M40 southbound, Jct 9 to Jct 8a, hard shoulder closure
ClearedM40 southbound, Jct 9 to Jct 8a, hard shoulder closure
- Start time
- Fri, May 22, 2026 6:00 AM
- Expected end
- Fri, May 22, 2026 6:00 PM
- Duration
- 12 hours
- Road
- M40 – M40 Southbound Between J9 And J8A
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, May 20, 2026 12:46 PM
- Last updated
- Fri, May 22, 2026 5:49 PM
- Cleared
- Fri, May 22, 2026 6:00 PM
- Latest update: M40 southbound, Jct 9 to Jct 8a, hard shoulder closure
- Coordinates
- 51.744316, -1.099790
- Latitude span
- 51.743148 – 51.746098
- Longitude span
- -1.101367 – -1.098701
- Bounding box centre
- 51.744623, -1.100034
- Location descriptions
-
- M40 southbound between J9 and J8A
- M40 southbound within J8A
- Feed validity status
- Suspended
- Overall feed start
- Fri, May 22, 2026 6:00 AM
- Overall feed end
- Fri, May 22, 2026 6:00 PM
- Feed window length
- 12 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M40 southbound between J9 and J8A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {97230C1A-00BF-4E14-8292-1459280F31E6}
- Linear Element Type
- B Carriageway
- From Distance
- 900 m
- To Distance
- 1,234 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.746098 -1.101367 51.745276 -1.100683 51.744871 -1.100329 51.744416 -1.099932 51.743755 -1.099293 51.743483 -1.099009
Segment 2
2 coordinate pairs- Description
- M40 southbound within J8A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {80128F11-2B65-42BA-B292-0393122F38CA}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 42 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.743483 -1.099009 51.743148 -1.098701
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.101367, 51.746098
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.101367,
51.746098
],
[
-1.100683,
51.745276
],
[
-1.100329,
51.744871
],
[
-1.099932,
51.744416
],
[
-1.099293,
51.743755
],
[
-1.099009,
51.743483
],
[
-1.099009,
51.743483
],
[
-1.098701,
51.743148
]
]
]
}
View road section coordinates
[
[
[
-1.101367,
51.746098
],
[
-1.100683,
51.745276
],
[
-1.100329,
51.744871
],
[
-1.099932,
51.744416
],
[
-1.099293,
51.743755
],
[
-1.099009,
51.743483
],
[
-1.099009,
51.743483
],
[
-1.098701,
51.743148
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Suspended
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, May 20, 2026 12:46 PM
- Record versioned
- Fri, May 22, 2026 5:49 PM
- Coordinate source
- Geometry
Related incidents
M40 Northbound Jct 8a to Jct 10 lane 3 closure.
Planned National HighwaysM40 Northbound Jct 8a to Jct 10 lane 3 closure.
M40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure
Planned National HighwaysM40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure
M40 Southbound Jct 7 to Jct 5 lane 3 and lane 2 closures
Planned National HighwaysM40 Southbound Jct 7 to Jct 5 lane 3 and lane 2 closures
M40 southbound, Jct 11 to Jct 10, lane 3 and 2 closure
Planned National HighwaysM40 southbound, Jct 11 to Jct 10, lane 3 and 2 closure
Lanes 2 and 3 closure southbound
Planned National HighwaysLanes 2 and 3 closure southbound
M40 Northbound Jct 4 to Jct 5 hard shoulder closure
Planned National HighwaysM40 Northbound Jct 4 to Jct 5 hard shoulder closure