A14 eastbound Jct 24 exit slip road closure
ClearedA14 eastbound Jct 24 exit slip road closure
- Start time
- Mon, Oct 19, 2026 6:49 PM
- Expected end
- Tue, Oct 20, 2026 4:00 AM
- Duration
- 3 hours 16 minutes 2 seconds
- Road
- A14 – A14 J24B Eastbound Exit
- Category
- Construction Work
- Direction
- Eastbound
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 19, 2026 6:49 PM
- Last updated
- Mon, Oct 19, 2026 9:41 PM
- Cleared
- Mon, Oct 19, 2026 10:05 PM
- Latest update: A14 eastbound Jct 24 exit slip road closure
- Coordinates
- 52.275490, -0.016199
- Latitude span
- 52.274813 – 52.276417
- Longitude span
- -0.019566 – -0.014593
- Bounding box centre
- 52.275615, -0.017080
- Location descriptions
-
- A14 J24B eastbound exit
- Feed validity status
- Active
- Overall feed start
- Mon, Oct 19, 2026 6:49 PM
- Overall feed end
- Tue, Oct 20, 2026 4:00 AM
- Feed window length
- 9 hours 11 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
24 coordinate pairs- Description
- A14 J24B eastbound exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {189045B9-1039-4234-983F-C601B4E3CA06}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 369 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.275371 -0.017305 52.275267 -0.017039 52.274999 -0.01636 52.274927 -0.01617 52.274868 -0.015971 52.274825 -0.015766 52.274813 -0.015615 52.274815 -0.01545 52.274837 -0.015279 52.274875 -0.015132 52.274925 -0.014997 52.274985 -0.014881 52.275065 -0.01477 52.275154 -0.014691 52.275245 -0.01463 52.275365 -0.014593 52.275469 -0.014598 52.275579 -0.01463 52.275694 -0.014705 52.276185 -0.015129 52.276291 -0.015232 52.276346 -0.015314 52.276382 -0.015386 52.276417 -0.015462
Segment 2
8 coordinate pairs- Description
- A14 J24B eastbound exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {7FEE0274-E6F3-423F-9439-2E33EC0E72CD}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 178 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.276161 -0.019566 52.276161 -0.019479 52.276125 -0.019325 52.27607 -0.01914 52.275955 -0.018805 52.275718 -0.018187 52.275432 -0.017458 52.275371 -0.017305
- Geometry type
- MultiLineString
- Geometry points
- 32
- First coordinate pair
- -0.017305, 52.275371
- Road section segments
- 1
- Road section points
- 32
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.017305,
52.275371
],
[
-0.017039,
52.275267
],
[
-0.01636,
52.274999
],
[
-0.01617,
52.274927
],
[
-0.015971,
52.274868
],
[
-0.015766,
52.274825
],
[
-0.015615,
52.274813
],
[
-0.01545,
52.274815
],
[
-0.015279,
52.274837
],
[
-0.015132,
52.274875
],
[
-0.014997,
52.274925
],
[
-0.014881,
52.274985
],
[
-0.01477,
52.275065
],
[
-0.014691,
52.275154
],
[
-0.01463,
52.275245
],
[
-0.014593,
52.275365
],
[
-0.014598,
52.275469
],
[
-0.01463,
52.275579
],
[
-0.014705,
52.275694
],
[
-0.015129,
52.276185
],
[
-0.015232,
52.276291
],
[
-0.015314,
52.276346
],
[
-0.015386,
52.276382
],
[
-0.015462,
52.276417
],
[
-0.019566,
52.276161
],
[
-0.019479,
52.276161
],
[
-0.019325,
52.276125
],
[
-0.01914,
52.27607
],
[
-0.018805,
52.275955
],
[
-0.018187,
52.275718
],
[
-0.017458,
52.275432
],
[
-0.017305,
52.275371
]
]
]
}
View road section coordinates
[
[
[
-0.017305,
52.275371
],
[
-0.017039,
52.275267
],
[
-0.01636,
52.274999
],
[
-0.01617,
52.274927
],
[
-0.015971,
52.274868
],
[
-0.015766,
52.274825
],
[
-0.015615,
52.274813
],
[
-0.01545,
52.274815
],
[
-0.015279,
52.274837
],
[
-0.015132,
52.274875
],
[
-0.014997,
52.274925
],
[
-0.014881,
52.274985
],
[
-0.01477,
52.275065
],
[
-0.014691,
52.275154
],
[
-0.01463,
52.275245
],
[
-0.014593,
52.275365
],
[
-0.014598,
52.275469
],
[
-0.01463,
52.275579
],
[
-0.014705,
52.275694
],
[
-0.015129,
52.276185
],
[
-0.015232,
52.276291
],
[
-0.015314,
52.276346
],
[
-0.015386,
52.276382
],
[
-0.015462,
52.276417
],
[
-0.019566,
52.276161
],
[
-0.019479,
52.276161
],
[
-0.019325,
52.276125
],
[
-0.01914,
52.27607
],
[
-0.018805,
52.275955
],
[
-0.018187,
52.275718
],
[
-0.017458,
52.275432
],
[
-0.017305,
52.275371
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Oct 19, 2026 6:49 PM
- Record versioned
- Mon, Oct 19, 2026 9:41 PM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 38 to Jct 39 lane closure
Planned Roadworks National HighwaysExpected to clear in 5 hours 8 minutes
A14 eastbound Jct 38 to Jct 39 lane closure
A428 both directions Girton to Caxton mobile lane closures
Cleared Roadworks National HighwaysCleared 31 minutes 3 seconds ago
A428 both directions Girton to Caxton mobile lane closures
A14 eastbound Jct 24 entry slip road lane 2 closure
Cleared Roadworks National HighwaysCleared 4 hours 51 minutes ago
A14 eastbound Jct 24 entry slip road lane 2 closure
A14 eastbound Beyton to Woolpit lane closure
Cleared Roadworks National HighwaysCleared 31 minutes 3 seconds ago
A14 eastbound Beyton to Woolpit lane closure
A14 eastbound Jct 7 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 2 hours 6 minutes ago
A14 eastbound Jct 7 exit slip road lane closure
A14 eastbound Jct 33 to Jct 34 lane 1 closure
Cleared Roadworks National HighwaysCleared 4 hours 51 minutes ago
A14 eastbound Jct 33 to Jct 34 lane 1 closure