M60 anticlockwise jct 7 - 5 lane two and three closure (MP 14/1 - 12/6)
PlannedM60 anticlockwise jct 7 - 5 lane two and three closure (MP 14/1 - 12/6)
- Start time
- Tue, Dec 16, 2025 12:45 AM
- Expected end
- Tue, Dec 16, 2025 5:00 AM
- Duration
- 4 hours 15 minutes
- Road
- M60 – M60 Anti-Clockwise Between J9 And J8
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Nov 10, 2025 9:58 AM
- Last updated
- Mon, Dec 15, 2025 9:15 PM
- Cleared
- Tue, Dec 16, 2025 5:00 AM
- Latest update: M60 anticlockwise jct 7 - 5 lane two and three closure (MP 14/1 - 12/6)
- Coordinates
- 53.444770, -2.339239
- Latitude span
- 53.442426 – 53.446904
- Longitude span
- -2.339902 – -2.337702
- Bounding box centre
- 53.444665, -2.338802
- Location descriptions
-
- M60 anti-clockwise between J9 and J8
- M60 anti-clockwise within J8
- Feed validity status
- Planned
- Overall feed start
- Tue, Dec 16, 2025 12:45 AM
- Overall feed end
- Tue, Dec 16, 2025 5:00 AM
- Feed window length
- 4 hours 15 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M60 anti-clockwise between J9 and J8
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {2945EB06-758D-45AE-A9F1-16DE6C578DCF}
- Linear Element Type
- B Carriageway
- From Distance
- 240 m
- To Distance
- 266 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.446904 -2.339897 53.446797 -2.339902 53.446671 -2.339901
Segment 2
8 coordinate pairs- Description
- M60 anti-clockwise between J9 and J8
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {C73E2E87-9BEB-4C33-84E3-2ABECF2FFCE2}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 306 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.446671 -2.339901 53.44611 -2.339893 53.445835 -2.339842 53.445583 -2.339796 53.445148 -2.339656 53.444864 -2.339542 53.444354 -2.339291 53.443983 -2.339064
Segment 3
7 coordinate pairs- Description
- M60 anti-clockwise within J8
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {2F554FDC-9C6C-48E1-BBEF-2DDBBF7492BA}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 196 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.443983 -2.339064 53.443717 -2.338916 53.443658 -2.33887 53.443338 -2.338617 53.442996 -2.338313 53.442813 -2.338133 53.442426 -2.337702
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- -2.339897, 53.446904
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.339897,
53.446904
],
[
-2.339902,
53.446797
],
[
-2.339901,
53.446671
],
[
-2.339901,
53.446671
],
[
-2.339893,
53.44611
],
[
-2.339842,
53.445835
],
[
-2.339796,
53.445583
],
[
-2.339656,
53.445148
],
[
-2.339542,
53.444864
],
[
-2.339291,
53.444354
],
[
-2.339064,
53.443983
],
[
-2.339064,
53.443983
],
[
-2.338916,
53.443717
],
[
-2.33887,
53.443658
],
[
-2.338617,
53.443338
],
[
-2.338313,
53.442996
],
[
-2.338133,
53.442813
],
[
-2.337702,
53.442426
]
]
]
}
View road section coordinates
[
[
[
-2.339897,
53.446904
],
[
-2.339902,
53.446797
],
[
-2.339901,
53.446671
],
[
-2.339901,
53.446671
],
[
-2.339893,
53.44611
],
[
-2.339842,
53.445835
],
[
-2.339796,
53.445583
],
[
-2.339656,
53.445148
],
[
-2.339542,
53.444864
],
[
-2.339291,
53.444354
],
[
-2.339064,
53.443983
],
[
-2.339064,
53.443983
],
[
-2.338916,
53.443717
],
[
-2.33887,
53.443658
],
[
-2.338617,
53.443338
],
[
-2.338313,
53.442996
],
[
-2.338133,
53.442813
],
[
-2.337702,
53.442426
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Nov 10, 2025 9:58 AM
- Record versioned
- Mon, Dec 15, 2025 9:15 PM
- Coordinate source
- Geometry
Related incidents
M60 clockwise jct 19 entry slip road closure
Planned National HighwaysM60 clockwise jct 19 entry slip road closure
M60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
Planned National HighwaysM60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
M60 Clockwise Jct 22 exit slip road Lane closure
Planned National HighwaysM60 Clockwise Jct 22 exit slip road Lane closure
Mobile hardshoulder closure Clockwise and Anticlockwise
Active National HighwaysMobile hardshoulder closure Clockwise and Anticlockwise
M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
Cleared National HighwaysM60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
M60 Clockwise Jct 22 exit slip road Lane closure
Planned National HighwaysM60 Clockwise Jct 22 exit slip road Lane closure