A120 eastbound approach to Priory Wood Roundabout exit slip lane closure
PlannedA120 eastbound approach to Priory Wood Roundabout exit slip lane closure
- Start time
- Fri, Aug 7, 2026 8:00 PM
- Expected end
- Sat, Aug 8, 2026 4:00 AM
- Duration
- 8 hours
- Road
- M11 – Link Road From M11 J8A Northbound To A120 Eastbound
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 2 lanes affected, 1 of 1 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 7, 2026 2:55 AM
- Last updated
- Fri, Aug 7, 2026 4:33 AM
- Cleared
- Sat, Aug 8, 2026 4:00 AM
- Latest update: A120 eastbound approach to Priory Wood Roundabout exit slip lane closure
- Coordinates
- 51.875188, 0.207549
- Latitude span
- 51.873417 – 51.876364
- Longitude span
- 0.204583 – 0.210358
- Bounding box centre
- 51.874891, 0.207471
- Location descriptions
-
- link road from M11 J8a northbound to A120 eastbound
- connector at A120/M11 J8
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 7, 2026 8:00 PM
- Overall feed end
- Sat, Aug 8, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- link road from M11 J8a northbound to A120 eastbound
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M11
- Linear Element Model
- The Network Model
- Linear Element Id
- {5736632E-6829-4DA6-88A1-94D89C095151}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 117 m
- To Distance
- 200 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.876364 0.204583 51.876343 0.20511 51.876262 0.205673 51.876255 0.205697 51.876239 0.205765
Segment 2
16 coordinate pairs- Description
- connector at A120/M11 J8
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M11
- Linear Element Model
- The Network Model
- Linear Element Id
- {A2E229F8-2F51-4A1A-93E0-B0593D933934}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 453 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.876239 0.205765 51.876156 0.206121 51.876051 0.206475 51.875858 0.206938 51.875627 0.207341 51.875274 0.207826 51.875215 0.2079 51.875132 0.208004 51.87489 0.208272 51.874535 0.208663 51.874169 0.209073 51.874043 0.209251 51.873836 0.209554 51.873595 0.209957 51.873456 0.210211 51.873417 0.210358
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- 0.204583, 51.876364
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.204583,
51.876364
],
[
0.20511,
51.876343
],
[
0.205673,
51.876262
],
[
0.205697,
51.876255
],
[
0.205765,
51.876239
],
[
0.205765,
51.876239
],
[
0.206121,
51.876156
],
[
0.206475,
51.876051
],
[
0.206938,
51.875858
],
[
0.207341,
51.875627
],
[
0.207826,
51.875274
],
[
0.2079,
51.875215
],
[
0.208004,
51.875132
],
[
0.208272,
51.87489
],
[
0.208663,
51.874535
],
[
0.209073,
51.874169
],
[
0.209251,
51.874043
],
[
0.209554,
51.873836
],
[
0.209957,
51.873595
],
[
0.210211,
51.873456
],
[
0.210358,
51.873417
]
]
]
}
View road section coordinates
[
[
[
0.204583,
51.876364
],
[
0.20511,
51.876343
],
[
0.205673,
51.876262
],
[
0.205697,
51.876255
],
[
0.205765,
51.876239
],
[
0.205765,
51.876239
],
[
0.206121,
51.876156
],
[
0.206475,
51.876051
],
[
0.206938,
51.875858
],
[
0.207341,
51.875627
],
[
0.207826,
51.875274
],
[
0.2079,
51.875215
],
[
0.208004,
51.875132
],
[
0.208272,
51.87489
],
[
0.208663,
51.874535
],
[
0.209073,
51.874169
],
[
0.209251,
51.874043
],
[
0.209554,
51.873836
],
[
0.209957,
51.873595
],
[
0.210211,
51.873456
],
[
0.210358,
51.873417
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 7, 2026 2:55 AM
- Record versioned
- Fri, Aug 7, 2026 4:33 AM
- Coordinate source
- Geometry
Driving on the M11? See every live closure, roadwork and planned restriction on this road.
M11 live closuresRelated incidents
M11 southbound Jct 11 hard shoulder closure (MP 83/4 to 81/8)
Planned Roadworks National HighwaysExpected to clear in 7 months 3 weeks
M11 southbound Jct 11 hard shoulder closure (MP 83/4 to 81/8)
M11 northbound Jct 6 to Jct 7 mobile hard shoulder closure and lane 2 and 3 closure
Planned Roadworks National HighwaysStarts in 15 hours 24 minutes
M11 northbound Jct 6 to Jct 7 mobile hard shoulder closure and lane 2 and 3 closure
A120 both directions Bishops Stortford to Braintree mobile lane closures (MP 18/6 to 42/2)
Planned Roadworks National HighwaysStarts in 14 hours 24 minutes
A120 both directions Bishops Stortford to Braintree mobile lane closures (MP 18/6 to 42/2)
M11 Southbound, Jct 6 to Jct 5, Lane 1,2 closure
Cleared Roadworks National HighwaysCleared 2 hours 55 minutes ago
M11 Southbound, Jct 6 to Jct 5, Lane 1,2 closure
M11 northbound Jct 6 to Jct 7 mobile hard shoulder closure and lane 2 and 3 closure
Cleared Roadworks National HighwaysCleared 5 hours 35 minutes ago
M11 northbound Jct 6 to Jct 7 mobile hard shoulder closure and lane 2 and 3 closure
M11 northbound Jct 8 to Jct 9 mobile hard shoulder closure and lane 2 and 3 closure
Cleared Roadworks National HighwaysCleared 8 hours 35 minutes ago
M11 northbound Jct 8 to Jct 9 mobile hard shoulder closure and lane 2 and 3 closure