A14 both directions Jct 37 lane 1 closure (MP 117/6 to 119/5)
ClearedA14 both directions Jct 37 lane 1 closure (MP 117/6 to 119/5)
- Start time
- Mon, Jun 15, 2026 7:00 PM
- Expected end
- Tue, Jun 16, 2026 5:00 AM
- Duration
- 1 second
- Road
- A14 – A14 Eastbound Between J36 And J37
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jun 15, 2026 3:43 PM
- Last updated
- Mon, Jun 15, 2026 6:33 PM
- Cleared
- Mon, Jun 15, 2026 7:00 PM
- Latest update: A14 both directions Jct 37 lane 1 closure (MP 117/6 to 119/5)
- Coordinates
- 52.250094, 0.363225
- Latitude span
- 52.245149 – 52.257559
- Longitude span
- 0.353849 – 0.371757
- Bounding box centre
- 52.251354, 0.362803
- Location descriptions
-
- A14 eastbound between J36 and J37
- Feed validity status
- Planned
- Overall feed start
- Mon, Jun 15, 2026 7:00 PM
- Overall feed end
- Tue, Jun 16, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- A14 eastbound between J36 and J37
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {0764FBE5-A27B-400F-83A1-43F7BA657A51}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 135 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.249219 0.362985 52.249401 0.363284 52.249671 0.363694 52.250118 0.364304 52.250127 0.364315
Segment 2
15 coordinate pairs- Description
- A14 eastbound between J36 and J37
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {6FF480EA-94EE-410C-AECC-8139021207F4}
- Linear Element Type
- A Carriageway
- From Distance
- 817 m
- To Distance
- 1,592 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.245149 0.353849 52.245282 0.35429 52.245681 0.355498 52.245876 0.35605 52.246175 0.356872 52.246406 0.357455 52.24674 0.358293 52.247101 0.359118 52.247239 0.359419 52.247593 0.360155 52.247948 0.360833 52.248478 0.361769 52.24853 0.361861 52.248887 0.362436 52.249219 0.362985
Segment 3
14 coordinate pairs- Description
- A14 eastbound between J36 and J37
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {B03CE4E3-53B3-4077-A0EF-EB54221F6737}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 972 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.250127 0.364315 52.250486 0.364763 52.250758 0.365114 52.251257 0.365756 52.251847 0.366418 52.252463 0.36708 52.25308 0.367685 52.253319 0.367903 52.253711 0.36826 52.254087 0.368603 52.25625 0.370579 52.256613 0.370891 52.2568 0.371063 52.257559 0.371757
- Geometry type
- MultiLineString
- Geometry points
- 34
- First coordinate pair
- 0.362985, 52.249219
- Road section segments
- 1
- Road section points
- 34
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.362985,
52.249219
],
[
0.363284,
52.249401
],
[
0.363694,
52.249671
],
[
0.364304,
52.250118
],
[
0.364315,
52.250127
],
[
0.353849,
52.245149
],
[
0.35429,
52.245282
],
[
0.355498,
52.245681
],
[
0.35605,
52.245876
],
[
0.356872,
52.246175
],
[
0.357455,
52.246406
],
[
0.358293,
52.24674
],
[
0.359118,
52.247101
],
[
0.359419,
52.247239
],
[
0.360155,
52.247593
],
[
0.360833,
52.247948
],
[
0.361769,
52.248478
],
[
0.361861,
52.24853
],
[
0.362436,
52.248887
],
[
0.362985,
52.249219
],
[
0.364315,
52.250127
],
[
0.364763,
52.250486
],
[
0.365114,
52.250758
],
[
0.365756,
52.251257
],
[
0.366418,
52.251847
],
[
0.36708,
52.252463
],
[
0.367685,
52.25308
],
[
0.367903,
52.253319
],
[
0.36826,
52.253711
],
[
0.368603,
52.254087
],
[
0.370579,
52.25625
],
[
0.370891,
52.256613
],
[
0.371063,
52.2568
],
[
0.371757,
52.257559
]
]
]
}
View road section coordinates
[
[
[
0.362985,
52.249219
],
[
0.363284,
52.249401
],
[
0.363694,
52.249671
],
[
0.364304,
52.250118
],
[
0.364315,
52.250127
],
[
0.353849,
52.245149
],
[
0.35429,
52.245282
],
[
0.355498,
52.245681
],
[
0.35605,
52.245876
],
[
0.356872,
52.246175
],
[
0.357455,
52.246406
],
[
0.358293,
52.24674
],
[
0.359118,
52.247101
],
[
0.359419,
52.247239
],
[
0.360155,
52.247593
],
[
0.360833,
52.247948
],
[
0.361769,
52.248478
],
[
0.361861,
52.24853
],
[
0.362436,
52.248887
],
[
0.362985,
52.249219
],
[
0.364315,
52.250127
],
[
0.364763,
52.250486
],
[
0.365114,
52.250758
],
[
0.365756,
52.251257
],
[
0.366418,
52.251847
],
[
0.36708,
52.252463
],
[
0.367685,
52.25308
],
[
0.367903,
52.253319
],
[
0.36826,
52.253711
],
[
0.368603,
52.254087
],
[
0.370579,
52.25625
],
[
0.370891,
52.256613
],
[
0.371063,
52.2568
],
[
0.371757,
52.257559
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jun 15, 2026 3:43 PM
- Record versioned
- Mon, Jun 15, 2026 6:33 PM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 23 to Jct 24 lane 1,2 closures (MP 76/8A to 81/1)
Active Roadworks National HighwaysExpected to clear in 9 hours 2 minutes
A14 eastbound Jct 23 to Jct 24 lane 1,2 closures (MP 76/8A to 81/1)
A14 eastbound approach to New Ellington lane closure
Planned Roadworks National HighwaysStarts in 2 minutes 9 seconds
A14 eastbound approach to New Ellington lane closure
A14 eastbound Jct 44 to Jct 46 lane closure (MP 147/8 to 152/4)
Planned Roadworks National HighwaysStarts in 2 minutes 9 seconds
A14 eastbound Jct 44 to Jct 46 lane closure (MP 147/8 to 152/4)
A14 eastbound Jct 23 entry slip road closure
Cleared Roadworks National HighwaysCleared 57 minutes 49 seconds ago
A14 eastbound Jct 23 entry slip road closure
A14 eastbound Jct 23 to Jct 24 lane 1,2 closures (MP 76/8A to 81/1)
Cleared Roadworks National HighwaysCleared 2 minutes 48 seconds ago
A14 eastbound Jct 23 to Jct 24 lane 1,2 closures (MP 76/8A to 81/1)
A14 eastbound Jct 36 lane 1 closure (MP 113/6 to 114/7)
Cleared Roadworks National HighwaysCleared 57 minutes 49 seconds ago
A14 eastbound Jct 36 lane 1 closure (MP 113/6 to 114/7)