A14 eastbound Jct 24 exit slip road closure
ClearedA14 eastbound Jct 24 exit slip road closure
- Start time
- Thu, Mar 26, 2026 7:54 PM
- Expected end
- Fri, Mar 27, 2026 6:00 AM
- Duration
- 10 hours 6 minutes
- Road
- A14 – A14 J24B Eastbound Exit
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Mar 26, 2026 7:54 PM
- Last updated
- Fri, Mar 27, 2026 12:09 AM
- Cleared
- Fri, Mar 27, 2026 6:00 AM
- Latest update: A14 eastbound Jct 24 exit slip road closure
- Coordinates
- 52.275490, -0.016199
- Latitude span
- 52.274813 – 52.276417
- Longitude span
- -0.019566 – -0.014593
- Bounding box centre
- 52.275615, -0.017080
- Location descriptions
-
- A14 J24B eastbound exit
- Feed validity status
- Active
- Overall feed start
- Thu, Mar 26, 2026 7:54 PM
- Overall feed end
- Fri, Mar 27, 2026 6:00 AM
- Feed window length
- 10 hours 6 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- A14 J24B eastbound exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {7FEE0274-E6F3-423F-9439-2E33EC0E72CD}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 178 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.276161 -0.019566 52.276161 -0.019479 52.276125 -0.019325 52.27607 -0.01914 52.275955 -0.018805 52.275718 -0.018187 52.275432 -0.017458 52.275371 -0.017305
Segment 2
24 coordinate pairs- Description
- A14 J24B eastbound exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {189045B9-1039-4234-983F-C601B4E3CA06}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 369 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.275371 -0.017305 52.275267 -0.017039 52.274999 -0.01636 52.274927 -0.01617 52.274868 -0.015971 52.274825 -0.015766 52.274813 -0.015615 52.274815 -0.01545 52.274837 -0.015279 52.274875 -0.015132 52.274925 -0.014997 52.274985 -0.014881 52.275065 -0.01477 52.275154 -0.014691 52.275245 -0.01463 52.275365 -0.014593 52.275469 -0.014598 52.275579 -0.01463 52.275694 -0.014705 52.276185 -0.015129 52.276291 -0.015232 52.276346 -0.015314 52.276382 -0.015386 52.276417 -0.015462
- Geometry type
- MultiLineString
- Geometry points
- 32
- First coordinate pair
- -0.019566, 52.276161
- Road section segments
- 1
- Road section points
- 32
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.019566,
52.276161
],
[
-0.019479,
52.276161
],
[
-0.019325,
52.276125
],
[
-0.01914,
52.27607
],
[
-0.018805,
52.275955
],
[
-0.018187,
52.275718
],
[
-0.017458,
52.275432
],
[
-0.017305,
52.275371
],
[
-0.017305,
52.275371
],
[
-0.017039,
52.275267
],
[
-0.01636,
52.274999
],
[
-0.01617,
52.274927
],
[
-0.015971,
52.274868
],
[
-0.015766,
52.274825
],
[
-0.015615,
52.274813
],
[
-0.01545,
52.274815
],
[
-0.015279,
52.274837
],
[
-0.015132,
52.274875
],
[
-0.014997,
52.274925
],
[
-0.014881,
52.274985
],
[
-0.01477,
52.275065
],
[
-0.014691,
52.275154
],
[
-0.01463,
52.275245
],
[
-0.014593,
52.275365
],
[
-0.014598,
52.275469
],
[
-0.01463,
52.275579
],
[
-0.014705,
52.275694
],
[
-0.015129,
52.276185
],
[
-0.015232,
52.276291
],
[
-0.015314,
52.276346
],
[
-0.015386,
52.276382
],
[
-0.015462,
52.276417
]
]
]
}
View road section coordinates
[
[
[
-0.019566,
52.276161
],
[
-0.019479,
52.276161
],
[
-0.019325,
52.276125
],
[
-0.01914,
52.27607
],
[
-0.018805,
52.275955
],
[
-0.018187,
52.275718
],
[
-0.017458,
52.275432
],
[
-0.017305,
52.275371
],
[
-0.017305,
52.275371
],
[
-0.017039,
52.275267
],
[
-0.01636,
52.274999
],
[
-0.01617,
52.274927
],
[
-0.015971,
52.274868
],
[
-0.015766,
52.274825
],
[
-0.015615,
52.274813
],
[
-0.01545,
52.274815
],
[
-0.015279,
52.274837
],
[
-0.015132,
52.274875
],
[
-0.014997,
52.274925
],
[
-0.014881,
52.274985
],
[
-0.01477,
52.275065
],
[
-0.014691,
52.275154
],
[
-0.01463,
52.275245
],
[
-0.014593,
52.275365
],
[
-0.014598,
52.275469
],
[
-0.01463,
52.275579
],
[
-0.014705,
52.275694
],
[
-0.015129,
52.276185
],
[
-0.015232,
52.276291
],
[
-0.015314,
52.276346
],
[
-0.015386,
52.276382
],
[
-0.015462,
52.276417
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Mar 26, 2026 7:54 PM
- Record versioned
- Fri, Mar 27, 2026 12:09 AM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
M11 northbound Jct 11 hard shoulder closure (MP 80/4 to 83/1)
Planned Roadworks National HighwaysExpected to clear in 9 months 2 weeks
M11 northbound Jct 11 hard shoulder closure (MP 80/4 to 83/1)
A428 eastbound Caxton Gibbet approach and roundabout - lane 1 closure
Active Roadworks National HighwaysExpected to clear in 2 months 2 weeks
A428 eastbound Caxton Gibbet approach and roundabout - lane 1 closure
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
Planned Roadworks National HighwaysStarts in 16 hours 34 minutes
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
A14 eastbound Spaldwick to Thrapston lane 1 closure and splitter
Planned Roadworks National HighwaysStarts in 16 hours 34 minutes
A14 eastbound Spaldwick to Thrapston lane 1 closure and splitter
A14 eastbound Jct 22 to Jct 23 lane closure
Planned Roadworks National HighwaysStarts in 15 hours 34 minutes
A14 eastbound Jct 22 to Jct 23 lane closure
A14 both directions Jct 17 to Jct 19 lane 2 closures (MP 61/4 to 64/7)
Planned Roadworks National HighwaysStarts in 15 hours 34 minutes
A14 both directions Jct 17 to Jct 19 lane 2 closures (MP 61/4 to 64/7)