall feed end
- Fri, Jan 30, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
11 coordinate pairs- Description
- A14 westbound between J50 and J49
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {9F38AD36-C674-4AA3-BAF9-C48998F1806E}
- Linear Element Type
- B Carriageway
- From Distance
- 328 m
- To Distance
- 1,007 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.201624 0.982756 52.200678 0.984172 52.200227 0.984933 52.20002 0.985327 52.199564 0.986273 52.199245 0.987022 52.198769 0.988274 52.198656 0.988653 52.198352 0.989787 52.198282 0.990061 52.198134 0.990739
Segment 2
2 coordinate pairs- Description
- A14 eastbound between J49 and J50
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {6BC1F151-83EF-43F0-B66B-8F847483AE65}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 6 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.198134 0.990739 52.198116 0.990831
Segment 3
11 coordinate pairs- Description
- A14 eastbound between J49 and J50
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {3B3EACA4-3B9E-4B5E-99B9-A6F66F7D6C36}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 655 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.197431 0.997365 52.197356 0.998209 52.197329 0.998558 52.197172 1.000465 52.197006 1.0024 52.196938 1.003293 52.196875 1.00398 52.196781 1.004656 52.196634 1.005626 52.19646 1.006464 52.196391 1.006771
Segment 4
9 coordinate pairs- Description
- A14 eastbound between J49 and J50
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {65AB3005-438D-44B6-8B34-C0982679CF01}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 453 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.198116 0.990831 52.198077 0.991042 52.197982 0.991621 52.197895 0.992215 52.197799 0.993146 52.197726 0.993887 52.1976 0.995328 52.197532 0.99623 52.197431 0.997365
- Geometry type
- MultiLineString
- Geometry points
- 33
- First coordinate pair
- 0.982756, 52.201624
- Road section segments
- 1
- Road section points
- 33
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.982756,
52.201624
],
[
0.984172,
52.200678
],
[
0.984933,
52.200227
],
[
0.985327,
52.20002
],
[
0.986273,
52.199564
],
[
0.987022,
52.199245
],
[
0.988274,
52.198769
],
[
0.988653,
52.198656
],
[
0.989787,
52.198352
],
[
0.990061,
52.198282
],
[
0.990739,
52.198134
],
[
0.990739,
52.198134
],
[
0.990831,
52.198116
],
[
0.997365,
52.197431
],
[
0.998209,
52.197356
],
[
0.998558,
52.197329
],
[
1.000465,
52.197172
],
[
1.0024,
52.197006
],
[
1.003293,
52.196938
],
[
1.00398,
52.196875
],
[
1.004656,
52.196781
],
[
1.005626,
52.196634
],
[
1.006464,
52.19646
],
[
1.006771,
52.196391
],
[
0.990831,
52.198116
],
[
0.991042,
52.198077
],
[
0.991621,
52.197982
],
[
0.992215,
52.197895
],
[
0.993146,
52.197799
],
[
0.993887,
52.197726
],
[
0.995328,
52.1976
],
[
0.99623,
52.197532
],
[
0.997365,
52.197431
]
]
]
}
View road section coordinates
[
[
[
0.982756,
52.201624
],
[
0.984172,
52.200678
],
[
0.984933,
52.200227
],
[
0.985327,
52.20002
],
[
0.986273,
52.199564
],
[
0.987022,
52.199245
],
[
0.988274,
52.198769
],
[
0.988653,
52.198656
],
[
0.989787,
52.198352
],
[
0.990061,
52.198282
],
[
0.990739,
52.198134
],
[
0.990739,
52.198134
],
[
0.990831,
52.198116
],
[
0.997365,
52.197431
],
[
0.998209,
52.197356
],
[
0.998558,
52.197329
],
[
1.000465,
52.197172
],
[
1.0024,
52.197006
],
[
1.003293,
52.196938
],
[
1.00398,
52.196875
],
[
1.004656,
52.196781
],
[
1.005626,
52.196634
],
[
1.006464,
52.19646
],
[
1.006771,
52.196391
],
[
0.990831,
52.198116
],
[
0.991042,
52.198077
],
[
0.991621,
52.197982
],
[
0.992215,
52.197895
],
[
0.993146,
52.197799
],
[
0.993887,
52.197726
],
[
0.995328,
52.1976
],
[
0.99623,
52.197532
],
[
0.997365,
52.197431
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jan 28, 2026 11:03 AM
- Record versioned
- Thu, Jan 29, 2026 11:27 PM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound approach to New Ellington lane closure
Planned Roadworks National HighwaysStarts in 13 hours 19 minutes
A14 eastbound approach to New Ellington lane closure
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
Planned Roadworks National HighwaysStarts in 13 hours 19 minutes
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
Planned Roadworks National HighwaysStarts in 13 hours 19 minutes
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
A14 eastbound Spaldwick to Thrapston lane 1 closure and splitter
Planned Roadworks National HighwaysStarts in 13 hours 19 minutes
A14 eastbound Spaldwick to Thrapston lane 1 closure and splitter
A14 eastbound Jct 22 to Jct 23 lane closure
Planned Roadworks National HighwaysStarts in 12 hours 19 minutes
A14 eastbound Jct 22 to Jct 23 lane closure
A14 both directions Jct 17 to Jct 19 lane 2 closures (MP 61/4 to 64/7)
Planned Roadworks National HighwaysStarts in 12 hours 19 minutes
A14 both directions Jct 17 to Jct 19 lane 2 closures (MP 61/4 to 64/7)