M61 Southbound lane 1 closure (MP 14/2 to 13/4)
ClearedM61 Southbound lane 1 closure (MP 14/2 to 13/4)
- Start time
- Mon, Apr 27, 2026 7:05 PM
- Expected end
- Tue, Apr 28, 2026 5:00 AM
- Duration
- 9 hours 55 minutes
- Road
- M61 – M61 Southbound Between J6 And J5
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Apr 27, 2026 7:05 PM
- Last updated
- Mon, Apr 27, 2026 11:41 PM
- Cleared
- Tue, Apr 28, 2026 5:00 AM
- Latest update: M61 Southbound lane 1 closure (MP 14/2 to 13/4)
- Coordinates
- 53.566355, -2.526579
- Latitude span
- 53.564833 – 53.567988
- Longitude span
- -2.531437 – -2.521607
- Bounding box centre
- 53.566411, -2.526522
- Location descriptions
-
- M61 southbound between J6 and J5
- Feed validity status
- Active
- Overall feed start
- Mon, Apr 27, 2026 7:05 PM
- Overall feed end
- Tue, Apr 28, 2026 5:00 AM
- Feed window length
- 9 hours 55 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- M61 southbound between J6 and J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M61
- Linear Element Model
- The Network Model
- Linear Element Id
- {6EBF3B0E-BBB5-435F-B70E-4F4DFA42CE1C}
- Linear Element Type
- B Carriageway
- From Distance
- 318 m
- To Distance
- 854 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.567988 -2.531437 53.567938 -2.531307 53.56745 -2.529973 53.567441 -2.529942 53.567255 -2.529426 53.566563 -2.527379 53.56611 -2.525985 53.566004 -2.525651 53.565623 -2.524378
Segment 2
5 coordinate pairs- Description
- M61 southbound between J6 and J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M61
- Linear Element Model
- The Network Model
- Linear Element Id
- {0212785E-B25B-4A95-95FD-7C3D40303D49}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 203 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.565623 -2.524378 53.56562 -2.524366 53.565481 -2.523908 53.565039 -2.522363 53.564833 -2.521607
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -2.531437, 53.567988
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.531437,
53.567988
],
[
-2.531307,
53.567938
],
[
-2.529973,
53.56745
],
[
-2.529942,
53.567441
],
[
-2.529426,
53.567255
],
[
-2.527379,
53.566563
],
[
-2.525985,
53.56611
],
[
-2.525651,
53.566004
],
[
-2.524378,
53.565623
],
[
-2.524378,
53.565623
],
[
-2.524366,
53.56562
],
[
-2.523908,
53.565481
],
[
-2.522363,
53.565039
],
[
-2.521607,
53.564833
]
]
]
}
View road section coordinates
[
[
[
-2.531437,
53.567988
],
[
-2.531307,
53.567938
],
[
-2.529973,
53.56745
],
[
-2.529942,
53.567441
],
[
-2.529426,
53.567255
],
[
-2.527379,
53.566563
],
[
-2.525985,
53.56611
],
[
-2.525651,
53.566004
],
[
-2.524378,
53.565623
],
[
-2.524378,
53.565623
],
[
-2.524366,
53.56562
],
[
-2.523908,
53.565481
],
[
-2.522363,
53.565039
],
[
-2.521607,
53.564833
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 9
- Record created
- Mon, Apr 27, 2026 7:05 PM
- Record versioned
- Mon, Apr 27, 2026 11:41 PM
- Coordinate source
- Geometry
Related incidents
M61 North & Southbound mobile hardshoulder closure from M60 - M6
Active National HighwaysM61 North & Southbound mobile hardshoulder closure from M60 - M6
M61 Southbound lane 1 closure (MP 17/4 to 15/6)
Planned National HighwaysM61 Southbound lane 1 closure (MP 17/4 to 15/6)
M61 Southbound Jct 6 exit slip road lane 2 closure
Planned National HighwaysM61 Southbound Jct 6 exit slip road lane 2 closure
M61 Southbound Jct 6 exit slip road lane 2 closure
Planned National HighwaysM61 Southbound Jct 6 exit slip road lane 2 closure
M61 Southbound Jct 6 exit slip road lane 2 closure
Planned National HighwaysM61 Southbound Jct 6 exit slip road lane 2 closure
M61 Southbound Lane 3 closure (MP 15/5 to 11/4)
Planned National HighwaysM61 Southbound Lane 3 closure (MP 15/5 to 11/4)