M40 Southbound Jct 7 exit slip road closure
PlannedM40 Southbound Jct 7 exit slip road closure
- Start time
- Thu, Nov 13, 2025 10:15 PM
- Expected end
- Fri, Nov 14, 2025 6:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M40 – M40 Southbound Between J8 And J7
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jun 30, 2025 2:30 PM
- Last updated
- Thu, Nov 13, 2025 11:24 PM
- Cleared
- Fri, Nov 14, 2025 6:00 AM
- Latest update: M40 Southbound Jct 7 exit slip road closure
- Coordinates
- 51.726225, -1.061302
- Latitude span
- 51.725581 – 51.726917
- Longitude span
- -1.063005 – -1.059473
- Bounding box centre
- 51.726249, -1.061239
- Location descriptions
-
- M40 southbound between J8 and J7
- Feed validity status
- Planned
- Overall feed start
- Thu, Nov 13, 2025 10:15 PM
- Overall feed end
- Fri, Nov 14, 2025 6:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 southbound between J8 and J7
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {B22F70F6-E542-4C2F-B0A1-B3E22A364647}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 171 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.72632 -1.061653 51.726093 -1.061016 51.725863 -1.060306 51.725581 -1.059473
Segment 2
3 coordinate pairs- Description
- M40 southbound between J8 and J7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {9844D55F-10EF-4E69-B612-43EB9363EC6B}
- Linear Element Type
- B Carriageway
- From Distance
- 908 m
- To Distance
- 1,022 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.726917 -1.063005 51.726478 -1.062007 51.72632 -1.061653
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.061653, 51.726320
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.061653,
51.72632
],
[
-1.061016,
51.726093
],
[
-1.060306,
51.725863
],
[
-1.059473,
51.725581
],
[
-1.063005,
51.726917
],
[
-1.062007,
51.726478
],
[
-1.061653,
51.72632
]
]
]
}
View road section coordinates
[
[
[
-1.061653,
51.72632
],
[
-1.061016,
51.726093
],
[
-1.060306,
51.725863
],
[
-1.059473,
51.725581
],
[
-1.063005,
51.726917
],
[
-1.062007,
51.726478
],
[
-1.061653,
51.72632
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jun 30, 2025 2:30 PM
- Record versioned
- Thu, Nov 13, 2025 11:24 PM
- Coordinate source
- Geometry
Related incidents
M40 Northbound Jct 8a to Jct 10 lane 3 closure.
Planned National HighwaysM40 Northbound Jct 8a to Jct 10 lane 3 closure.
M40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure
Planned National HighwaysM40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure
M40 Southbound Jct 7 to Jct 5 lane 3 and lane 2 closures
Planned National HighwaysM40 Southbound Jct 7 to Jct 5 lane 3 and lane 2 closures
M40 southbound, Jct 11 to Jct 10, lane 3 and 2 closure
Planned National HighwaysM40 southbound, Jct 11 to Jct 10, lane 3 and 2 closure
Lanes 2 and 3 closure southbound
Planned National HighwaysLanes 2 and 3 closure southbound
M40 Northbound Jct 4 to Jct 5 hard shoulder closure
Planned National HighwaysM40 Northbound Jct 4 to Jct 5 hard shoulder closure