A14 eastbound Jct 20 to Jct 21 lane 1 closure (MP 65/8 to 67/3)
ClearedA14 eastbound Jct 20 to Jct 21 lane 1 closure (MP 65/8 to 67/3)
- Start time
- Mon, Sep 14, 2026 7:00 PM
- Expected end
- Tue, Sep 15, 2026 5:00 AM
- Duration
- 4 hours 50 minutes 2 seconds
- Road
- A14 – A14 Eastbound Within J20
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 14, 2026 8:05 PM
- Last updated
- Mon, Sep 14, 2026 11:31 PM
- Cleared
- Mon, Sep 14, 2026 11:50 PM
- Latest update: A14 eastbound Jct 20 to Jct 21 lane 1 closure (MP 65/8 to 67/3)
- Coordinates
- 52.333376, -0.288793
- Latitude span
- 52.332449 – 52.334857
- Longitude span
- -0.300138 – -0.278144
- Bounding box centre
- 52.333653, -0.289141
- Location descriptions
-
- A14 eastbound within J20
- A14 eastbound between J20 and J21
- Feed validity status
- Active
- Overall feed start
- Mon, Sep 14, 2026 7:00 PM
- Overall feed end
- Tue, Sep 15, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- A14 eastbound within J20
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {FC575507-83DF-4E1D-B679-2FD5BD019314}
- Linear Element Type
- A Carriageway
- From Distance
- 267 m
- To Distance
- 412 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.334857 -0.300138 52.334682 -0.298949 52.334553 -0.298058
Segment 2
3 coordinate pairs- Description
- A14 eastbound within J20
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {3AE99A23-1681-475C-A2AC-ED3B3C43A7D3}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 348 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.334553 -0.298058 52.334055 -0.294702 52.333815 -0.293082
Segment 3
2 coordinate pairs- Description
- A14 eastbound between J20 and J21
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {11973C75-2E97-4F76-9B94-F78A6E5BFC0D}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 112 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.332529 -0.27979 52.332449 -0.278144
Segment 4
13 coordinate pairs- Description
- A14 eastbound between J20 and J21
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {B5F0037C-9ADE-4822-9405-0CF360D492A9}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 918 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.333815 -0.293082 52.333755 -0.292658 52.333367 -0.290046 52.333176 -0.288659 52.333103 -0.288001 52.33305 -0.287441 52.332912 -0.285983 52.33286 -0.285369 52.332826 -0.284974 52.332768 -0.284234 52.332674 -0.282734 52.332567 -0.28076 52.332529 -0.27979
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -0.300138, 52.334857
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.300138,
52.334857
],
[
-0.298949,
52.334682
],
[
-0.298058,
52.334553
],
[
-0.298058,
52.334553
],
[
-0.294702,
52.334055
],
[
-0.293082,
52.333815
],
[
-0.27979,
52.332529
],
[
-0.278144,
52.332449
],
[
-0.293082,
52.333815
],
[
-0.292658,
52.333755
],
[
-0.290046,
52.333367
],
[
-0.288659,
52.333176
],
[
-0.288001,
52.333103
],
[
-0.287441,
52.33305
],
[
-0.285983,
52.332912
],
[
-0.285369,
52.33286
],
[
-0.284974,
52.332826
],
[
-0.284234,
52.332768
],
[
-0.282734,
52.332674
],
[
-0.28076,
52.332567
],
[
-0.27979,
52.332529
]
]
]
}
View road section coordinates
[
[
[
-0.300138,
52.334857
],
[
-0.298949,
52.334682
],
[
-0.298058,
52.334553
],
[
-0.298058,
52.334553
],
[
-0.294702,
52.334055
],
[
-0.293082,
52.333815
],
[
-0.27979,
52.332529
],
[
-0.278144,
52.332449
],
[
-0.293082,
52.333815
],
[
-0.292658,
52.333755
],
[
-0.290046,
52.333367
],
[
-0.288659,
52.333176
],
[
-0.288001,
52.333103
],
[
-0.287441,
52.33305
],
[
-0.285983,
52.332912
],
[
-0.285369,
52.33286
],
[
-0.284974,
52.332826
],
[
-0.284234,
52.332768
],
[
-0.282734,
52.332674
],
[
-0.28076,
52.332567
],
[
-0.27979,
52.332529
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Sep 14, 2026 8:05 PM
- Record versioned
- Mon, Sep 14, 2026 11:31 PM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
Jct 7 exit slip road lane closure eastbound
Planned Roadworks National HighwaysExpected to clear in 15 minutes 49 seconds
Jct 7 exit slip road lane closure eastbound
A14 eastbound Jct 23 exit slip road lane 2 closure
Planned Roadworks National HighwaysStarts in 17 hours 15 minutes
A14 eastbound Jct 23 exit slip road lane 2 closure
A14 eastbound Jct 33 to Jct 34 lane 1 closure
Planned Roadworks National HighwaysStarts in 15 hours 15 minutes
A14 eastbound Jct 33 to Jct 34 lane 1 closure
A14 eastbound Jct 37 to Jct 38 lane closure
Planned Roadworks National HighwaysStarts in 15 hours 15 minutes
A14 eastbound Jct 37 to Jct 38 lane closure
A14 eastbound Girton to Histon lane 1 closure and lay-by closure (MP 96/6 to 97/4)
Planned Roadworks National HighwaysStarts in 15 hours 15 minutes
A14 eastbound Girton to Histon lane 1 closure and lay-by closure (MP 96/6 to 97/4)
A14 eastbound Jct 38 to Jct 39 lane closure
Planned Roadworks National HighwaysStarts in 15 hours 15 minutes
A14 eastbound Jct 38 to Jct 39 lane closure