A12 northbound Jct 29 lane 1 closure
ClearedA12 northbound Jct 29 lane 1 closure
- Start time
- Thu, Feb 5, 2026 9:00 PM
- Expected end
- Fri, Feb 6, 2026 5:00 AM
- Duration
- 8 hours
- Road
- A12 – A12 Northbound Between A120 Near Colchester (East) And B1029
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jan 23, 2026 3:55 PM
- Last updated
- Wed, Feb 4, 2026 11:36 PM
- Cleared
- Fri, Feb 6, 2026 5:00 AM
- Latest update: A12 northbound Jct 29 lane 1 closure
- Coordinates
- 51.970195, 0.980721
- Latitude span
- 51.967868 – 51.971303
- Longitude span
- 0.976996 – 0.982482
- Bounding box centre
- 51.969586, 0.979739
- Location descriptions
-
- A12 northbound between A120 near Colchester (east) and B1029
- A12 northbound within the B1029 junction
- Feed validity status
- Planned
- Overall feed start
- Thu, Feb 5, 2026 9:00 PM
- Overall feed end
- Fri, Feb 6, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A12 northbound between A120 near Colchester (east) and B1029
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A12
- Linear Element Model
- The Network Model
- Linear Element Id
- {0710D061-799A-481F-B930-D3EFEE8BA2A7}
- Linear Element Type
- A Carriageway
- From Distance
- 690 m
- To Distance
- 1,175 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.967868 0.976996 51.969095 0.978978 51.969924 0.980324 51.97097 0.98195
Segment 2
3 coordinate pairs- Description
- A12 northbound within the B1029 junction
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A12
- Linear Element Model
- The Network Model
- Linear Element Id
- {C12D03F2-B694-47E7-BFCC-F52D197C2D59}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 52 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.97097 0.98195 51.971233 0.982368 51.971303 0.982482
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- 0.976996, 51.967868
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.976996,
51.967868
],
[
0.978978,
51.969095
],
[
0.980324,
51.969924
],
[
0.98195,
51.97097
],
[
0.98195,
51.97097
],
[
0.982368,
51.971233
],
[
0.982482,
51.971303
]
]
]
}
View road section coordinates
[
[
[
0.976996,
51.967868
],
[
0.978978,
51.969095
],
[
0.980324,
51.969924
],
[
0.98195,
51.97097
],
[
0.98195,
51.97097
],
[
0.982368,
51.971233
],
[
0.982482,
51.971303
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Colchester
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Jan 23, 2026 3:55 PM
- Record versioned
- Wed, Feb 4, 2026 11:36 PM
- Coordinate source
- Geometry
Driving on the A12? See every live closure, roadwork and planned restriction on this road.
A12 live closuresRelated incidents
A120 eastbound Ardleigh to Bromley lane closure (MP 153/6 to 154/6)
Planned Roadworks National HighwaysStarts in 4 hours 35 minutes
A120 eastbound Ardleigh to Bromley lane closure (MP 153/6 to 154/6)
A12 northbound Jct 11 to Jct 12 lane 2 closure
Cleared Roadworks National HighwaysCleared 10 hours 24 minutes ago
A12 northbound Jct 11 to Jct 12 lane 2 closure
A12 northbound Jct 15 to Jct 19 carriageway closure
Cleared Roadworks National HighwaysCleared 10 hours 24 minutes ago
A12 northbound Jct 15 to Jct 19 carriageway closure
A12 northbound Ipswich Road exit slip carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 10 hours ago
A12 northbound Ipswich Road exit slip carriageway closure
A12 northbound Jct 28 exit slip carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 15 hours ago
A12 northbound Jct 28 exit slip carriageway closure
A12 northbound Jct 28 entry slip carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 18 hours ago
A12 northbound Jct 28 entry slip carriageway closure