A14 eastbound Jct 18 to Jct 20 lane closure (MP 63/6 to 65/0)
ClearedA14 eastbound Jct 18 to Jct 20 lane closure (MP 63/6 to 65/0)
- Start time
- Tue, Sep 22, 2026 8:11 PM
- Expected end
- Wed, Sep 23, 2026 5:00 AM
- Duration
- 5 hours 29 minutes 1 second
- Road
- A14 – A14 Eastbound Between J18 And J19A
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 2 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 22, 2026 8:11 PM
- Last updated
- Wed, Sep 23, 2026 1:22 AM
- Cleared
- Wed, Sep 23, 2026 1:40 AM
- Latest update: A14 eastbound Jct 18 to Jct 20 lane closure (MP 63/6 to 65/0)
- Coordinates
- 52.337132, -0.321535
- Latitude span
- 52.336471 – 52.338683
- Longitude span
- -0.331008 – -0.311236
- Bounding box centre
- 52.337577, -0.321122
- Location descriptions
-
- A14 eastbound between J18 and J19A
- A14 eastbound between J19A and J20
- Feed validity status
- Active
- Overall feed start
- Tue, Sep 22, 2026 8:11 PM
- Overall feed end
- Wed, Sep 23, 2026 5:00 AM
- Feed window length
- 8 hours 49 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
15 coordinate pairs- Description
- A14 eastbound between J18 and J19A
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {D1195050-BB4A-B3F8-1E2C-431A84C45093}
- Linear Element Type
- A Carriageway
- From Distance
- 909 m
- To Distance
- 1,425 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.338683 -0.331008 52.3384 -0.330101 52.338268 -0.329681 52.338117 -0.329158 52.33786 -0.328184 52.337765 -0.327802 52.337707 -0.327573 52.337563 -0.326874 52.337505 -0.326598 52.337447 -0.326306 52.337289 -0.325314 52.337239 -0.324964 52.337199 -0.324672 52.337157 -0.324233 52.337125 -0.323926
Segment 2
10 coordinate pairs- Description
- A14 eastbound between J19A and J20
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {E329190F-8618-4D86-8BBD-6B751476C73B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 527 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.336749 -0.318949 52.336749 -0.318303 52.336747 -0.316909 52.336748 -0.316366 52.336714 -0.315237 52.336661 -0.313534 52.33665 -0.31327 52.336592 -0.312515 52.336491 -0.311432 52.336471 -0.311236
Segment 3
7 coordinate pairs- Description
- A14 eastbound between J19A and J20
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {3967DBA5-154A-44E1-9DCD-38A0A99CB3F5}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 84 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.336784 -0.320181 52.336759 -0.319639 52.336754 -0.319316 52.336753 -0.319243 52.336751 -0.319125 52.336749 -0.318993 52.336749 -0.318949
Segment 4
4 coordinate pairs- Description
- A14 eastbound between J18 and J19A
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {18385247-695F-4FA4-882C-F8533063A1E5}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 258 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.337125 -0.323926 52.336862 -0.321205 52.336796 -0.320357 52.336784 -0.320181
- Geometry type
- MultiLineString
- Geometry points
- 36
- First coordinate pair
- -0.331008, 52.338683
- Road section segments
- 1
- Road section points
- 36
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.331008,
52.338683
],
[
-0.330101,
52.3384
],
[
-0.329681,
52.338268
],
[
-0.329158,
52.338117
],
[
-0.328184,
52.33786
],
[
-0.327802,
52.337765
],
[
-0.327573,
52.337707
],
[
-0.326874,
52.337563
],
[
-0.326598,
52.337505
],
[
-0.326306,
52.337447
],
[
-0.325314,
52.337289
],
[
-0.324964,
52.337239
],
[
-0.324672,
52.337199
],
[
-0.324233,
52.337157
],
[
-0.323926,
52.337125
],
[
-0.318949,
52.336749
],
[
-0.318303,
52.336749
],
[
-0.316909,
52.336747
],
[
-0.316366,
52.336748
],
[
-0.315237,
52.336714
],
[
-0.313534,
52.336661
],
[
-0.31327,
52.33665
],
[
-0.312515,
52.336592
],
[
-0.311432,
52.336491
],
[
-0.311236,
52.336471
],
[
-0.320181,
52.336784
],
[
-0.319639,
52.336759
],
[
-0.319316,
52.336754
],
[
-0.319243,
52.336753
],
[
-0.319125,
52.336751
],
[
-0.318993,
52.336749
],
[
-0.318949,
52.336749
],
[
-0.323926,
52.337125
],
[
-0.321205,
52.336862
],
[
-0.320357,
52.336796
],
[
-0.320181,
52.336784
]
]
]
}
View road section coordinates
[
[
[
-0.331008,
52.338683
],
[
-0.330101,
52.3384
],
[
-0.329681,
52.338268
],
[
-0.329158,
52.338117
],
[
-0.328184,
52.33786
],
[
-0.327802,
52.337765
],
[
-0.327573,
52.337707
],
[
-0.326874,
52.337563
],
[
-0.326598,
52.337505
],
[
-0.326306,
52.337447
],
[
-0.325314,
52.337289
],
[
-0.324964,
52.337239
],
[
-0.324672,
52.337199
],
[
-0.324233,
52.337157
],
[
-0.323926,
52.337125
],
[
-0.318949,
52.336749
],
[
-0.318303,
52.336749
],
[
-0.316909,
52.336747
],
[
-0.316366,
52.336748
],
[
-0.315237,
52.336714
],
[
-0.313534,
52.336661
],
[
-0.31327,
52.33665
],
[
-0.312515,
52.336592
],
[
-0.311432,
52.336491
],
[
-0.311236,
52.336471
],
[
-0.320181,
52.336784
],
[
-0.319639,
52.336759
],
[
-0.319316,
52.336754
],
[
-0.319243,
52.336753
],
[
-0.319125,
52.336751
],
[
-0.318993,
52.336749
],
[
-0.318949,
52.336749
],
[
-0.323926,
52.337125
],
[
-0.321205,
52.336862
],
[
-0.320357,
52.336796
],
[
-0.320181,
52.336784
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 22, 2026 8:11 PM
- Record versioned
- Wed, Sep 23, 2026 1:22 AM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 23 exit slip road lane 2 closure
Planned Roadworks National HighwaysStarts in 4 hours 11 minutes
A14 eastbound Jct 23 exit slip road lane 2 closure
A1(M) both directions Jct 14 to 17 mobile lane 3 closure
Cleared Roadworks National HighwaysExpected to clear in 11 hours 11 minutes
A1(M) both directions Jct 14 to 17 mobile lane 3 closure
A141 eastbound A14 Jct 21 to Brampton Hut roundabout carriageway closure
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
A141 eastbound A14 Jct 21 to Brampton Hut roundabout carriageway closure
A14 westbound Jct 61 entry slip road - carriageway closure
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
A14 westbound Jct 61 entry slip road - carriageway closure
A14 westbound Jct 55 exit slip carriageway closure
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
A14 westbound Jct 55 exit slip carriageway closure
A141 westbound Brampton Hut roundabout to New Ellington East roundabout lane 2 closure
Planned Roadworks National HighwaysStarts in 2 hours 11 minutes
A141 westbound Brampton Hut roundabout to New Ellington East roundabout lane 2 closure