M62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (105/0 - 106/6)
PlannedM62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (105/0 - 106/6)
- Start time
- Fri, Mar 13, 2026 9:00 PM
- Expected end
- Sat, Mar 14, 2026 5:00 AM
- Duration
- 8 hours
- Road
- M62 – M62 Eastbound Within J27
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Litter Clearance
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Mar 13, 2026 11:02 AM
- Last updated
- Fri, Mar 13, 2026 3:20 PM
- Cleared
- Sat, Mar 14, 2026 5:00 AM
- Latest update: M62 eastbound Jct 26 to Jct 27 Lane 1 and 2 closure (105/0 - 106/6)
- Coordinates
- 53.745386, -1.655918
- Latitude span
- 53.743340 – 53.746920
- Longitude span
- -1.668572 – -1.646260
- Bounding box centre
- 53.745130, -1.657416
- Location descriptions
-
- M62 eastbound within J27
- M62 eastbound between J26 and J27
- Feed validity status
- Planned
- Overall feed start
- Fri, Mar 13, 2026 9:00 PM
- Overall feed end
- Sat, Mar 14, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M62 eastbound within J27
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {80AB58EA-DDA7-4A55-B697-A687B53EFC1A}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 309 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.746234 -1.650801 53.746464 -1.64912 53.746493 -1.648938 53.746856 -1.64666 53.74692 -1.64626
Segment 2
3 coordinate pairs- Description
- M62 eastbound between J26 and J27
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {89CDAD06-3976-4624-8360-BDDCA99DAD75}
- Linear Element Type
- A Carriageway
- From Distance
- 172 m
- To Distance
- 580 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.74334 -1.668572 53.743443 -1.667916 53.7443 -1.662602
Segment 3
6 coordinate pairs- Description
- M62 eastbound between J26 and J27
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {A217E378-BCD6-4C7D-960B-74DAA02D5BD6}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 807 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.7443 -1.662602 53.744641 -1.66064 53.745017 -1.658317 53.745417 -1.655832 53.745739 -1.653794 53.746234 -1.650801
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -1.650801, 53.746234
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.650801,
53.746234
],
[
-1.64912,
53.746464
],
[
-1.648938,
53.746493
],
[
-1.64666,
53.746856
],
[
-1.64626,
53.74692
],
[
-1.668572,
53.74334
],
[
-1.667916,
53.743443
],
[
-1.662602,
53.7443
],
[
-1.662602,
53.7443
],
[
-1.66064,
53.744641
],
[
-1.658317,
53.745017
],
[
-1.655832,
53.745417
],
[
-1.653794,
53.745739
],
[
-1.650801,
53.746234
]
]
]
}
View road section coordinates
[
[
[
-1.650801,
53.746234
],
[
-1.64912,
53.746464
],
[
-1.648938,
53.746493
],
[
-1.64666,
53.746856
],
[
-1.64626,
53.74692
],
[
-1.668572,
53.74334
],
[
-1.667916,
53.743443
],
[
-1.662602,
53.7443
],
[
-1.662602,
53.7443
],
[
-1.66064,
53.744641
],
[
-1.658317,
53.745017
],
[
-1.655832,
53.745417
],
[
-1.653794,
53.745739
],
[
-1.650801,
53.746234
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Litter Clearance
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Fri, Mar 13, 2026 11:02 AM
- Record versioned
- Fri, Mar 13, 2026 3:20 PM
- Coordinate source
- Geometry
Related incidents
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned National HighwaysM62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active National HighwaysM62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active National HighwaysM62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned National HighwaysM62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned National HighwaysM62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned National HighwaysM62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)